Completed Mixed AidData Chinese Aid

Bank of China contributes to $785.83 million syndicated loan for 656MW Gatún Natural Gas-Fired Power Plant Construction Project (Linked to Record ID#92639)

$65.49M USD

Funder Bank of China (BOC)
Recipient Organization Group Energy Gas Panama
Country Panama
Start Date Nov 29, 2021
End Date Dec 05, 2033
Duration 4,389 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 92638
Grant Description

Bank of China and ICBC contributions to USD 785.83 million syndicated loan for 656MW Gatún Natural Gas-Fired Power Plant Construction Project On November 29, 2021, Group Energy Gas Panama (Grupo Energético Gas Panamá) — a special purpose vehicle that is jointly owned by InterEnergy (51% equity stake), AES Corporation (24%), and the Government of Panama (25%) — signed a $785.83 million syndicated loan agreement with a group of banks for the 656MW Gatún Natural Gas-Fired Power Plant Construction Project.

The banks that participated in the syndicated loan included SMBC (coordinated lead arranger), Natixis (coordinated lead arranger), Bank of China (as captured via Record ID#92638), Industrial and Commercial Bank of China Limited (ICBC) (as captured via Record ID#92639), Intesa Sanpaolo, Banco Sabadell, the Bank of Nova Scotia (Scotiabank), Société Générale, Banco Aliado, Banco Nacional de Panamá, Caja de Ahorros and Mega ICBC Bank.

The loan carries a 7-year maturity. Its other borrowing terms are unknown.

However, it is known that the borrower is expected to use the loan proceeds for the development, design, engineering, procurement, construction, commissioning, testing, start-up, operation, and maintenance of a 656MW megawatt Gatún combined-cycle natural gas-fired power plant (CCGT) — as well as an LNG jetty with a floating storage regasification unit — on the island of Telfers within the Panamanian province of Colon.

The facility (concessionaire) will sell the majority of its output to three local distribution companies — Empresa de Distribución Eléctrica Metro-Oeste, Empresa de Distribución Eléctrica Chiriquí and Elektra Noreste — under three, dollar-denominated, 20-year power purchase agreements (PPAs).

The concessionaire also has an LNG supply contract with Total. The first loan disbursement took place on December 10, 2021. Then, on March 22, 2022, the project’s groundbreaking ceremony took place. The project is expected to reach completion in the first half of 2024. The power plant commenced operations in October 2024.

📋 Staff Comments
  1. ICBC and BOC’s contributions to the syndicated loan are unknown. For the time being, AidData assumes equal contributions ($65,485,833) across the 12 members of the lending syndicate.
  2. Morgan & Morgan (Panama City) and Shearman & Stearling advised the borrowers on this transaction. Paul Hastings – United States (New York) advised the syndicate of lenders. Icaza, González-Ruiz & Alemán (Panama City) advised SMBC and Natixis.
📚 Sources & References
  • Gatun
  • S.A. and AES Panama’s Syndicated Loan
  • Latin Lawyer Deal of the Year winners announced
  • Paul Hastings Advises on Two 2021 IJGlobal Awards
  • Gatún y AES Panamá obtienen préstamo para planta de ciclo combinado a base de GNL
  • Generadora Gatun CCGT - TL
  • MORGAN & MORGAN
  • Group Energy Gas Panama celebrates groundbreaking ceremony of the Generadora Gatún Natural Gas project
  • Global Infrastructure Partners Announces Senior Secured Term Loan to Fund Acquisition and Construction of a 670 MW Power Plant in Panama
  • Panama to build $1bn Generadora Gatún natural gas-fired power plant
  • Loan of the Year: Gatún Power Financing
  • Power Finance & Risk VOL. XXXIX
  • NO. 29
  • Power Finance & Risk VOL. XLXI
  • NO. 41
  • Power Finance & Risk VOL. XXXIII
  • NO. 23
  • Power Finance & Risk VOL. XXIV
  • NO. 50
  • Consortium closes gas-fired asset debt in Panama
  • Panama plans 670MW gas-fired power project
  • Gatún power station
  • Arranca en Panamá operación comercial de generadora eléctrica de 1.200 millones de dólares
  • InterEnergy anuncia inicio operaciones en Panamá de la planta de gas natural más grande de Centroamérica y el Caribe
  • Arranca en Panamá operación comercial de generadora eléctrica de 1.200 millones de dólares
  • Generadora Gatún inicia operación comercial en Panamá
  • Gatun CCGT Plant (656MW) _ Transaction _ IJGlobal
  • Generadora Gatun CCGT - TL Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Group Energy Gas Panama

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant