ICBC contributes to $129.2 million syndicated buyer’s credit loan for 150 MW Kodda Power Plant Project (Linked to Record ID#53583)

$64.63M USD

Funder Industrial and Commercial Bank of China (ICBC)
Recipient Organization Bangladesh Rural Power Company Limited (B-R Powergen)
Country Bangladesh
Start Date Jul 02, 2013
End Date May 07, 2031
Duration 6,518 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 98764
Grant Description

China Eximbank and ICBC contributions to $129.2 million syndicated buyer’s credit loan for 150 MW Kodda Power Plant Project On July 2, 2013, the Export-Import Bank of China and the Industrial and Commercial Bank of China (ICBC) and BR Powergen Limited (or BR Powergen Ltd.) signed a $129,264,152.64 syndicated buyer’s credit loan agreement to build the 150MW Kodda Power Plant in the Gazipur District of Dhaka.

AidData assumes that both members contributed equally ($64,632,076.32 each) (captured in Record ID#53583 and #98764).

The 50 MW Kodda Power Plant Project was implemented as an independent power project (IPP) basis and financed according to a debt-to-equity ratio of 85:15.

📋 Loan / Grant Terms
💰 Loan Amountloan agreement with China Eximbank and ICBC carries the following terms: a maturity period of 12 years

Loan repayments were to be sent to China Eximbank and ICBC every 6 months, with the first payment taking place in July 2016. The Government of Bangladesh provided a sovereign guarantee for this loan on October 23, 2013.

BR Powergen Limited was established as a public limited company by Bangladesh Power Development Board (BPDB) and Rural Power Company Limited (RPCL) under the Power Division of the Government of Bangladesh’s Ministry of Power, Energy, and Mineral Resources. BPDB and RPCL each hold a 50% ownership stake in BR Powergen Limited.

China National Electric Import & Export Corporation, Jiangsu Construction Engineering Company, and Fujian Electric Power Engineering Company formed a consortium to construct the power plant.

BR Powergen signed an engineering, procurement, and construction (EPC) contract with this consortium on January 3, 2013. The proceeds of the syndicated buyer’s credit loan were intended to pay for 85% of the EPC contract value.

Then, on November 3, 2013, BR Powergen signed a Power Purchase Agreement with the Bangladesh Power Development Board (BPDB). It also signed a fuel supply agreement on December 5, 2013. MAN Diesel & Turbo SE of Germany manufactured the plant's engine.

Construction of the Kodda Power Plant began on January 28, 2014, and it was put into commercial operation on August 15, 2015. The plant runs on two fuel sources: heavy fuel oil and gas.

According to B-R Powergen's 2017-2018 Annual Report, the EPC contract with the consortium of Chinese firms was worth $155,842,358.61.

The project had an additional cost of R8,224,274.00 for insurance, which BR Powergen paid to the Ministry of Finance of Bangladesh. BR Powergen and the Ministry of Finance signed their agreement on October 23, 2013. As at June 30, 2021, the Government of Bangladesh reported that $64,632,082 USD was left as the closing balance.

📋 Staff Comments
  1. For loan and debt rescheduling records with variable interest rates, AidData calculates the all-in interest rate at T0 based on the reference rate (such as LIBOR or EURIBOR) on the loan start date, plus any known margin. Please see the methodology for additional details.
  2. At the start of 2017, BR Powergen still owed 9,988,130,809 BDT. During 2017, it paid 1,024,418,309 BDT, but its outstanding debt increased by 76,589,003 BDT after adjusting for foreign exchange risk. During 2018, BR Powergen paid 1,066,105,994 BDT, reducing its outstanding debt to 7,974,195,509 BDT. By June 2021, the total outstanding debt was 6,588,594,235 BDT.
  3. The exact size of ICBC and China Eximbank's respective financial contributions to the $129.2 million syndicated loan are unknown. For the time being, AidData assumes that both of the lending syndicate contributed equal amounts ($64,632,076.32).
📚 Sources & References
  • China's Global Energy Finance
  • Kodda 150 MW Power Plant
  • Annual Report
  • Completion of KODDA 150MW Power Plant Project, http://www.ccceng.cn/En/news_detail.aspx?NewsCateID=94&NewsID=94&CateID=39
  • ANNUAL REPORT 2017-2018
  • 王子建参赞出席电站项目主权担保协议签约仪式
  • MAN Energy Solutions Discover I MAN Energy Solutions Kodda A powerplant near Bangladesh's capital helping to meet growing energy requirements A powerplant near Bangladesh's capital helping to meet growing energy requirements
  • B-R PowerGen Limited Financial Statements
  • Performance evaluation of public-private partnerships (PPPs) in developing countries: A case study of Bangladesh
  • B-R PowerGen
  • ANNUAL REPORT 2017-2018
  • List of Guarantee
  • BUYER'S CREDIT SYNDICATED LOAN Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Bangladesh Rural Power Company Limited (B-R Powergen)

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant