Agricultural Bank of China provides $59 million loan for 55MW Penonomé I Wind Power Project

$59.1M USD

Funder Agricultural Bank of China (ABC)
Recipient Organization UEP Penonomé I, S.A
Country Panama
Start Date Jan 01, 2013
End Date Oct 03, 2032
Duration 7,215 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 92140
Grant Description

Agricultural Bank of China provides $59 million loan for 55MW Penonomé I Wind Power Project In 2013, the Agricultural Bank of China and UEP Penonomé I, S.A — a special purpose vehicle — signed a $59,096,700 loan agreement for the 55MW Penonomé I Wind Power Project. The loan’s final maturity date is 2025.

The purpose of the project was to install 22 wind turbines with 55MW of capacity. The project also involved the construction of a shared substation facility.

The wind turbines are spaced 200 meters apart from one another in a series of rows and have a tower height of 90 meters and a rotor blade diameter of 52.2 meters extending from the hub (nacelle). The project site is located in province of Coclé.

It is adjacent to the Pan-American Highway and the national electric grid, which minimized the need for opening new rights-of-way and land acquisition in the area.

Power is evacuated through two existing 230 kV transmission lines of the Central American Electrical Inter-Connection Transmission System (SIEPAC) managed by the Electric Transmission Company of Panama (ETESA). Xinjiang Goldwind Technology Co., Ltd. was the contractor responsible for implementation.

The precise implementation start date is unknown. However, it is known that the wind farm was completed and went into operation in 2013. On April 28, 2020, AES Panamá acquired 100% of the participation quotas of UEP Penonomé I.

Then, on June 19, 2020, AES Panamá and UEP Penonomé I entered into a merger agreement where AES Panamá absorbed UEP Penonomé. This merger agreement was registered in the mercantile registry of Panama City on June 23, 2020.

📋 Staff Comments
  1. The Chinese project title is 新疆金风科技股份有限公司在巴拿马承建的风力发电项目. The Spanish project title is Parque eólico Penonomé.
  2. UEP Penonomé I, S.A is also known as UEP Penonomé I, S. de R.L.
📚 Sources & References
  • 借得东风好扬帆——中企助力巴拿马参与“一带一路”建设
  • 中资银行加快海外布局
  • 中国企业在拉美风电市场:机遇与挑战并存
  • 中企在巴拿马赢得信任与尊重
  • Penonomé: Panama’s Foray into Wind Energy
  • 金风科技、中材叶片赔偿巴拿马风电企业7131.3万美元
  • Goldwind Sells Stake In Panamanian Wind Project
  • Achieving financing for the first wind farm in Panama
  • Penonome Wind
  • U.S.$1,380,000,000 4.375% Senior Secured Notes due 2030
  • Parque Eólico de Penonomé
  • Eólica y energías renovables: Parque eólico en Panamá con 22 aerogeneradores Goldwind
  • Suspenden trabajos en parque eólico, trabajadores exigen pagos
  • Mañana se inaugura en Panamá el mayor parque eólico de Centroamérica
  • Panamá llegará a tener 270MW de energía eólica
  • Parque Eólico de Penonomé generará 270 MW en 2015
  • 农银穗盈•金风科技风电收费收益权 绿色资产支持专项计划说明书 Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

UEP Penonomé I, S.A

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant