Completed Development AidData Chinese Aid

Bank of China provides CFA 7.9 billion loan for Phase 1 of Abidjan PK24 Industrial Zone Project (Linked to Record ID#52214)

$13.2M USD

Funder Bank of China (BOC)
Recipient Organization Government of Côte d'Ivoire (Ivory Coast)
Country Cote d'Ivoire
Start Date May 22, 2019
End Date Jun 20, 2033
Duration 5,143 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 92228
Grant Description

Bank of China provides CFA 7.9 billion loan for Phase 1 of Abidjan PK24 Industrial Zone Project On October 5, 2015, Chinese and Ivorian government officials signed a framework cooperation agreement for the design, financing, and planning for Phase 1 of the Abidjan PK24 Industrial Zone Project.

Then, according to the Government of Côte d'Ivoire’s Aid Management Platform (AMP), Bank of China and the Government of Côte d'Ivoire signed two loan agreements on May 22, 2019 for Phase 1 of the Abidjan PK24 Industrial Zone Project: a CFA 48,222,898,915.45 loan agreement (captured via Record ID#52214) and a CFA 7,919,254,068.52 loan agreement (captured via Record ID#92228).

The borrowing terms of the two loans are unknown. However, it is known that the CFA 48,222,898,915.45 loan was backed by a Sinosure credit insurance policy.

The borrower was expected to use the proceeds of the CFA 48,222,898,915.45 loan to finance 85% of the cost of a commercial contract between China Harbour Engineering Co., Ltd. (CHEC) and the Government of Côte d'Ivoire, which was signed in September 2015.

It was expected to use the proceeds of the CFA 7,919,254,068.52 loan to finance 15% of the cost of the same commercial contract. The CFA 48,222,898,915.45 had achieved a 93% disbursement rate as of December 31, 2022.

Three disbursements (worth CFA 44,875,292,749.24) were made through the CFA 48,222,898,915.45 loan agreement: a CFA 11,266,380,848 disbursement on December 31, 2020, a CFA 17,664,768,298 disbursement on December 31, 2021, and a CFA 15,944,143,603.24 disbursement on December 31, 2022. The CFA 7,919,253,740.55 loan full disbursed (in a single tranche) on December 31, 2020.

The purpose of the project is to develop 127 hectares within the Akoupé-Zeudji industrial zone (park) — located in a northwestern suburb of Abidjan (Cocody Danga, Rue des Jasmins) — and provide the new area with modern and quality infrastructure (including drinking water supply, electricity, and wastewater treatment).

Construction works include roads, drainage, drinking water supply, wastewater treatment, and electricity. The industrial zone consists of 940 hectares in total and it is being built in multiple phases. CHEC was the EPC contractor responsible for the implementation of Phase 1.

The Ivorian Minister of Trade, Industry and Promotion Souleymane DIARRASSOUBA, China Communication Construction Company Deputy Managing Director Mr. Li Yi, and China Road and Bridge Corporation Vice President Mr. Wen Gang signed an implementation agreement with CHEC on December 14, 2018. Then, a formal groundbreaking ceremony took place on August 1, 2019.

However, construction did not begin until December 1, 2019. Construction was originally scheduled to last 18 months, but the COVID-19 pandemic led to implementation delays. The project had achieved a 49.36% completion rate as of 2021.

By April 2022, all site installation activities were complete, 98% of right-of-way clearance activities were complete, and 50% of earthworks were complete.

By April 2022,, the project’s electricity component had achieved a 10% completion rate; its drinking water supply component had achieved a 10% completion rate; and its wastewater treatment component had achieved a 6% completion rate. The first phase of the project was ultimately completed on December 23, 2022.

The project’s originally scheduled completion date was December 31, 2021.

It ran behind schedule because of land disputes (with approximately 500 local residents refusing to vacate the project site and accept CFA 300,000 of compensation per household) and problems related to the COVID-19 pandemic (high rates of absenteeism; team productivity reductions; Chinese employees being stranded in China due to the closure of the Ivorian borders; limited supplies of equipment and materials; fewer meetings; and less effective communication).

📋 Staff Comments
  1. This project is also known as the Akoupé-Zeudji PK24 Industrial Park Project, the PK24 Industrial Park Project, and Phase 1 of Abidjan PK24 Industrial Zone Project. The French project title is Zone industrielle d’Akoupé-Zeudji PK24. The Chinese project title is PK24工业园 or 阿比让PK24工业园区一期项目.
  2. There were previously negotiations with China Eximbank to mobilize $110 million, but according to the Chinese embassy in Cote d'Ivoire in 2019, the Bank of China ended up providing the commercial loan for Phase 1.
  3. The Akoupé-Zeudji industrial zone is the fourth industrial zone in Abidjan, after those of Koumassi in the southern districts and Yopougon in the north, and the port area of Port-Bouët.
  4. Afrieximbank is expected to fund another phase of the Abidjan PK24 Industrial Zone Project, which involved 112 hectares.
  5. Some sources suggest that the loan agreement was signed in December 2018 rather than May 2019. This issued merits further investigation.
  6. The AMP system identification number for the CFA 52,795,025,919 loan is 11200716832404. The AMP system identification number for the CFA 7,919,254,068.52 loan is 11200716832408.
  7. The CHEC point of contact for the project is Mr. Li Mr. Li ([email protected]). The project coordinator for the Ivorian government is OUATTARA YOUSSOUF OUATTARA YOUSSOUF ([email protected]).
  8. According to the World Bank's Debtor Reporting System (DRS), the weighted average grace period of all ‘private’ sector lending from all Chinese creditors to government and government-guaranteed borrowing institutions in Côte d'Ivoire was 2.5-years in 2019. AidData estimates the grace period of the Bank of China loan that supported Phase 1 of the Abidjan PK24 Industrial Zone Project by using this figure. See https://www.dropbox.com/scl/fi/i7f56vi0ix8drznpbaczg/Weighted-average-borrowing-terms-from-Chinese-Lenders-to-Ivory-Coast-April-2024-IDS-Data-Extraction.xlsx?rlkey=0uj6y8don6vdg39v28f1y4nwz&dl=0 9. According to the World Bank's Debtor Reporting System (DRS), the weighted average maturity of all ‘private’ sector lending from all Chinese creditors to government and government-guaranteed borrowing institutions in Côte d'Ivoire was 14.9999-years in 2019. AidData estimates the maturity of the Bank of China loan that supported Phase 1 of the Abidjan PK24 Industrial Zone Project by using this figure. See https://www.dropbox.com/scl/fi/i7f56vi0ix8drznpbaczg/Weighted-average-borrowing-terms-from-Chinese-Lenders-to-Ivory-Coast-April-2024-IDS-Data-Extraction.xlsx?rlkey=0uj6y8don6vdg39v28f1y4nwz&dl=0 10. According to the World Bank's Debtor Reporting System (DRS), the weighted average interest rate of all ‘private’ sector lending from all Chinese creditors to government and government-guaranteed borrowing institutions in Côte d'Ivoire was 2.7% in 2019. AidData estimates the interest rate of the Bank of China loan that supported Phase 1 of the Abidjan PK24 Industrial Zone Project by using this figure. See https://www.dropbox.com/scl/fi/i7f56vi0ix8drznpbaczg/Weighted-average-borrowing-terms-from-Chinese-Lenders-to-Ivory-Coast-April-2024-IDS-Data-Extraction.xlsx?rlkey=0uj6y8don6vdg39v28f1y4nwz&dl=0
📚 Sources & References
  • Construction project of an industrial park in AKOUPE-ZEUDJI - PK24 _Credit export
  • Projet de construction d'un parc industriel à AKOUPE-ZEUDJI - PK24 _Crédit export French
  • Construction project of an industrial park in AKOUPE - ZEUDJI - PK24 _Commercial credit 15%
  • Projet de construction d'un parc industriel à AKOUPE - ZEUDJI - PK24 _Crédit commercial 15%
  • 鲁军参赞出席阿比让PK24工业园一期项目启动仪式
  • 中企承建科特迪瓦PK24工业园一期项目竣工
  • 中企承建科特迪瓦PK24工业园一期项目竣工 Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Government of Côte d'Ivoire (Ivory Coast)

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant