Loading…

Results for Technology

53,626 grants found

Filters
Reset

Showing 53,44153,460 of 53,626 grants for "Technology"

Completed Mixed
China Eximbank contributes $500 million to $4.6575 billion syndicated loan for Coral South Floating Liquefied Natural Gas Project (Linked to Record ID#57394, ID#57395, and ID#105630)
Export-Import Bank of China (China Eximbank) Coral South FLNG DMCC13 Mozambique 2017 – 2029

BOC, ICBC, China Eximbank contributions to $4.6575 billion syndicated loan for Coral South Floating Liquefied Natural Gas Project In 2013, CNPC Finance (CPFHK) provided a loan to C...

$500K
USD
Completed Mixed
Bank of China contributes $500 million to $4.6575 billion syndicated loan for Coral South Floating Liquefied Natural Gas Project (Linked to Record ID#57399, ID#57395, ID#105630)
Bank of China (BOC) Coral South FLNG DMCC13 Mozambique 2017 – 2027

BOC, ICBC, China Eximbank contributions to $4.6575 billion syndicated loan for Coral South Floating Liquefied Natural Gas Project In 2013, CNPC Finance (CPFHK) provided a loan to C...

$500K
USD
Completed Mixed
ICBC contributes $550 million to $4.6575 billion syndicated loan for Coral South Floating Liquefied Natural Gas Project (Linked to Record ID#57394, ID#57399, ID#105630)
Industrial and Commercial Bank of China (ICBC) Coral South FLNG DMCC13 Mozambique 2017 – 2031

BOC, ICBC, China Eximbank contributions to $4.6575 billion syndicated loan for Coral South Floating Liquefied Natural Gas Project In 2013, CNPC Finance (CPFHK) provided a loan to C...

$550K
USD
Completed Development
China Development Bank provides $150 million loan for ICT Enhanced Surveillance Project (Linked to Record ID#2034, #58586, #86361, and #85282)
China Development Bank (CDB) Government of Ghana Ghana 2013 – 2033

China Development Bank provides $150 million loan for ICT Enhanced Surveillance Project On December 16, 2011, China Development Bank and the Government of Ghana signed a $3 billion...

$150M
USD
Active HORIZON EUR
An Open Innovation Ecosystem for exploitation of materials for building envelopes towards zero energy buildings
European Commission Uni Systems Systimata Pliroforikis Monop... Greece 2023 – 2026

Building sector is responsible for 40% of energy consumption and 36% of CO2 emissions in the EU. As nZEB becomes the new standard, the role of building materials and smart envelope...

€12.92M
EUR
Active HORIZON EUR
Building Green and Climate Neutral City-Hubs
European Commission Anci Toscana Associazione Italy 2023 – 2026

CLIMABOROUGH is an Innovation project designed to field test the ClimHub, Climate Sandbox and Climate Service concepts within 12 European Cities engaged in their ecological and dig...

€11.41M
EUR
Active HORIZON EUR
Driving agroecological transitions in the humid tropics of Central and Eastern Africa through traNsdisciplinary Agroecology Living LabS (CANALLS)
European Commission Centre de Cooperation Internationale En... France 2023 – 2026

The humid tropics of Central and Eastern Africa hold much promise for enhancing food and nutritional security within and beyond Africa. With a rich variety of agroecological zones...

€6.65M
EUR
Active HORIZON EUR
A comprehensive CAD system based on radiologic- and pathologic-image biomarkers for diagnosis and prognosis of breast cancer relapse
European Commission Universitat Rovira I Virgili Spain 2022 – 2026

Breast cancer (BC) incidence in women produces more than 600,000 deaths each year. The primary cause of death in BC patients is metastasis, whereby cancer cells spread from their p...

Active HORIZON EUR
A leap towards SAE L4 automated driving features
European Commission Its Norge-Norsk Forening for Multimodale... Norway 2022 – 2026

The introduction of connected, cooperative and automated mobility (CCAM) can make a significant improvement to logistic chains. The MODI project will identify and largely resolve b...

€27.99M
EUR
Completed HORIZON EUR
LESSEN DATA ACCESS AND GOVERNANCE OBSTACLES
European Commission Engineering - Ingegneria Informatica Spa Italy 2022 – 2025

LAGO will deliver the foundation for a trusted EU FTC Research Data Ecosystem (RDE) to address the so-called “Data Issue” in the FCT research landscape, i.e., the lack of domain-sp...

€7.38M
EUR
Active HORIZON EUR
Consortium Europe-Africa for Research and Innovation on Food Systems Transformation
European Commission Forum for Agricultural Research in Afric... GH 2023 – 2027

CEA-FIRST, the Consortium Europe Africa on Research and Innovation for Food Systems Transformation, consists of 21 partners from Africa and Europe, partly from the former LEAP4FNSS...

Completed H2020 EUR
Protection of Critical Infrastructures from advanced combined cyber and physical threats
European Commission Electricite de France France 2021 – 2023

PRAETORIAN strategic goal is to increase the security and resilience of European CIs, facilitating the coordinated protection of interrelated CI against combined physical and cyber...

€9.04M
EUR
Completed H2020 EUR
EMERGING VIRAL DISEASES IN TOMATOES AND CUCURBITS: IMPLEMENTATION OF MITIGATION STRATEGIES FOR DURABLE DISEASE MANAGEMENT
European Commission Katholieke Universiteit Leuven Belgium 2021 – 2025

Viral diseases can cause severe losses to vegetable crop production which has an estimated annual value of 34,5 billion EUR in Europe. Therefore several billions are lost every yea...

€7.36M
EUR
Active Mixed
[Cancelled] China Eximbank provides $257.9 million preferential buyer’s credit for Phase 1 of Safe City Project
Export-Import Bank of China (China Eximbank) Government of the Philippines Philippines 2021 – 2029

[Cancelled] China Eximbank provides $257.9 million preferential buyer’s credit for Phase 1 of Safe City Project On October 20, 2016, China Eximbank and the Government of Philippine...

$275.94M
USD
Completed Mixed
China Eximbank provides $186 million buyer’s credit for Lot 1 of Oil Roads Upgrading Project (Linked to Record ID#59742 and #59743)
Export-Import Bank of China (China Eximbank) Government of Uganda Uganda 2020 – 2027

China Eximbank provides $186 million buyer’s credit for Lot 1 of Oil Roads Upgrading Project On March 18, 2020, China Eximbank and the Government of Uganda signed a $186,055,240.64...

$186.06M
USD
Active Development
Bank of China contributes $114 million to syndicated loan for 1320 MW Vân Phong 1 Supercritical Coal-Fired Power Plant Project
Bank of China (BOC) Van Phong Power Company Limited (VAN PHO... Viet Nam 2019 – 2030

BOC contribution to $1.988 billion syndicated loan for 1320 MW Vân Phong 1 Supercritical Coal-Fired Power Plant Project In January 2011, the Vân Phong Economic Zone Management Auth...

$114M
USD
Active Development RMB
China Eximbank provides RMB 485 million government concessional loan for Phase 3 of NetOne Expansion Project (Linked to Record ID#62426, #62416, #62417)
Export-Import Bank of China (China Eximbank) Government of Zimbabwe Zimbabwe 2019 – 2030

China Eximbank provides RMB 485 million government concessional loan for Phase 3 of NetOne Expansion Project On June 1, 2010, China Eximbank and the Government of Zimbabwe signed a...

¥485M
RMB
Active Mixed
CDB provides $215 million buyer’s credit loan for Vientiane Power Grid Modernization Project
China Development Bank (CDB) Government of Laos Lao People's Democratic Republic 2017 – 2029

CDB provides $215 million buyer’s credit loan for Vientiane Power Grid Modernization Project On November 13, 2017, China Development and the Government of Laos signed a $215 millio...

$215M
USD
Completed Mixed
China Eximbank provides $100.8 million preferential buyer’s credit for Construction and Equipping of Vocational Training and Development Centers Project
Export-Import Bank of China (China Eximbank) Government of Gabon Gabon 2015 – 2027

China Eximbank provides $100.8 million preferential buyer’s credit for Construction and Equipping of Vocational Training and Development Centers Project On November 11, 2015, China...

$100.88M
USD
Active Development
China Development Bank pledges $42 million loan for 34.6 MW Ulog Hydroelectric Dam Project
China Development Bank (CDB) EFT HE Ulog d.o.o Bosnia and Herzegovina 2012 – 2029

China Development Bank pledges $42 million loan for 34.6 MW Ulog Hydroelectric Dam Project In November 2009, the Government of the Republic of Srpska granted a 33.5-year concession...

$42M
USD