Loading…

Loading grant details…

Active Development Aid AidData Chinese Aid

Chinese Aid Project The 74MW Moukoukoulou Hydroelectric Power Plant is located on the Bouenza River. It was originally built by Chinese technicians and commissioned in 1979 to supply energy to Pointe-Noire. It is the main source of power to the south of the country. The energy produced by the power plant is injected into the transmission network


Funder Nkayi and Loudima
Recipient Organization Madingou and Dolisie.
Country and the 35 kV transformer substations at Loutété
Start Date Apr 18, 2013
End Date May 11, 2026
Duration 4,771 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID The 74MW Moukoukoulou Hydroelectric Power Plant is located on the Bouenza River. It was originally built by Chinese technicians and commissioned in 1979 to supply energy to Pointe-Noire. It is the main source of power to the south of the country. The energy produced by the power plant is injected into the transmission network
Grant Description

which includes the 110 kV transformer substations at Bouenza Il Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.

All Grantees

and the 35 kV transformer substations at Loutété

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant