Completed Development AidData Chinese Aid

China Eximbank provides RMB 337 million government concessional loan for 15MW Mekin Hydropower Project

¥337M RMB

Funder Export-Import Bank of China (China Eximbank)
Recipient Organization Cameroon Ministry of Economy, Planning, and Regional Development (MINEPAT)
Country Cameroon
Start Date Jan 07, 2010
End Date Oct 08, 2027
Duration 6,483 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 974
Grant Description

China Eximbank provides RMB 337 million government concessional loan for 15MW Mekin Hydropower Project On November 5, 2009, the Chinese Government and the Government of Cameroon signed a preferential loan framework agreement for the 15MW Mekin Hydropower Project.

Then, on January 7, 2010, China Eximbank and the Ministry of Economy, Planning and Regional Development of the Republic of Cameroon signed a government concessional loan (GCL) loan agreement [CHINA EXIMBANK GCL NO. (2009) 45 TOTAL NO. (295) LOAN SERIAL NO. 1290003052009110688] worth RMB 337 million for the 15MW Mekin Hydropower Project.

📋 Loan / Grant Terms
📅 Maturity20 years
⏳ Grace Period4 years
💹 Interest Rate2%

The borrower was expected to use the proceeds of the loan to finance a commercial (EPC) contract [ID# 000478/MINEE/CAB] between the Government of Cameroon's Ministry of Energy and Water Resources and China National Electric Equipment Corporation (CNEEC), which was signed on March 16, 2009.

As of December 31, 2020, the loan (GCL) had achieved a 98.4% disbursement rate and its outstanding amount was equivalent to CFA 16.1 billion.

The project involved the construction of a rockfill dam, a 105-million cubic meters reservoir, a 15 MW power plant (with three, 5MW power generators), a 6.3/110KV interconnection substation in Mekin, a 110/30KV interconnection substation at Ndjom Yekombo, and a 110/30kV high-voltage transmission line from Mekin to Ndjom Yekombo (connected to the southern power grid).

The dam and power plant are located in arrondissement of Meyomessala and electricity is evacuated to the eight districts of the Dja and Lobo Division, South Region. China National Electric Equipment Corporation was the EPC contractor responsible for project implementation.

The Cameroonian Government also established a state-owned company -- called Hydro Mekin (or Hydromekin) -- to oversee implementation of the project. Project implementation commenced November 2011 and it was completed on December 23, 2015. However, after the facility was powered up in June 2019, it experienced technical difficulties.

According to the HydroMekin website, the plant has been distributing electricity to Sanmelima and Meyomessala since May 14, 2021.

However, various Cameroon media reports claim that the power plant experienced technical difficulties continued until 2022.

The 2022 Minister's Statement from the Ministry of Water and Energy does mention that the plant faced technical issues, but doesn't clarify for how long or to what extent the plant remained functioning during that time.

The Minister's Statement does claim that from June 13, 2022 to July 20, 2022, performance tests of the plant were successfully completed establishing a transited capacity of approximately 12MW on 17 July 2022.

The energy produced is now injected into the Southern Interconnected Grid-- benefiting three cities, namely Mbalmayo, Sanmelima, and Meyomessala.

There are some indications that the China Eximbank loan for the 15MW Mekin Hydropower Project may have financially underperformed vis-a-vis the original expectations of the lender. In January 2019, Cameroon unilaterally withheld debt service payments to China Eximbank. The lender responded by withholding new loan disbursements.

Then, in July 2019, China Eximbank and the Government of Cameroon signed a debt rescheduling agreement (as captured via Record ID#88213).

Under the terms of the agreement, China Eximbank agreed to reschedule 18 loans previously contracted by the Government of Cameroon — with scheduled principal repayments between July 2019 and March 2022 — by allowing the borrower to defer scheduled principal repayments between July 2019 and March 2022 to later dates but without any maturity extensions.

The total amount of restructured debt was equivalent CFA 148 billion ($253 million) — or 70% of the loan principal that was scheduled for repayment between July 2019 and March 2022.

Under the terms of the agreement, the Government of Cameroon agreed to repay 30% of the loan principal according to the original July 2019-March 2022 schedule (i.e. without any payment deferrals).

The lender and the borrower also agreed to cancel the committed but undisbursed loan balances worth approximately CFA 10 billion (for certain loans with disbursement deadlines that had already passed).

Then, in January 2020, the International Monetary Fund (IMF) classified the Government Cameroon as facing a high risk of debt distress.

Eighteen months later, during an address before Cameroon’s National Assembly on June 28, 2021, the Minister of Water and Energy (MINEE) Gaston Eloundou Esommba provided an update on the ICBC-financed Bini à Warak Hydroelectric Power Plant Project.

He noted that the project had been 'on hold' since November 2019 because ICBC suspended the loan agreement, even though the Government of Cameroon had already mobilized XAF 22 billion of counterpart funding.

He also explained that 'the reason for this suspension is that Cameroon did not settle some of its debts towards China on time, so, it is in a cross-default situation.’

📋 Staff Comments
  1. The Chinese project title is 默坎水电站项目现. The French project title is Projet de Construction de la centrale hydroéléctrique de Mekim sur le Dja or Centrale hydroélectrique de Mékin.
  2. The China Eximbank loan agreement can be accessed in its entirety via SourceID#67429 or https://www.documentcloud.org/documents/20485533-cmr_2010_168.
  3. The project ID number for this transaction in Cameroon's Development Assistance Database (DAD) is CAM/000708.
  4. The 110/30kV high-voltage transmission line was originally designed as a 63kV high-voltage transmission line.
  5. One official source (https://www.dropbox.com/s/a400557jut579m5/Government%20of%20Cameroon%202020%20Register%20of%20Chinese%20Loans%20and%20Borrowing%20Terms.pdf?dl=0) identifies the face value of the loan as RMB 301,169,855 and the loan commitment date as March 21, 2010.
📚 Sources & References
  • 2015 Bond Prospectus Republic of Cameroon
  • BU_PITCH_ENGLISH_2018.xlsx
  • Cameroon's Development Assistance Database
  • Cameroon- 2011
  • CAMEROON: The Mekin hydroelectric power station partially restarts operation
  • China and Cameroon
  • CHINA EXIMBANK GCL NO. (2009) 45 TOTAL NO. (296) LOAN SERIAL NO. 1290003052009110688
  • China gives Cameroon 49m-dollar loan to build Mekin power station
  • China offers 145 boreholes to Cameroonian communities
  • China–Cameroon relations: Fortunes and limits of an old political complicity
  • Closure Successfully Completed for Mekin Hydropower Station Project in Cameroon
  • CONSTRUCTION OF MEKIN HYDROPOWER PROJECT OVER THE DJA
  • EPC Contract for Mekin Hydropower Station in Cameroon Signed
  • First Generating Unit of CNEEC's Hydroelectric Power Station in Cameroon Put into Operation
  • Government of Cameroon 2020 Register of Chinese Loans and Borrowing Terms, http://blueskieschina.com/mambo/content/view/282/89/, http://camerexpress.org/wp/?p=411, http://www.cneec.com.cn/NewsCenter/NewsCenter/CNEECNews/200904/522.html, http://www.fmprc.gov.cn/eng/wjb/zzjg/fzs/gjlb/2949/t16478.htm
  • Indemnisations, ponts, routes : Des tâches supplémentaires à financer à Mekin
  • Le barrage de Mékin, au Sud du Cameroun, est désormais prêt à produire de l’électricité
  • Mekin
  • Mekin Hydropower Project Government Concessional Loan Agreement
  • Minister's Statmenet
  • Page 367 - Atouts Economiques Cameroun
  • Presidentation de la Societe Hydro-Mekin
  • Production from the Mekin hydroelectric power plant on part of the ENEO distribution network
  • Project approx 01
  • Rapport DAD-Cameroon sur l’Aide au Développement 2012-2013
  • State visit of the President of the Republic of Cameroon H. E. Paul BIYA to China
  • The minister of Water and Energy before the committee on Finance and the Budget of the national assembly
  • 中企承建的莫肯水电站关闭两年后恢复发电
  • 中国电工设备总公司与喀麦隆能源与水资源部签订莫坎水电站合作议定书
  • 务实 高效 互利 双赢
  • 喀麦隆劳动部长先后考察曼维莱水电站项目和默坎水电站项目
  • 喀麦隆电力与我国签署默坎水电站项目优惠贷款协议
  • 喀麦隆默坎水电站建设项目已完工70%
  • 喀麦隆默坎水电站项目完工40%
  • 喀麦隆默坎水电站项目进展顺利
  • 喀麦隆默坎水电站顺利实现试发电
  • 我融资建设的莫肯水电站部分投入使用
  • 驻喀麦隆大使黄长庆与喀方签署默坎水电站项目优惠贷款协议
  • 高永勤参赞出席喀麦隆默坎水电站项目首台机组发电仪式 Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Cameroon Ministry of Economy, Planning, and Regional Development (MINEPAT)

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant