| Funder | Export-Import Bank of China (China Eximbank) |
|---|---|
| Recipient Organization | China Railway Engineering Corporation (CRECG) |
| Country | Iran |
| Start Date | Jun 01, 2019 |
| End Date | Jul 23, 2032 |
| Duration | 4,801 days |
| Number of Grantees | 1 |
| Roles | Recipient |
| Data Source | AidData Chinese Aid |
| Grant ID | 95736 |
China Eximbank provides RMB 13.6 billion loan — via EPCF arrangement — for 245 km Qom-Isfahan Section of the 410 km Tehran-Qom-Isfahan High-Speed Rail Project In October 2010, the Chinese Government and the Government of Iran signed an initial agreement on the 410 km Tehran-Qom-Isfahan High-Speed Rail Project.
However, due to the Iranian Government’s nuclear activities, the development of the project stalled.
Then, on July 14, 2015, the Joint Comprehensive Plan of Action (JCPOA) — commonly known as the Iran nuclear deal — was signed.
Two years later, in July 2017, China Eximbank agreed — at least in principle — to issue a loan to China Railway Engineering Corporation (CREC) through an Engineering, Procurement, Construction and Financing (EPCF) arrangement for the 245 km Qom-Isfahan Section of the 410 km Tehran-Qom-Isfahan High-Speed Rail Project.
In June 2019, Noorollah Beyranvand, the Deputy Head of the Islamic Republic of Iran Railways (RAI), announced that China Eximbank had authorized the use of an RMB 13.6 billion ($1.94 million) loan for the 245 km Qom-Isfahan Section of the 410 km Tehran-Qom-Isfahan High-Speed Rail Project. The loan’s final maturity date was identified as August 2029 (implied maturity length: 10-years).
However, it is known that the borrower expects to make principal and interest repayments worth RMB 22.881 billion ($3.2 billion) — in nominal terms — over the lifetime of the loan.
It is also known that the borrower is expected to use the proceeds of the loan to partially finance an RMB 15.3 billion ($2.3 billion) commercial contract with China Railway Engineering Corporation (CREC), which was signed in February 2015. As of July 2022, the loan had achieved an estimated disbursement rate of 29.4% (RMB 4 billion out of RMB 13.6 billion).
The purpose of the project is construct a 245 km section of the 410 km Tehran-Qom-Isfahan High-Speed Railway that runs from Qom to Esfahan (Isfahan).
Upon completion, the railway is expected to travel 250-350 km per hour and reduce the travel time from Tehran to Isfahan to 2 hours and transport 16 million passengers per year. ICREC is the general EPC contractor responsible for project implementation.
Other companies that are involved in the project include Khatam Al-Anbia Construction, which is owned by Iran’s Revolutionary Guard, Siemens, and Italferr (the consulting arm the Italian national rail operator Ferrovie dello Stato).
Construction began on or around April 15, 2015. 17 months later, on September 15, 2016, China’s Ambassador to Iran conducted an on-site project inspection.
Then, after Iran’s Minister of Roads and Urban Development Abbas Akhoundi ordered the redesign of the railway route to make it more efficient compared to the previous design (including the relocation of the train stations in Tehran, Qom and Isfahan), a project (re)design contract was signed on November 27, 2016.
The project’s originally expected completion rate was August 2021. However, as of May 2021, the project had only achieved a 5% completion rate.
China Railway Engineering Corporation (CRECG)