Completed Development AidData Chinese Aid

[China-Venezuela Joint Fund] CDB provides $603.57 loan for La Cabrera (José Felix Ribas) Power Plant Construction Project (Linked to Record ID#58677)


Funder China Development Bank (CDB)
Recipient Organization Banco de Desarrollo Económico y Social de Venezuela (BANDES)|China-Venezuela Joint Fund
Country Venezuela
Start Date Mar 01, 2010
End Date Sep 16, 2028
Duration 6,774 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 91324
Grant Description

[China-Venezuela Joint Fund] CDB provides $603.57 loan for La Cabrera (José Felix Ribas) Power Plant Construction Project In March 2010, Sinohydro and PDVSA signed a commercial contract for the development of La Cabrera thermoelectric power plant in Maracay, Aragua state.

The total project cost was $603.57 million, funded by the China-Venezuela Joint Fund l (see Record ID#58677 for information about the fund).

The project was also funded by the Fondo Nacional para el Desarrollo Endógeno (FONDEN), Fondo Independencia 200, and the Fondo Cambio, which are all Venezuelan state-owned development funds. It is unclear how much each fund contributed to the total project cost. The contractor was Sinohydro. The first turbine was put into operation on December 25, 2012.

The project was completed on April 3, 2014, and it began generating 320 MW. The project is composed of two 160 MW turbines. A plant was originally constructed on the same site in 1974, but this project represented a significant upgrade.

In a 2019 Andorran lawsuit, it was alleged that the cousin of the former president of the PDVSA took bribes from Sinohydro for this project and TermoCarabobo I (see Record ID#91257).

A special commission of the National Assembly found a discrepancy of USD 359 million between the contract cost and estimated costs for installing the two turbines. Sinohydro did not appear before the commission to address these concerns. As of 2021, the plant has been described as suffering 'constant failures'.

The Government of Venezuela reportedly defaulted on its repayment obligations under the loan agreement for the La Cabrera (José Felix Ribas) Power Plant Construction Project. However, Sinosure made an indemnity payment worth $14.99 million in December 2015.

📋 Staff Comments

1. No transaction amount is recorded for this project because it is already recorded through the China-Venezuela Joint Fund (as captured via Project ID#58677).

📚 Sources & References
  • Data 1
  • Para garantizar el suministro de energía
  • Termoeléctrica La Cabrera entrará en funcionamiento el 25 de diciembre
  • Expensive Scams
  • Se construye en Aragua
  • Termoeléctrica La Cabrera incorpora 380 MV al Sistema Interconectado Nacional
  • Los oscuros negocios del chavismo con China
  • Venezuela, revolving door for Chinese interests in Latin America (part II)
  • Chinese investment in Venezuela’s grid fails to prevent blackouts
  • Forma parte del convenio con China
  • Planta Termoeléctrica La Cabrera genera 320 MW para Aragua y Carabobo
  • Planta Termoeléctrica La Cabrera incorpora 320 megavatios al Sistema Eléctrico Nacional
  • Jose Felix Ribas (La Cabrera) Power Plant
  • Venezuela
  • La Cabrera power station
  • INAUGURADA PLANTA TERMOELÉCTRICA LA CABRERA EN EL ESTADO ARAGUA
  • COMISIÓN MIXTA PARA EL ESTUDIO DE LA CRISIS ELÉCTRICA EN EL PAÍS INFORME FINAL
  • Negocios chinos Agosto 2020 Acuerdos que socavaron la democracia en Venezuela
  • EMPRESAS MIXTAS
  • 岁寒知松柏 患难见真情 —中国电建委内瑞拉电站项目案件纪实
  • How a Chinese venture in Venezuela made millions while locals grew hungry
  • 中国电建EPC总承包委内瑞拉新卡夫雷拉电站全部并网发电 Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Banco de Desarrollo Económico y Social de Venezuela (BANDES)|China-Venezuela Joint Fund

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant