MOFCOM provides RMB 40.6 million grant for Davao River Bridge (Bucana Bridge) Construction Project

¥40.63M RMB

Funder China Ministry of Commerce
Recipient Organization Department of Public Works and Highways, Republic of the Philippines (DPWH)
Country Philippines
Start Date Dec 09, 2020
End Date May 06, 2029
Duration 3,070 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 90660
Grant Description

On December 9, 2020, the Chinese Government and the Government of the Republic of the Philippines through the Department of Public Works and Highways (DPWH) signed an exchange of letters and an implementation agreement for the Davao River Bridge (Bucana Bridge) Project.

The grant proceeds were to be used to finance an RMB 40,633,038.76 commercial contract (for project design and construction supervision) signed by DPWH and a consortium consisting of CCCC Highway Consultants Co., Ltd. and Beijing Zhongjiao Road & Bridge Supervision Co., Ltd, which was signed on July 6, 2022.

The purpose of the project is to construct the Davao River Bridge.

Also known as the Bucana Bridge, the Davao River Bridge will have dual two-lane roads with a total length of 1,340 meters located at the estuary of Davao River in Davao City.

Upon completion, the project is expected to improve traffic congestion in the east-west coastal areas of the city by diverting around 35,000 vehicles per day. An estimate of 300 to 500 Dabawenyos is also expected to benefit as employees of the construction project.

The project was designed to follow a localized method of implementation, with the Philippine side in charge of technical works and project management during the entire process.

A 'notice to proceed' was issued by DPWH to CCCC Highway Consultants Co., Ltd. and Beijing Zhongjiao Road & Bridge Supervision Co., Ltd on July 1, 2022. The originally expected duration of the project was 30 months.

The surveys and design phase of the project was scheduled to be completed in six months, while the construction supervision was targeted to last for 24 months or two years. As of April 14, 2025, the bridge is still under construction. The new estimated completion date is November 2025.

📋 Staff Comments

1. The notice to proceed can be accessed via https://www.dropbox.com/s/cxpxb8m5uxwj4js/notice%20to%20proceed%20bucana.pdf?dl=02. The July 2022 commercial contract can be accessed via https://www.dropbox.com/s/uhhf0mewyds77h5/Contract%20Agreement%20BUCANA%20%28english%20version%29.pdf?dl=0

📚 Sources & References
  • China grants 60 million US dollars for the Philippines' Davao River Bridg
  • 中国将援助菲律宾建设达沃河桥
  • PH
  • China sign commercial contract for Davao River Bridge
  • Davao River Bridge moves into design phase
  • Survey, construction of Davao River Bridge project to start soon
  • 中国将援助菲律宾建设达沃河桥
  • 中国将援助菲律宾建设达沃河桥
  • 公规院中标援菲律宾达沃河桥勘察设计及项目管理
  • CONTRACT FOR THE CONSULTING SERVICES FOR THE CONDUCT OF DETAILED ENGINEERING DESIGN AND CONSTRUCTION SUPERVISION CHINA AID LOCALIZED PROJECT FOR DAVAO RIVER BRIDGE (BUCANA BRIDGE)
  • Consulting Services for the Conduct of Detailed Engineering Design and Construction Supervision of China Aid Localized Project for Davao River Bridge (Bucana Bridge)
  • CONSOLIDATED AUDIT REPORT ON OFFICIAL DEVELOPMENT ASSISTANCEFUNDED PROGRAMS AND PROJECTS
  • Bucana Bridge Project Enters Peak Construction Phase
  • Set to Finish Ahead of Schedule Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Department of Public Works and Highways, Republic of the Philippines (DPWH)

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant