Chinese Government provides RMB 4.4 billion loan -- via EPCF arrangement -- for Section 1 of 446 km Shiraz-Bushehr Railway Construction Project

¥4.44M RMB

Funder Unspecified Chinese Government Institution
Recipient Organization China Machinery Industry Construction Group Inc. (SINOCONST)
Country Iran
Start Date Mar 07, 2018
End Date Oct 20, 2028
Duration 3,880 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 95735
Grant Description

Chinese Government provides RMB 4.4 billion loan -- via EPCF arrangement -- for Section 1 of 446 km Shiraz-Bushehr Railway Construction Project In January 2016, Iran’s Deputy Minister of Road and Urban Development and Managing Director of the Construction and Development of Transportation Infrastructures Company (CDTIC), Ali Nourzad, announced that an MOU had been signed with a Chinese company for the financing of the 446 km Shiraz-Bushehr Railway Construction Project.

Then, on March 7, 2018, CDTIC and China Machinery Industry Construction Group Inc. (SINOCONST) signed an Engineering, Procurement, Construction and Financing (EPCF) agreement for Section 1 of the 446 km Shiraz-Bushehr Railway Construction Project.

An unspecified Chinese state-owned bank issued a loan worth RMB 4,440,000,000 to SINOCONST to facilitate the implementation of the project. The loan’s final maturity date is in 2028 (implied maturity length: 10-years).

📋 Loan / Grant Terms
💰 Loan Amountare unknown

However, it is known that the borrower expects to make payments for principal, interest, fees, and insurance worth RMB 5,914,000,000 (RMB 4,440,000,000 in principal RMB 1,474,000,000 in interest, fees, and insurance) — in nominal terms — over the lifetime of the loan.

It is also known that the borrower expects to use the loan proceeds to partially finance the RMB 5 billion ($790 million) EPCF contract that was signed on March 7, 2018. The purpose of the project is to construct a 250 km section of a 446 km railway that runs from Shiraz to Bushehr. The 250 km section includes 13 km of tunnels and 2,600 bridges.

The project’s earthworks include 17 million cubic meters of excavation and 13 million cubic meters of embankment. SINOCONST is the EPC contractor responsible for project implementation.

However, Jahanpars Engineering and Construction Company — an Iranian subcontractor — is also involved in the implementation of the project. The project had achieved a 5% completion rate as of March 2018 and a 12% completion rate as of January 2022.

📋 Staff Comments
  1. Under most EPCF (EPC+F) contractual arrangements, a loan is extended to the EPC contractor but with a sovereign guarantee from the host government. Therefore, AidData assumes that the loan issued to SINOCONST is backed by a repayment guarantee from the Government of Iran (i.e. a sovereign guarantee).
  2. Jahanpars Engineering and Construction Company, which is also known as Jahanpars Group, is a private general contractor specialized in the engineering, procurement, construction and manufacturing of oil, gas and petrochemical industries as well as infrastructure, industrial and building projects.
  3. The Persian project title is «احداث راه آهن شيراز – بوشهر».
📚 Sources & References
  • اجازه استفاده از تسهيلات مالي خارجي براي طرح «احداث راه آهن شيراز – بوشهر» مصوب 1391,05,01با اصلاحات و الحاقات بعدي, سامانه ملی قوانین و مقررات, اعتبار ساخت راه آهن شیراز-بوشهر-عسلویه رسید_ ۴۰۰ میلیون دلار-یورو - خبرگزاری مهر _ اخبار ایران و جهان, پیشرفت 44_درصدی زیرسازی راه_آهن شیراز- بوشهر
  • Chinese companies may finance Iran's Shiraz-Bushehr railway project, امضای قرارداد سرمایه_ گذاری ۷۰۰ میلیون دلاری چین در راه_آهن بوشهر - ایسنا, ساخت راه_آهن شیراز – بوشهر با فاینانس چینی - روزنامه جهان اقتصاد, امضاي قرارداد ساخت راه آهن بوشهر - شیراز با یک شرکت چینی _ خبرگزاری صدا و سیما
  • MoU on financing Shiraz-Assaluyeh railway finalized with Chinese firm
  • Agreement on Shiraz-Bushehr railway construction signed with Chinese Co., $2.3b Chinese Deal Finalized for Iranian Rail Project, تکمیل خط ریلی بوشهر نیازمند ۴۰ هزار میلیارد تومان اعتبار _ خبرگزاری صدا و سیما, معاون وزیر راه و شهرسازی خبر داد_ تأمین ۸۵ درصد هزینه ساخت راه_آهن شیراز-بوشهر از سوی طرف چینی, شرکت ساخت و توسعه زیربناهای حمل و نقل کشور _ سرمايه گذاری _ پروژه_های سرمایه_گذاری _ پروژه های بخش راه آهن
  • China Steps Up Rail Cooperation With Iran
  • Twitter Post from Esfandyar Batmanghelidj Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

China Machinery Industry Construction Group Inc. (SINOCONST)

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant