ICBC provides $140 million equity bridge loan to BPC for 600MW Morupule B Power Plant Construction Project (Linked to Record ID#40)

$140M USD

Funder Industrial and Commercial Bank of China (ICBC)
Recipient Organization Botswana Power Corporation
Country Botswana
Start Date Jun 15, 2009
End Date Apr 06, 2026
Duration 6,139 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 98173
Grant Description

ICBC provides $140 million equity bridge loan to BPC for 600MW Morupule B Power Plant Construction Project On June 15, 2009, the Industrial and Commercial Bank of China (ICBC) and Botswana Power Corporation (BPC) — a state-owned power company in Botswana — signed a $825,048,559.40 export credit facility agreement for the 600MW Morupule B Power Plant Construction Project.

📋 Loan / Grant Terms
💰 Loan Amountcarries the following borrowing terms: a 20-year maturity
📅 Maturity20 years
⏳ Grace Period3.5 years

The borrower was expected to repay the loan between December 2012 to June 2029.

It was also expected to use the loan proceeds to finance 85% of the cost of a $970 million commercial (EPC) contract with China National Electric Equipment Corporation (CNEEC), which was signed in November 2008.

Sinosure and the World Bank insured the buyer's credit loan (export credit facility) and the Government of Botswana’s Ministry of Finance also provided a sovereign guarantee.

As an additional credit enhancement, the borrower agreed to maintain a minimum cash balance of $33 million (equivalent to one principal and interest repayment/installment) in a Debt Service Reserve Account (DSRA).

The Government of Republic of Botswana funded the DSRA with P300 million while Botswana Power Corporation paid the balance of P48 million. The total cost of the Morupule B Power Project was $1.6623 billion. It was financed according to a 70:30 debt-to-equity ratio.

ICBC contributed $825 million of debt financing, while the World Bank, and the African Development Bank contributed $136.4 million and $202.5 million of debt financing, respectively. The 30% equity contribution ($498.4 million) came from Botswana Power Corporation and the Government of Botswana.

In addition to the long-term (20-year) export credit facility, ICBC provided a short-term $140 million equity bridge loan to the project sponsor (BPC) to ensure that it could meet its equity contribution requirement.

📋 Loan / Grant Terms
💰 Loan Amountare unknown

However, it is known that the loan was guaranteed by Standard Bank.

📋 Loan / Grant Terms
💰 Loan Amountfacility – a cross-currency swap designed to convert US dollar funding into fixed rate synthetic Botswana Pula

The project involved the construction of a 600MW coal-fired power plant consisting of 4x150MW units — that uses circulating fluidized bed technology — for domestic power generation purposes.

The 600MW Morupule B power plant is located in the township of Palapye, northeast of Gaborone, and it is geographically adjacent to the existing 132MW Morupule A power plant. It sources feedstock from the same mine as the existing 132MW Morupule A plant.

The project has three main components: the Morupule B Power Station; a 400kV Morupule B–Phokoje transmission system and associated sub-stations linking the plant to the BPC grid; and a 35-borehole well-field and associated water reticulation system. The coal is sourced from the Morupule coal mine, which is the only major operating coal mine in Botswana.

The Morupule coal mine is operated by Morupule Colliery Limited, a subsidiary of Debswana Diamond Company. China National Electric Equipment Corporation (CNEEC) was the general EPC contractor responsible for implementation. Shenyang Blower Works (Group) Co., Ltd (SBW) also supported the project as a subcontractor.

Site and contractor’s camp accommodation facilities as well as bush clearing activities started in early June 2009 and were effectively completed by the end of July 2009, which facilitated CNEEC-SBW to undertake Topographical Survey and Geotechnical Investigation to confirm the design parameters associated with the in-situ ground geological data at the site area.

The erection of the contractor’s camp facilities started in November 2009. The camp had the capacity to accommodate approximately 1,500 staff. The project's official EPC contract commencement date was April 29, 2009. However, the project's groundbreaking ceremony did not take place until February 19, 2010.

It was originally envisaged that the power plant would become operational by October 2012.

However, the project experienced significant delays and CNEEC did not hand over the four power generation units to the BPC until May 4, 2014.

Then, in October 2014, three of the four power generation units broke down, and the Government of Botswana had needed to consider importing energy from South Africa.

The power plant was originally expected to operate at the annual capacity factor of about 80 percent, with annual gross generation of about 4,200 gigawatt-hour (GWh).

However, the plant’s capacity factor was closer to 50 percent, reflecting poor availability and unreliability of the units due to forced outages. Units 1-4 had the capacity to produce 600MW, but they only operated at 21 percent capacity producing only 130MW.

According to BPC's 2019 Annual Report, BPC signed a Defects Remediation Agreement with CNEEC to remedy the plant's defects, which was expected to result in the remediation of all plant defects in a phased manner between 2019 and January 2023.

Efforts were also undertaken to expand the plant’s power generation capacity to 900MW after a tender for construction of two additional units (Unit 5 and 6) was awarded to a joint venture between Japanese Marubeni and South Korea’s Posco Energy.

📚 Sources & References
  • Cooperation between ICBC and Standard Bank of South Africa Enters Its Prime
  • Financial Solutions: Partial Credit Guarantee
  • Implementation Completion Report (ICR) Review
  • BW: Morupule Generation and Transmission
  • Morupule B: Emergency powers
  • ICBC cooperates with Standard Bank on 65 projects
  • Transactional products and services and services
  • Power plant deal lights the way for project finance
  • Standard Bank Group Investor Conference
  • Beijing
  • May 2010: Africa
  • Power Indaba 2009
  • Financing Power in Sub-Saharan Africa
  • BOTSWANA POWER CORPORATION ANNUAL REPORT 2021: Moving Towards a Sustainable Future
  • BOTSWANA POWER CORPORATION ANNUAL REPORT 2010
  • Standard Bank Group
  • UBS Global Financial Services Conference
  • Counsellor Lan Yuqiang visits Morupule B Power Station Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Botswana Power Corporation

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant