Loading…

Loading grant details…

Active Mixed AidData Chinese Aid

ICBC contributes $400 million to syndicated loan for Dhaka Elevated Expressway Construction Project (Linked to Record ID#52763)

¥400M RMB

Funder Industrial and Commercial Bank of China (ICBC)
Recipient Organization The First Dhaka Elevated Expressway Company (FDEE)
Country Bangladesh
Start Date Mar 30, 2019
End Date Dec 22, 2027
Duration 3,189 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 92382
Grant Description

ICBC contributions to $861 million syndicated loan for Dhaka Elevated Expressway Construction Project On March 30, 2019, First Dhaka Elevated Expressway Company, Ltd. (FDEE or 公司第一达卡高架快速路有限公) — a project company and joint venture of China Shandong International Economic & Technical Cooperation Group Ltd (CSI) [34% equity stake], Sinohydro Corporation Ltd. [15% equity stake], and Italian-Thai Development Public Company Limited (ITD) [51% equity stake] — signed an $861 million syndicated loan agreement with China Eximbank and the Industrial and Commercial Bank of China (ICBC) for the Dhaka Elevated Expressway Construction Project.

China Eximbank contributed $461 million to the loan syndicate (captured via Record ID#52763) and ICBC contributed $400 million to the loan syndicate (captured via Record ID#92382).

📋 Loan / Grant Terms
💰 Loan Amountreportedly carried a 4% interest rate and a 15-year maturity
📅 Maturity15 years
💹 Interest Rate4%

The project sponsors (CSI, Sinohydro Corporation Ltd., and ITD) issued loan repayment guarantees in proportion to their ownership stakes in FDEE (e.g. Sinohydro Corporation Ltd. guaranteed 15% of the $861 million loan).

The proceeds of the loan are to be used by the borrower to partially finance a commercial (EPC) contract between Bangladesh Bridge Authority (BBA) and China National Import and Export Corporation, which was signed on November 30, 2017.

The $1.263 billion project is a public-private partnership (PPP) that is being implemented on a build-operate-transfer (BOT) basis and financed according to a debt-equity ratio of 65:35. On April 2, 2020, the first loan disbursement (worth RMB 390 million) was made. By June 2023, the loan had achieved a 39.9% disbursement rate ($343.9 million out of $861 million).

By February 2024, the loan had disbursed 12 installments and achieved an overall disbursement rate of 49.6% ($427.76 million out of $861 million).

The purpose of the project is the design, construction, operation, and maintenance of a four-lane Elevated Expressway that will commence at Shahjalal International Airport and run alongside New Airport Road, with the rail alignment through the Mohakhali, Tejgaon, and Moghbazar to Kamalapur Railway-station and then the alignment crossing over Jatrabari before connecting to Dhaka Chittagong Highway.

The scope of works includes the construction of culverts, toll plazas, underpass and overpass, lay byes, wayside amenities; installation of a computerized toll collection system, providing adequate lights and development of service areas with all required facilities.

The total length of the Dhaka Elevated Expressway (also known as the Dhaka-Ashulia Elevated Expressway) is approximately 46.73 km.

The construction of the expressway has been divided into three phases – first phase is 7.45km from Kawla (airport) to Banani; second phase is 5.85km from Banani Rail Gate to Moghbazar and third phase is 6.43km from Moghbazar to Kutubkhali.

To ease traffic inside the capital, the 19.73km-long main elevated mainline of the expressway will have 31 connecting ramps with a combined length of 27km.

The project is ultimately expected to generate two sources of revenue: (a) toll revenue and (b) viability gap funding (VGF) from the Government of Bangladesh worth 27% of the total estimated project cost. China National Import and Export Corporation is the contractor responsible for implementation.

On April 1, 2018, Bangladesh Bridge Authority issued the ‘Construction Commencement Date Notification’, which was considered authorization to begin implementation.

However, construction did not begin until January 1, 2020 and the first loan disbursement was not made until April 2, 2020.

Project implementation activities were temporarily suspended in mid-2020 due to the COVID-19 pandemic, but work resumed on September 7, 2020.

The project achieved an overall completion rate 30.5% by September 2021, with the first phase at a 66.25% completion rate, the second phase at a 21.5% completion rate, and the third phase at a 2.33% completion rate.

The first segment of the expressway was inaugurated on September 2, 2022, with an 11.5 km section from South Kawla to Farmgate opened to the public on September 3, 2022. The ramp connecting it to the Karwan Bazar section was opened in March 2023.

Then, on January 17, 2024, ICBC and China Eximbank withheld a loan disbursement due to a failure to make interest payments and demanded that ITD transfer the majority of its remaining shares in FDEE to CSI and Sinohydro Corporation Ltd., prompting ITD to initiate arbitration proceedings at the Singapore International Arbitration Centre.

Between February 2024 and September 2024, project implementation was halted due to (a) FDEE's failure to secure the necessary funding to continue operations, and (b) equity share transfer disputes among FDEE's shareholders.

Then, in September 2024, the Bangladesh Bridge Authority urged FDEE to resume work immediately, warning that penalties would be imposed if project implementation deadlines were not met. The project was originally expected to reach completion in July 2023. The expected completion date was later pushed back to June 2024.

It was later pushed back to June 2025. Once completed, 80,000 vehicles are expected to use the overhead road (elevated expressway) each day.

📋 Staff Comments
  1. This project is also known as the Dhaka – Ashulia Elevated Expressway Project (DAEEP). The Chinese project title is 孟加拉达卡机场高架快速路项目 or 孟加拉达卡机场高架高速路特许权项目 or 营的孟加拉国高架快速路项目 or 孟加拉达卡至阿苏利亚高架高速公路项目. The Bangla project title is ঢাকা এলিভেটেড এক্সপ্রেসওয়ে পিপিপি প্রকল্প.
  2. Although the syndicated loan agreement was signed on April 25, 2019, financial closure was not achieved until March 30, 2020.
  3. Sinosure provided overseas investment insurance in support of this project.
  4. This loan that supported this project is not recorded the China’s Overseas Development Finance Dataset, which Boston University's Global Development Policy Center published in December 2020.
  5. The concession period is 25-years and the construction period is 42 months.
  6. In October 2021, Bangladesh’s National Board of Revenue (NBR) exempted income tax on interest on loans taken from China Eximbank ICBC for the Dhaka Elevated Expressway Construction Project.
  7. At an early stage of the project’s development, China Development Bank considered providing a $750 million loan, but the deal was never finalized.
  8. Some sources suggest that the syndicated loan agreement with China Eximbank and ICBC was signed on April 25, 2019 rather than March 30, 2019.
  9. Viability gap funding (VGF) is a financial mechanism that helps bridge the gap between the cost of infrastructure and the revenue it can generate. It is typically used to support infrastructure projects that are economically justified but not financially viable.
📚 Sources & References
  • 孟加拉国达卡机场高架快速路项目举行协议签署仪式
  • 孟加拉国达卡机场高架快速路项目举行协议签署仪式
  • Agreements on financial close signed for China-funded Bangladesh's mega road infrastructure project
  • 盘点:2020年上半年中资承包商搞定融资与贷款的10个海外项目
  • Deal Overview, 2 Chinese lenders for Dhaka Elevated Expressway granted tax exemption
  • Dhaka Elevated Expressway
  • FIRST DHAKA ELEVATED EXPRESSWAY (FDEE)
  • Dhaka Elevated Expressway: Construction picks up the pace
  • Tussle with Hanif flyover likely to delay Elevated Expressway further
  • Infrastructure Awards South Asia Deals 2021
  • 中伦助力口行及工行为孟加拉达卡机场快速路项目提供8.61亿美元融资
  • 进出口银行就孟加拉达卡机场高架快速路项目签署银团贷款协议
  • 君合获亚洲知名《财资》杂志评选“年度最佳交通运输项目”奖
  • 孟加拉达卡机场高架快速路项目实现融资关闭落地
  • Chinese firm CMC to be hired for Dhaka-Ashulia elevated expressway project
  • PM: Dhaka elevated expressway by 2020
  • Request for Expression of Interest (EOI) for Engaging 'Review Design and Supervision Consultant (International)' for the Construction of Dhaka-Ashulia Elevated Expressway on Engineering
  • Procurement and Construction (EPC) basis
  • Dhaka-Ashulia Elevated Expressway (Construction), 'One Belt
  • One Road': Mapping China's main outbound route
  • Chinese firm to build Dhaka-Ashulia Elevated Expressway
  • Dhaka-Ashulia Elevated Expressway (24KM)
  • Signing of the contract for the Dhaka-Azulia elevated highway project
  • Bangladesh government approves Dhaka-Azulia highway project
  • Dhaka Elevated Expressway Construction picks up the pace
  • Chinese firms sign contracts for Bangladesh expressway construction project
  • Dhaka-Ashulia elevated expressway to be opened in 2026: Quader
  • China chips in $1.3b credit for Dhaka-Ashulia elevated expressway
  • Dhaka-Ashulia expressway loan deal stuck for 4yrs
  • Revision sought before delayed start of work
  • Pledged Chinese Loan; Coming but at crawling pace -THE DAILY STAR
  • 进出口银行与孟加拉国财政部签署高速公路项目贷款协议
  • Expenditure on Dhaka-Ashulia Expressway is increasing by 262 crore
  • Bangladeshi government notice: Preferential Buyer's Credit Agreement has been signed with China on 10.26.2021
  • Dhaka Ashulia Elevated Expressway Feasibility Study
  • 山东高速集团投建的孟加拉国首个国际投资高速公路项目取得积极进展
  • 中泰企业合作孟加拉国交通基建项目
  • 公司签署孟加拉国达卡机场高架快速路项目
  • Financial close for the major road PPP in Bangladesh
  • Dhaka Elevated Expressway taking shape after one decade
  • 孟加拉达卡机场高架快速路项目局部复工复产并举行复工誓师动员大会
  • 孟加拉机场高架快速路项目破土动工
  • 孟加拉国达卡机场高架快速路项目开工
  • 中国电力建议股份有限公司2020年度对外担保安排的公告
  • 中国电建:拟为孟加拉国FDEE公司1.3亿美元贷款提供担保
  • 孟加拉全速兴建“一带一路”高架高速公路
  • 孟加拉达卡至阿苏利亚高架高速公路项目保险经纪服务招标
  • 中机公司孟加拉高速公路项目正式签约, ঢাকা এলিভেটেড এক্সপ্রেসওয়ে পিপিপি প্রকল্প
  • After four years, funding issue for Dhaka-Ashulia expressway goes
  • Profile Of 'Dhaka Elevated Expressway (DEE) PPP Project'
  • Refer to attached source document (Keyboard cannot render Bangla)
  • DEE execution money dries as China suspends funding, “Over 80,000 vehicles will be able to use the expressway daily once the entire expressway is opened to traffic next year.”
  • AUDITOR’S REPORT ON REVIEW OF THE INTERIM FINANCIAL INFORMATION
  • Elevated expressway: SC issues status quo on share transfer
  • Dhaka Elevated Expressway work stalled, no idea when it will resume
  • Elevated expressway work lies stalled as foreign contractors squabble over shares
  • Delays hit Bangladesh expressway PPP Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

The First Dhaka Elevated Expressway Company (FDEE)

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant