Completed Development AidData Chinese Aid

ICBC participates in EUR 69.5 million syndicated loan for 46MW Možura Wind Park Project (Linked to Record ID#67392)

$34.75M USD

Funder Industrial and Commercial Bank of China (ICBC)
Recipient Organization Možura Wind Park d.o.o.
Country Montenegro
Start Date Jan 01, 2018
End Date Apr 24, 2027
Duration 3,400 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 95399
Grant Description

ICBC contributions to EUR 69.5 million syndicated loan for 46MW Možura Wind Park Project In 2018, Možura Wind Park d.o.o. (黑山莫祖拉风电有限公司)— a special purpose vehicle (SPV) and joint venture of Malta Montenegro Wind Power JV Limited (90% equity stake) and Enemalta (10% equity stake) — signed an EUR 69,500,000 syndicated loan agreement with a group of banks for the 46MW Možura Wind Park Project.

Known participants in the loan syndicate included Deutsche Bank and the Industrial and Commercial Bank of China (ICBC).

The borrower was expected to use the proceeds of the loan to partially finance an EUR 90,000,000 commercial contract with Shanghai Electric Power Engineering Montenegro LLC.

The purpose of the project was to install 23 Chinese-made, 2 MW low-speed intelligent wind turbine generators — with a total installed capacity of 46,000 kW — in Možura within southern Montenegro. The project also involved the construction of a substation.

The wind power plant was designed with a capacity of 46MW on 502,858 square meters of land at a cost of EUR 0.37 per square meter. Shanghai Electric Power Engineering Montenegro LLC was the EPC contractor responsible for project implementation. Construction formally commenced on December 7, 2017. Then on December 22, 2018, the first set of wind turbine generators was connected to the grid.

By February 8, 2019, all of the wind turbine generators were connected to the grid. The wind farm began its trial operation period in April 2019, which extended until the end of September 2019.

Following technical acceptance on November 15, 2019, the project secured a usage license from the Montenegrin Government. The wind farm went into commercial operation on November 18, 2019.

Investors have leased state land to the project company (SPV) for a period of 20-years and will pay it an EUR 186,057 fee annually.

The state has pledged to guarantee a fixed electricity price of EUR 95.99/MWh and EUR 115 million in incentives over the first 12-years of the wind farm’s operation. After the lease period expires, the Možura wind farm will become the property of the Montenegrin state. Notwithstanding its successful completion, the Možura Wind Park Project has been plagued by controversy and scandal.

In the months before her murder in 2017, Maltese journalist Daphne Caruana Galizia was investigating an offshore company called 17 Black Limited. She didn’t know who owned the firm, which was registered in the United Arab Emirates. But she was certain it was set up to channel corrupt payments to Maltese political leaders.

Caruana Galizia was killed in a car bombing in October 2017.

Then, in 2019, police charged one of Malta’s wealthiest businessmen, Yorgen Fenech — previously revealed by Reuters to be the owner of Limited — with ordering the murder of Caruana Galizia. He denied the charge.

The assassination triggered a political crisis in Malta that drove Prime Minister Joseph Muscat from office in 2020. 17 Black Limited’s activities remain shrouded in mystery. But evidence uncovered by Reuters and the Times of Malta shed light on its operations through one particular deal.

In December 2015, 17 Black Limited made a previously undisclosed profit of EUR 4.6 million ($5 million) when Enemalta plc — a joint venture of the Government of Malta (67% ownership stake) and Shanghai Electric Power (33% ownership stake) — purchased an equity stake in the 46MW Možura Wind Park Project via Možura Wind Park d.o.o..

The purchase came after negotiations and several trips to Montenegro led by Malta’s then energy minister, Konrad Mizzi.

In that same month, accountants for Mizzi and the prime minister’s then chief of staff, Keith Schembri, wrote in an email that Schembri and Mizzi stood to receive payments from 17 Black Limited for services that weren’t specified.

Reuters and other news outlets have previously reported these emails, which were part of an application to open bank accounts for Panamanian firms owned by the two men.

Keith Schembri confirmed to Reuters in April 2018 that companies he owns had devised a ‘draft business plan’ with 17 Black Limited that was not implemented, but he gave no further details. He is now under investigation for potential involvement in Caruana Galizia’s murder, police have said. He has denied any role in the journalist’s killing.

Konrad Mizzi has previously stated he had no involvement in or knowledge of the plot to murder Caruana Galizia.

📋 Staff Comments
  1. The Chinese Government has designated the Mozura Wind Farm Project as a BRI project.
  2. In 2010, the Government signed a 20-year lease agreement with a consortium including Fersa Energias Renovables S.A. (“Fersa”) and Celebic, for the purposes of constructing a wind farm capable of producing 46MW of renewable energy. In 2015, the lease and construction agreements were transferred to a Maltese state owned entity, Enemalta plc. In 2017, the Government approved the transfer of a 90 per cent stake in Mozura Wind Park, the company responsible for the construction of the wind farm, from Enemalta plc to Malta Montenegro Wind Power JV Limited. Under the terms of this transfer, investment obligations remain with Enemalta plc but further extend to Malta Montenegro Wind Power JV Limited.
  3. This project is also known as the 46MW Mozura Wind Farm Project. The Montenegrin project title is Vjetroelektrana Možura.
  4. The Government of Malta holds a 67% ownership stake and Shanghai Electric Power (SEP) holds a 33% ownership stake in Enemalta plc. In March 2014, SEP acquired a 33% ownership stake in Enemalta plc for EUR 320 million.
  5. The size of ICBC’s financial contribution to the loan syndication is unknown. For the time being, AidData assumes equal contributions across the two (known) members of the syndicate (EUR 34,750,000).
📚 Sources & References
  • SPIC Website: SEP Mozura Wind Power Project Realizes Power Receiving for Substation as Planned
  • BRI wind farm inaugurated in Montenegro
  • KWM advised Shanghai Electric Power to jointly develop the first new energy project in Europe with Malta Government
  • Deals of the Year 2018
  • Montenegro: Mozura wind farm to be completed in the next year and a half
  • 刘晋大使继续调研中黑合作项目
  • 上海电力2017年年度报告摘要, http://me.china-embassy.org/chn/sghd/t1717412.htm
  • Xinhua Headlines: Winds of BRI blow into green energy ambitions of Montenegro
  • Malta
  • NA POMOLU AFERA OKO PROJEKTA NA MOŽURI: Visoki funkcioneri uzeli mito u poslu sa vjetroelektranama?
  • KWM advised Shanghai ElectricPower to jointly develop the firstnew energy project in Europewith Malta Government
  • Email with King&Woods regarding Mozula Project, 2019 Government of Montenegro Bond Prospectus
  • FIAU Report
  • Deals of the Year 2018
  • GUEST POST: Questions for the Montenegro scandal investigators
  • Enemalta defends Montenegro wind farm’s price trebling
  • Copes of Agreements entered into by Enemalta plc with Clfidex Ltd, fersa Energias Renovables SA and/or Vestigo Capital
  • RJEŠENJE
  • State of Montenegro
  • Montenegro issues ten-year licence to Mozura wind farm operator
  • Paving the way for low-carbon development globally and along the Belt and Road
  • Copies of Agreements entered into by Enemalta plc with Cifidex Ltd, fersa energias Renovables SA and/or Vestigo Capital
  • IT-TLETTAX-IL LEĠIŻLATURA
  • 黑山可再生能源投资环境概览与风险防范 - 阳光“一带一路”国别系列
  • 一带一路 - 阳光时代助力中国能源企业点亮“一带一路”
  • Study and road map for green business in Montenegro
  • Nikola Babic
  • EU expects Montenegro to investigate Možura wind farm allegations
  • Wind farm ,,Možura’’
  • GREENING BRI PROJECTS IN THE WESTERN BALKAN COUNTRIES
  • Enemalta defends Montenegro wind farm’s price trebling
  • REPORT ON THE CONSOLIDATED PROFITS AND LOSSES IN THE SECOND HALF YEAR OF 2014 January – December
  • Share Purchase Agreement
  • Editorial: Release the wind farm report
  • The Belt and Road Initiative Green Development Case Studies Report 2020
  • IT-TLETTAX-IL LEĠIŻLATURA
  • Kuvaju stečaj da sakriju korupciju?
  • Directors and Management
  • Shanghai Power to acquire 33% of Maltese utility Enemalta
  • Jason Azzopardi to aid Montenegro’s Inquiry Committee in investigating the Mozura wind farm scandal
  • Exclusive: In Daphne murder investigation, money trail leads to Montenegro venture Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Možura Wind Park d.o.o.

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant