FASTAP Transformer for Wind Turbines

€3.94M EUR

Funder European Commission
Recipient Organization Siemens Gamesa Renewable Energy As
Country Denmark
Start Date May 01, 2021
End Date Apr 30, 2024
Duration 1,095 days
Number of Grantees 7
Roles Participant; Coordinator; Third Party
Data Source European Commission
Grant ID 971145
Grant Description

The energy market in general, and the wind energy market in particular, are experiencing constant decrease of prices, together with harsher and harsher grid conditions.

In order to comply with worldwide environmental policies, revolutionary solutions, such as FASTAP, need to reach the market as soon as possible.

The FASTAP project aims at scaling from TRL6 to TRL8 the wind turbine application of a very fast on-load tap changer transformer technology.

This solution uses thyristors specially connected to multi-tap transformer windings to provide On-Load Tap Changer capability to a standard wind turbine (WTG) transformer.

This technology allows to choose the optimum voltage at which the WTG operates in, not only in steady-state conditions but also for dynamic and transient events.

This technology will increase WTGs' electric capabilities in weak grid conditions, enlarge WTGs' Low and High Voltage Ride Through capabilities and allow reducing electrical components oversizing.

As an overall, the FASTAP will be able to reduce wind's Leverage Cost of Energy up to 5.5% and will be able to connect to worldwide grids an additional 71.64GW wind capacity. The consortium partners have been working together for the last three years to bring the technology up to TRL6.

They cover the whole value chain, which guarantees that the product will reach the market 33 months after the project kicks-off: - INF, the market leader in bipolar high-performance semiconductors, brings the technical know-how and commercial capacity for thyristors-based semiconductors. -SGB, number one medium-sized manufacturer of transformers in Europe, brings the technical know-how and commercial capacity for transformers. -SG, WTG market leader, will be the integrator and validator of the FASTAP product into <5MW and >5MW platforms. -MU, the most industrially-oriented University in Spain, was the first originator of the FASTAP concept and will bring FASTAP transformer for Wind Turbines.

All Grantees

Infineon Technologies Bipolar Gmbh& Co. Kg; Mondragon Goi Eskola Politeknikoa Jose Maria Arizmendiarrieta S Coop; Siemens Gamesa Renewable Energy As; Siemens Gamesa Renewable Energy Innovation & Technology S.L.; Starkstrom-Geratebau Gesellschaft Mit Beschrankter Haftung; Siemens Gamesa Renewable Enerji Anonim Sirketi; Sachsisch-Bayerische Starkstrom-Geratebau Gmbh

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant