Completed Mixed AidData Chinese Aid

Bank of Communications participates in $975 million syndicated loan for Phase 1 of Chancay Multipurpose Port Terminal Construction Project

$162.5M USD

Funder China Bank of Communications (BoCom or BoComm)
Recipient Organization COSCO SHIPPING Ports Chancay Perú S.A. (CSP Chancay)
Country Peru
Start Date Mar 28, 2023
End Date Dec 18, 2032
Duration 3,553 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 99565
Grant Description

BOC, BoComm, and SRCB contributions to USD 975 million syndicated loan for Phase 1 of Chancay Multipurpose Port Terminal Construction Project in Peru in 2023 On February 10, 2021, Peru's National Port Authority (Autoridad Portuaria Nacional or APN) signed a concession agreement with COSCO SHIPPING Ports Chancay Perú S.A. (CSP Chancay), granting it the exclusive right to operate a new, multipurpose seaport in the small coastal city of Chancay (located 78 km north of Lima).

Then, on March 28, 2023, a syndicate composed of Bank of China (Hong Kong) Limited, the Shanghai Branch of Bank of China Limited, the Grand Cayman Branch of Bank of China Limited, Bank of Communications Co., Ltd, the Shanghai Pilot Free Trade Zone Branch of China Minsheng Banking Corp., Ltd, and Shanghai Rural Commercial Bank Co., Ltd, signed a $975 million syndicated term facility (loan) agreement with CSP Chancay -- a special purpose vehicle that is 60% owned by COSCO SHIPPING Ports, a Hong Kong listed company, and 40% owned by Volcan Compañía Minera S.A.A. (Volcan), a Peruvian listed company — for Phase 1 of the Chancay Multipurpose Port Terminal Construction Project.

📋 Loan / Grant Terms
💰 Loan Amountcarried a 15 year maturity and an interest rate of SOFR rate (simple daily average) plus 1
📅 Maturity15 years

It was secured by (i.e. collateralized against) shares of CSP Chancay, an all-assets pledge, an accounts pledge, a land and concession mortgage, and direct agreements with project contractors. The loan proceeds were to be used for by the borrower to cover 72.22% of the $1.3 billion cost of Phase 1. The Port of Chancay is located about 58 km north of Lima.

It is a natural deep-water harbour, which will allow the handling of cargo through a port operational zone, an entrance complex and an underground viaduct tunnel. It is intended to be Peru's first private port for public use.

It is a deep water port, with a maximum water depth of 17.8 meters and will be able to handle ultra-large container ships.

It will be multipurpose, able to handle all types of cargo: containerized, general, non-mineral bulk, liquid, and rolling.

The overall project contains three major sections: the port operational zone where the port activities themselves occur, an entrance complex, and an underground 1.8km viaduct tunnel that connects the two. Phase 1 is expected to take up 141 hectares and have a total designed annual throughput of 1 million TEUs.

It will include, in the port operational zone, the maritime approach and maneuvering channels for ships; the shelter breakwater south of Punta Chancay; and the first 4 berths (docks). Berths 1 and 2 will be part of the Bulk, General Cargo and Rolling Terminal.

More specifically, Berth 1 will be a multipurpose dock to handle solid/liquid bulk and rolling cargo, while Berth 2 will focus on general cargo and non-containerized loose cargo ships, as well as Ro / Ro type ships for rolling cargo. Berths 3 and 4 will be specialized to serve container ships.

Per the project website, ‘they will have modern high-tech equipment for loading, unloading and transfer of containers, storage yards, administrative areas, service areas and the workshops that are required for the efficient operation of the terminal.’ Phase 1 will also include the construction of the 1.8 km underground viaduct tunnel and an access road interchange from the Pan-American highway to the entrance complex's vehicular foreport.

Shanghai Zhenhua Heavy Industries Co., Ltd (ZPMC) was contracted to provide port machinery equipment for Phase 1, three portal cranes for Berth 1 and 2 and six remote-controlled STS cranes and 15 double cantilever automated stacking cranes (ASCs) for the container berth. The Chancay Port terminal has gone through several iterations.

Preliminary design and feasibility studies began as early as May 2008, with designs changed in January 2013 and July 2015. Preliminary works and earthworks began in May 2016 but stopped in April 2018. Shortly after, in June 2018, the project was redesigned, with a larger capacity port envisioned.

Then, in January 2019, COSCO signed the investment agreement to acquire its 60% stake in the project's SPV, officially becoming the majority owner on May 13, 2019. In June 2019, construction on the tunnel portal and a camp for 1500 project workers began, completed by December 2020.

This was followed by the beginning of construction of the tunnel and access roads in March 2021 and the port's operational zone itself in May 2021. Peru's National Port Authority granted the Port Qualification on February 11, 2021.

The terminal is expected to be fully operational by November 2024 — ahead of Xi Jinping’s expected visit to Peru for the Asia-Pacific Economic Cooperation (APEC) summit that month. Five double-cantilever automated rail cranes (ARMGs) from ZPMC were delivered in June 2024. Three bulk cargo portal cranes and three portal cranes from ZPMC were delivered in July 2024.

Three rail-mounted gantry cranes and six portal crane hoppers from ZPMC were delivered in August 2024. The port was officially inaugurated on November 14, 2024. The project has also been subject to some controversy.

Despite an initial Environmental Impact Study (EIS) being approved in December 2013 and an amendment to the EIS (referred to as MEIA-d for its Spanish-language name) for the updated port design being approved on December 22, 2020, concerns about potential environmental impacts were voiced by local residents.

Additionally, several social and environmental organizations have argued that many issues raised (by both authorities and civil society groups) prior to the approval of the updated MEIA-d were not adequately addressed by the company.

Concerns from residents and civil society groups include the contamination of the nearby Santa Rosa wetlands, negative impacts on air quality via the expulsion of toxic PM10 and PM2.5 dust, effects of dredging and sediment discharge, and noise pollution.

A group of citizens appealed the updated MEIA's approval by the National Environmental Certification Service for Sustainable Investments (SENACE), but SENACE rejected the appeal in March 2021.

As early as March 2017, residents additionally reported damage to their homes as a result of vibrations from pre-construction and earthworks activities.

CSP Chancay reportedly has paid for some minor repairs to local homes following complaints, but, as of a May 2021 report, residents indicated that the damage was continuing.

In March 2024, APN asserted that CSP Chancay was mistakenly granted exclusivity to operate the Chancay multipurpose port terminal, which in turn led to a proposal to open the facility to other companies offering similar operational services.

Carlos Tejada, the Adjunct General Manager of CSP Chancay, responded by conveying the concerns of CSP Chancay shareholders to a congressional committee.

He warned that regulatory and policy uncertainty could jeopardize financing for future stages of the port development project.

He also noted that CSP Chancay's Chinese lenders had registered concern because the exclusive operator status of CSP Chancay is crucial for the port's business model (as it would allow the company to generate revenue by charging for services such as loading and unloading shipping containers).

Chinese lenders also reportedly warned that a shift to a multi-operator model, as proposed by Peruvian authorities, could reduce the revenues of CSP Chancay, thereby impacting the project's financial viability and the return on investment for CSP Chancay's shareholders.

Then, in June 2024, ahead of Peruvian President Dina Boluarte's five-day tour of China (that includes a meeting with Xi Jinping in Beijing), the Government of Peru formally withdrew its legal petition to block CSP Chancay from having exclusive rights to operate the Chancay Multipurpose Port Terminal.

The Government of Peru attributed the dispute to an 'administrative error.'

📋 Staff Comments
  1. The exact monetary size of each banks contribution to the loan syndicate is unknown. For the time being, AidData assumes equal contributions across the six known members of the syndicate ($162.5 million).
  2. AidData has coded the implementation start date based off the start of construction on the recent iteration on the port (with involvement of COSCO Shipping and the expanded capacity): June 20193. CSP Chancay was originally named Terminales Portuarios Chancay SA (TPCH) and was 100% owned by Volcan. On January 23, 2019, COSCO officially signed the subscription and investment agreement with Volcan to acquire a 60% stake in TPCH for $225 million USD. COSCO officially became the majority owner of TPCH on May 13, 2019, and TPCH was renamed CSP Chancay in August 2019. Project ID#72128 captures COSCO's investment in TPCH and, by extension, the Chancay Port project.
  3. Bank of China (Peru) is the Security Agent for the transaction.
  4. Bank of China (Hong Kong) Limited, the Shanghai Branch of Bank of China Limited, and the Grand Cayman Branch of Bank of China Limited are the joint mandated lead arrangers and book runners.
  5. Firms involved in the transaction were Mayer Brown as international counsel to the lenders, Appleby as Bermuda and BVI counsel to the lenders, Rebaza Alcázar & De Las Casas as counsel of Volcan, Holman Fenwick Willan as international counsel to CSP Chancay, and Payet Rey Cauvi Pérez Abogados as Peruvian counsel to CSP Chancay. Rebaza Alcázar & De Las Casas team included partners Alberto Rebaza, and Luis Miguel Elías, and associates Rafael Santin and Josefina Arana. Garrigues’ team was led by partner Diego Harman (pictured), with support from associates María José Cardoza and Eduardo Ortega.
  6. The Chinese project title is 秘鲁钱凯港项目.
  7. Cosco Shipping bought into the greenfield project in January 2019, by acquiring a 60% stake in Terminales Portuarios Chancay from Volcan. As CSP Chancay owns the land of the terminal and doesn’t need to pay for any concession rights, the loan proceeds are being focused on the development of the terminal.
  8. For loan and debt rescheduling records with variable interest rates, AidData calculates the all-in interest rate at T0 based on the reference rate (such as LIBOR or EURIBOR) on the loan start date, plus any known margin. Please see the methodology for additional details.
📚 Sources & References
  • Garrigues acts on $975m loan for Chancay Multipurpose Port
  • SHEARMAN & STERLING ADVISES VOLCAN COMPAÑÍA MINERA IN CHANCAY PORT PROJECT FINANCING
  • Volcan Compañía Minera S.A.A. and Subsidiaries Consolidated interim financial information (unaudited) as of September 30, 2021 and 2020
  • The Company
  • Peruvian port agrees financing
  • Chancay Multipurpose Terminal Phase I
  • The Project
  • Chancay: El megapuerto peruano que sacude a un pueblo
  • 中远海运秘鲁钱凯码头项目, 2020 SUSTAINABILITY REPORT
  • 中远秘鲁新港口有望今年4月开工建设
  • 中远海运秘鲁钱凯项目正式交割
  • SIGNIFICANT PROJECTS BACKED BY BOC
  • 驻秘鲁大使梁宇考察钱凯港项目
  • 秘鲁钱凯港项目一期工程码头上部结构施工全面铺开
  • 秘鲁钱凯多功能港口项目副经理乔明:“用实际行动保护美丽钱凯”
  • Garrigues advises on US$975 million Project Financing for Chancay Multipurpose Port in Peru
  • Chinese banks lend US$975 million for Peru port terminal
  • Chinese Investment in Europe: A Financing Perspective
  • Megapuerto en Chancay: vecinos denuncian que obras destruyen humedales y causan daños ambientales
  • Ministro Juan Barranzuela acuerda con Embajada China facilitar una solución técnica para obras cuestionadas
  • China widens South America trade highway with Silk Road mega port
  • Garrigues advises on US$975 million Project Financing for Chancay Multipurpose Port in Peru
  • Port Financing of the Year: Chancay Port Financing
  • PORT FINANCING OF THE YEAR: CHANCAY PORT FINANCING
  • RB-013-2023 Ref: Hecho de Importancia
  • 中国银行:成为共建繁荣丝路中的重要金融力量
  • Peru eases Chinese port dispute ahead of president's meeting with Xi
  • Resolución de Acuerdo de Directorio N.° 0008-2021-APN-DIR
  • L'autorità portuale nazionale peruviana ha revocato la concessione di esclusiva del nuovo porto di Chancay a COSCO
  • Peruvian Regulator Upsets Cosco With Ruling on Chancay Port
  • Chancay Multipurpose Port Terminal
  • Xi inaugurates South America's first Chinese-funded port
  • 中秘两国元首宣布钱凯港开港
  • Los silencios de Chancay, el mayor puerto comercial de Sudamérica que se levanta en Perú
  • Peru’s Chancay Port and the Risks of China’s Growing Influence
  • Chinese Lenders Raise Concerns About 1.3 Billion Peru Port Deal
  • Chinese Port In Peru Faces Surprise Challenge to Business Model
  • List of Practical Cooperation Deliverables of the Third Belt and Road Forum for International Cooperation, 16 Projets d'infrastructures pour l'integration de l'afrique
  • Zpmc Delivers Final Equipment For Chancay’S Phase I Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

COSCO SHIPPING Ports Chancay Perú S.A. (CSP Chancay)

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant