Completed Mixed AidData Chinese Aid

China Eximbank provides RMB 710 million overseas investment loan for Palembang Timur 150MW Gas-fired Power Plant Construction Project

¥710K RMB

Funder Export-Import Bank of China (China Eximbank)
Recipient Organization China National Chemical Engineering Corporation (CNCEC)
Country Indonesia
Start Date Apr 01, 2003
End Date Mar 29, 2029
Duration 9,494 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 98549
Grant Description

China Eximbank provides RMB 710 million overseas investment loan for Palembang Timur 150MW Gas-fired Power Plant Construction Project In 1996, PT Asrigita Prasarana, a subsidiary owned through PT Astratel.

Nusantara (“Astratel”), entered into a Power Purchase Agreement with Persero — Indonesia’s state-owned power utility — for PT Asrigita Prasarana to design, finance, construct, own and operate the Palembang Timur 150MW Gas-fired Power Plant. However, due to unfavorable economic conditions in the country, the implementation of the project was postponed.

Then, in March 2003, China Eximbank provided an RMB 710 million overseas investment loan to China National Chemical Engineering Co., Ltd. (CNCEC) for the the Palembang Timur 150MW Gas-fired Power Plant Construction Project.

One month later, in April 2003, a consortium consisting of China National Chemical Corporation (CNCC) and Chengdu Engineering Corporation of China (CECC) acquired an 85% ownership stake in PT Asrigita Prasarana, a special purpose vehicle that is legally responsible for designing, implementing, and financing the Palembang Timur 150MW Gas-fired Power Plant Construction (IPP) Project on a BOOT basis.

CNCEC on-lent the proceeds of the overseas investment loan to PT Asrigita Prasarana.

📋 Loan / Grant Terms
💰 Loan Amountare unknown

However, it is known that Sinosure provided an insurance policy. The purpose of the project was to construct the Palembang Timur 150MW Gas-fired Power Plant in South Sumatra Province. CNCEC and CNCC were the contractors responsible for project implementation. Construction began in September 2003.

The power plant was connected to the power grid on August 31, 2004 and officially inaugurated by Indonesia’s President on November 9, 2004.

📋 Staff Comments

1. This project is also known as the  Palembang GFCC Power Plant . The Chinese project title is 以BOOT形式承揽印尼巨港电站项目 or 中国化学印尼巨港电站BOOT项目.

📚 Sources & References
  • 31 DECEMBER 2002 AND 2001 CONSOLIDATED FINANCIAL STATEMENTS
  • China Eximbank Annual Report 2003
  • OFFICIALLY SUPPORTED EXPORT CREDITS IN A CHANGING WORLD
  • PT PERUSAHAAN LISTRIK NEGARA U.S.$15,000,000,000 Global Medium Term Note Program
  • BAGIAN A. QUALITY ASSURANCE & QUALITYCONTROL (QA/QC) PLANNING
  • Overhaul PLTU Palembang Timur 1x150 MW
  • Invasi Rusia
  • Ukraina Pindah Hari Raya Natal dan Batalkan Pemilu Legislatif
  • Indonesia Palembang 150MW Gas-fired Power Station Project
  • Kongsi Cina dan Listrik Palembang
  • Turnkey Projects & EPC, 2017 Government of Indonesia Bond Prospectus
  • 海外种下摇钱树 印尼建厂中国人国外收电费
  • 经典案例学习——中国化学印尼巨港电站BOOT项目的几点启示
  • 中国首例以BOOT方式境外电力工程项目获得贷款
  • 中国在印尼首例BOOT电站如何成功运作
  • 印尼总统苏西洛出席我企业在印尼兴建的电站启用仪式
  • 中国企业承建的印尼巨港电站开始闭环发电
  • 中国进出口银行与东盟往来密切 贷款超五百亿元 Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

China National Chemical Engineering Corporation (CNCEC)

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant