CDB provides loan for Malabo Turbogas Plant Expansion Project On January 22, 2019, the Hubei Branch of China Development Bank (CDB) and the Government of Equatorial Guinea signed an EUR 200 million sovereign credit cooperation agreement (captured via Record ID#62258).
CDB subsequently approved a loan for the Malabo Turbogas Plant Expansion Project. The face value of the loan is unknown. However, it is known that CDB made a $6,439,074.35 loan disbursement on June 24, 2022. The purpose of the project was to conduct maintenance and expansion work at the 42MW Turbogas Power Plant in Malabo.
CMEC was the contractor responsible for implementation.
The implementation of the project commenced on July 1, 2021 and the 42MW power plant was connected to the grid on November 26, 2022.