Loading…

Loading grant details…

Active Mixed AidData Chinese Aid

China Eximbank provides overseas project contracting loan for Amador Cruise Terminal Construction Project


Funder Export-Import Bank of China (China Eximbank)
Recipient Organization China Harbour Engineering Co., Ltd. (CHEC)
Country Panama
Start Date Jan 01, 2017
End Date Dec 30, 2032
Duration 5,842 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 98577
Grant Description

China Eximbank provides overseas project contracting loan for Amador Cruise Terminal Construction Project In July 2017, Panama Maritime Authority (AMP) awarded a $165.7 million contract to Cruceros del Pacífico (CCP), a consortium made up of China Harbour Engineering Company (CHEC) and Jan de Nul Panamá (JDN), for the Amador Cruise Terminal Construction Project.

The Hubei Branch of the Export-Import Bank of China issued an overseas project contracting loan (外承包工程款) to CHEC to support its participation in the project.

📋 Loan / Grant Terms
💰 Loan Amountare unknown

The purpose of the project is to design, develop and build the Amador Cruise Terminal at the Panama Canal Pacific entrance.

The terminal is expected to have capacity to accommodate two ships of 360 meters in length, with a capacity of 5,000 passengers per vessel, in an area whose draught must reach 10.5 meters and be able to receive cruise ships at any time of day, regardless of the condition of the tide. The terminal is expected to have an area with parking for 300 vehicles, 60 spaces for buses and 25 spaces for trucks.

An environmentally friendly administrative building of approximately 10,800 square meters is to be built to serve the 10,000 passengers when the port is in full operation.

This building is expected to have a green building certification, with more than two hectares as a green area and paths, which should be integrated with the other spaces included in the project.

The cruise terminal is expected to be a public port and be administered by the AMP, a measure aiming at ensuring that this terminal provides quality service to all operators using it and not limit the use to any cruise company in particular. AMP issued a notice to proceed (NTP) to JDN and JDN on October 5, 2017.

The project was originally expected to reach completion within 24 months (October 5, 2019). However, work was suspended during the COVID-19 pandemic.

The cruise ship pier itself was finished in February 2020 and the overall project completion rate was 76% as of March 2023.

📋 Staff Comments
  1. Overseas Project Contracting Loans (In Chinese: 外承包工程款) are provided by China Eximbank to help Chinese companies finance overseas project contracts. They can be denominated in USD or RMB. Per China Eximbank policy, the contract cost that is financed by the should not be lower than 1 million USD. Goods and services exported from China under the contract should not be lower than 15% of contract cost.
  2. The Spanish project title is Construcción de una terminal de crucero, Amador Isla Perico.
  3. The precise loan commitment date is unknown. For the time being, AidData assumes the the overseas project contracting loan was issued in the year when construction began (2017). This issue warrants further investigation.
📚 Sources & References
  • 2019年中国进出口银行湖北省分行运行情况
  • 魏强大使考察巴拿马阿玛多尔邮轮码头项目
  • 巴拿马总统巴雷拉出席中国港湾承建的巴拿马阿玛多尔邮轮码头项目开工仪式
  • 中国港湾巴拿马阿马多尔邮轮码头项目码头主体正式移交并投入使用
  • Panama updates Amador cruise terminal works
  • CHEC Starts Construction on Panama City Cruise Terminal
  • Panama Cruise Terminal Website
  • LA CONTRALORÍA GENERAL DE LA REPÚBLICA MUESTRA SU COMPLACENCIA DURANTE LA INSPECCIÓN REALIZADA A LA TERMINAL DE CRUCEROS DE PANAMÁ ---------- Todo el contenido de https://amp.gob.pa/ pertenece a la AUTORIDAD MARITIMA DE PANAMA . razón por la cual, el material publicado no se puede reproducir o copiar o transmitir sin previa autorización. Le agradecemos su cooperación y sugerencias a [email protected] o llámenos al 501-5000.
  • AUTORIDAD MARÍTIMA DE PANAMÁ PROYECTOS DE INVERSIÓN 2020
  • Panamá: Anulan licitación para operar puerto de cruceros de Amador
  • China’s advance in Panama: An update
  • Belgium-China consortium wins $166m Panama cruise terminal contract
  • ABSTRACT OF AMADOR´S CRUISE TERMINAL PROJECT
  • ANALYSIS OF PIANC GUIDELINE AND ROM STANDARD IN DESIGN OF APPROACH CHANNEL AND HARBOR BASIN
  • EL PUERTO DE CRUCEROS DE PANAMÁ RECIBE LA VISITA DEL VICEPRESIDENTE DE SERVICIOS DE NORWEGIAN CRUISE LINE Y SE ABRE LA POSIBILIDAD QUE ATRAQUEN CRUCEROS DE MÁS CAPACIDAD. ---------- Todo el contenido de https://amp.gob.pa/ pertenece a la AUTORIDAD MARITIMA DE PANAMA . razón por la cual, el material publicado no se puede reproducir o copiar o transmitir sin previa autorización. Le agradecemos su cooperación y sugerencias a [email protected] o llámenos al 501-5000.
  • ESTUDIOS
  • DISEÑOS
  • DESARROLLO Y APROBACIÓN DE PLANOS
  • Y CONSTRUCCIÓN DE LA TERMINAL DE CRUCEROS DE PANAMÁ
  • ISLA PERICO
  • PANAMÁ
  • Terminal de Cruceros de Amador
  • 中交集团承建的巴拿马阿马多尔邮轮码头正式开业
  • 巴拿马总统出席阿马多尔邮轮码头开业仪式
  • 中企承建巴拿马阿马多尔邮轮码头正式启用, 2024 年中国交建优秀设计获奖项目及突出贡献者名单 Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

China Harbour Engineering Co., Ltd. (CHEC)

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant