Completed Development AidData Chinese Aid

China Eximbank provides RMB 1.246 billion government concessional loan for Construction of National Road from Samlot-Veal Veng-Koh Kong (NR. 1551) Project

¥1.25M RMB

Funder Export-Import Bank of China (China Eximbank)
Recipient Organization Government of Cambodia
Country Cambodia
Start Date Nov 28, 2019
End Date Dec 02, 2026
Duration 2,561 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 91650
Grant Description

China Eximbank provides RMB 1.246 billion government concessional loan for Construction of National Road from Samlot-Veal Veng-Koh Kong (NR. 1551) Project According to the Government of Cambodia’s ODA database, China Eximbank and the Government of Cambodia signed a RMB 1,246,966,000 government concessional loan (GCL) agreement on November 28, 2019 for the Construction of National Road from Samlot-Veal Veng-Koh Kong (NR. 1551) Project.

📋 Loan / Grant Terms
📅 Maturity20 years
⏳ Grace Period7 years
💹 Interest Rate1.25%

The borrower was expected to use the proceeds of the loan to finance an EPC contract worth $188,380,000 with China Road and Bridge Corporation (CRBC).

China Eximbank made two loan disbursements in 2020 and 2021: an RMB 561,134,700 loan disbursement in 2020 and an RMB 249,393,200 loan disbursement in 2021.

The lender was originally scheduled to make additional disbursements worth RMB 249,393,200 in 2022 and RMB 187,044,900 in 2023.

The purpose of the project is to construct a 198.71 km road (known as National Road 1551 or NR. 1551) that runs from Samlot-Veal to Veng-Koh Kong.

More specifically, the road runs from Samlot in Battambang Province and enters Pursat Province at K38+000 along the old highway before running to the south and intersecting with NR.55 in Veal Veng through Ou Saom to Koh Kong Province.

The project also involves the construction of new bridges, the rehabilitation of old bridges, and the installation of sewers. China Road and Bridge Corporation (CRBC) is the EPC contractor responsible for project implementation. Project implementation officially commenced on March 9, 2020. As of March 2022, the project had achieved a 60% completion rate.

The project was ultimately completed on April 8, 2025. Its originally expected completion date was December 31, 2023.

📋 Staff Comments
  1. As of May 2022, this China Eximbank loan was not included in the China’s Overseas Development Finance Dataset maintained by Boston University's Global Development Policy Center.
  2. This project is also known as the Construction of Road No.10 Project (Samlot-Veal Veng-Koh Kong) 197.363 Km.
📚 Sources & References
  • COUNCIL FOR THE DEVELOPMENT OF CAMBODIA (CDC) Project Summary Report
  • Hun Sen launches $133M road from Pursat to Thailand’s Trat province
  • National Road No. 10 Connecting the Border Area to the Sea Area, 60% Complete, 248 million USD National Road No. 10 project was Nearly 60% completed
  • PROJECT INFORMATION SHEET
  • National Road from Samlot-Veal Veng-Koh Kong (NR. 1551) Project/Program Information and Implementation Arrangements
  • 中企海外项目双周报(2025.3.29-2025.4.11)
  • Authority wants less social impact from road project
  • Government accelerates study on National Road 10 construction
  • Koh Kong Allows Chinese Firm to Construct NR 1551
  • Requests Impact Study
  • Cambodia’s tallest bridge connected to road network ahead of KNY opening
  • Cambodian Deputy Prime Minister Sun Zanto witnessed the 1551 road access ceremony built by Sino-Chinese Group
  • Multiple CCCC projects see smooth progress Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Government of Cambodia

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant