Bank of China contributes to $108 million syndicated buyer’s credit for Lai Chau 1200 MW Hydropower Plant Construction Project (Linked to Record ID#92261, #92262)

$27M USD

Funder Bank of China (BOC)
Recipient Organization Vietnam Electricity (EVN)
Country Viet Nam
Start Date Nov 28, 2013
End Date Mar 03, 2026
Duration 4,478 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 92260
Grant Description

BOC, China Eximbank and CDB contribution to $108 million syndicated buyer’s credit for Lai Chau 1200 MW Hydropower Plant Construction Project On July 10, 2013, Vietnam Electricity (EVN) — a Vietnamese state-owned power company — signed a VND 14.5 trillion ($700 million) commercial loan agreement with a syndicate of Vietnamese lenders for the 1200 MW Lai Chau Hydropower Plant Construction Project.

The members of the lending syndicate included Vietnam Bank for Industry and Trade (VietinBank), Bank for Investment and Development of Vietnam (BIDV), and Vietnam Bank for Agriculture and Rural Development (Agribank).

Then, on November 28, 2013, EVN signed a $108 million syndicated buyer’s credit (loan) agreement with Bank of China (BOC), China Eximbank, China Development Bank (CDB), and BNP Paribas for the 1200 MW Lai Chau Hydropower Plant Construction Project.

📋 Loan / Grant Terms
💰 Loan Amountcarried a 13 year maturity and an unknown interest rate
📅 Maturity13 years

The Government of Vietnam issued a sovereign guarantee in support of the loan. The loan also benefited from a Sinosure credit insurance policy.

The proceeds of the loan were to be used by the borrower to partially finance a $144.76 million commercial contract between EVN, Alstom, and Hydrochina Zhongnan Engineering Corporation, which was signed in January 2013.

BOC's contribution is captured in Record ID#92260, China Eximbank's contribution is captured in Record ID#92261, and CDB's contribution is captured in Record ID#92262.

The purpose of the project was to construct a 1200MW hydroelectric power plant — with three, 400MW power generation units (Unit 1, Unit 2, and Unit 3) — on the Da river in Nam Nhun district and Lai Chau province. Each 400MW Francis turbine was manufactured at the Alstom's plant in Tianjin, China.

Power Construction Consulting Joint Stock Company No. 1 was the contractor responsible for project design.

Song Da Corporation — a Vietnamese state-owned enterprise — was the general contractor responsible for implementation, but Vietnam Machinery Erection Corporation, Infrastructure Construction and Development Corporation, and Truong Son Construction Corporation were also involved in implementation.

Son La PMB, Fichtner (Germany), and Son La Hydropower Company were responsible for project supervision.

Alstom and Hydrochina Zhongnan Engineering Corporation were responsible for providing electromechanical equipment for the project. TBEA was responsible for providing 500kV transformer equipment. NHVS was responsible for providing 500 kV GIS equipment. Construction began on January 5, 2011. Stage 1 of the river blocking process commenced on April 24, 2012.

Stage 2 of the river blocking process commenced on October 15, 2014. The first power generation unit (turbine) began generating power for the national grid on December 14, 2015. The second power generation unit (turbine) began generating power for the national grid on June 20, 2016. The third power generation unit (turbine) began generating power for the national grid on November 9, 2016.

The power plant was formally inaugurated on December 21, 2016, one year ahead of schedule. However, the project was not completed until December 20, 2017.

The power plant was expected, upon completion, to improve the irrigation water supply for downstream areas, especially in the dry season as well as river navigation and water supply for agriculture, among other socio-economic factors in the Lai Chau province.

It is the third largest hydroelectric power station in Vietnam, generating more than 4.7 billion kWh every year to the national grid, and the third on the Da river. It is connected with the Hòa Bình Dam (completed in 1994) and the Sơn La Dam (inaugurated in 2012).

📋 Staff Comments
  1. The Chinese project title is 莱州水电站 or 莱州水电站项目. The Vietnamese project title is Nhà máy thủy điện Lai Châu.
  2. The exact size of CDB, Bank of China, China Eximbank’s contributions to the loan syndicate are unknown. For the time being, AidData assumes that all four members of the lending syndicate contributed equal amounts (i.e. $27 million). This issue warrants further investigation.
  3. This loan is not included in the China’s Overseas Development Finance Dataset that Boston University's Global Development Policy Center published in December 2020.
📚 Sources & References
  • Fourth Quarter 2013 results
  • Alstom will deliver equipment for the 1,200 MW Lai Chau hydro power plant in Vietnam
  • 莱州水电站——西北充满吸引力的旅游景点
  • 进出口银行湘分行支持越南水电项目获最佳交易奖
  • 进出口银行湘分行支持越南水电项目获最佳交易奖
  • 金融证券保险
  • 银行与金融
  • 践行“一带一路”倡议 中国银行北京市分行为“走出去”企业添助力
  • TENTH SUPPLEMENT DATED 21 FEBRUARY 2014 TO THE NOTE
  • WARRANT AND CERTIFICATE PROGRAMME BASE PROSPECTUS DATED 3 JUNE 2013
  • Contact Us
  • Lai Chau Power Plant
  • PROSPECTUS SUPPLEMENT NO. 2 DATED 14 FEBRUARY 2014 TO THE BASE PROSPECTUS DATED 18 JUNE 2013
  • 发挥“金融引擎”作用 助力首都发展再创新局——中行北京分行服务实体经济取得新成效【金融时报】
  • EVN Borrows VND14.5 Trillion for Lai Chau Hydropower Plant
  • Bảo lãnh khoản tín dụng người mua có bảo hiểm cho Thủy điện Lai Châu
  • Công văn 435/TTg-KTTH năm 2014 bảo lãnh khoản tín dụng người mua có bảo hiểm Sinosure cho dự án thủy điện Lai Châu do Thủ tướng Chính phủ ban hành
  • Số: 435/TTg-KTTH V/v bảo lãnh khoản tín dụng người mua có bảo hiểm Sinosure cho dự án thủy điện Lai Châu
  • Alstom - Innovative Infrastructure Finance by Giles Dickson at GIB Summit
  • Lai Chau Hydropower Plant
  • 邹红艳
  • 中南院首个国际融资项目 越南莱州水电站进入有水调试
  • 出口信用保险支持湖南开放型经济发展显成效
  • 进出口银行湘分行支持越南水电项目获最佳交易奖
  • Group makes loan for Vietnam’s 1,200-MW Lai Chau hydropower plant
  • Lai Châu Dam
  • VND 14,500 billion credit loan contract for Lai Chau hydropower project
  • Alstom
  • Hydrochina secure major Vietnam hydro power deal NEWS
  • Lai Chau hydropower plant's second turbine operational
  • Inauguration of Lai Chau hydropower project
  • Work on Vietnam's third largest hydropower plant begins Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Vietnam Electricity (EVN)

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant