Chinese Government provides Vt 2.5361 billion grant for Pentecost Road Project (Linked to Record ID#90059)

$2.54M USD

Funder China Ministry of Commerce
Recipient Organization Government of Vanuatu
Country Vanuatu
Start Date Jan 22, 2021
End Date Nov 11, 2032
Duration 4,311 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 90060
Grant Description

On September 3, 2020, China Civil Engineering Construction Corporation signed a VT 6,931.1 billion commercial contract with the Government of Vanuatu to build the Pentecost Road.

The contract was signed by Vanuatu’s Minister of Finance and Economic Management Johnny Koanapo, and CCECC South Pacific Ltd Director Liang Qing.

At the contract signing ceremony, it was announced that 36.6% of the commercial contract cost (Vt2,536.1 billion) would be financed with a Chinese Government grant and 63.4% of the commercial contract cost (Vt4,395,000,000) would be financed with a loan from China Eximbank.

Then, on January 22, 2021, the Chinese Government and the Government of Vanuatu signed a financial framework agreement for the Pentecost Road Project. The project involves the rehabiliation of a 55 km tar sealed road on Pentecost Island. It will be implemented in three stages. Stage 1 will begin in the Beyomo area and run to the Melsisi area.

Stage 2 will run from the Melsisi area to Bwatnapni. Stage 3 will run from Bwatnapni to North Pentecost.

The ultimate goal is to increase agricultural production, as the highway will help producers sell their produce with more ease. The road will be upgraded from a muddy road to a 2-lane road. China Civil Engineering Construction Corporation (CCECC) is the contractor responsible for implementation.

In November 2020, the Government of Vanuatu, through the Council of Ministers (COM), approved CCECC to bring 28 engineers and special equipment operators from China to Vanuatu.

CCECC provided assurances that all of its workers had complied with the necessary health and safety requirements put in place by the Government of Vanuatu after leaving Shanghai and transiting in Auckland before arrival in Port Vila.

The technical workers were intended to 'deliver major infrastructure projects and complete ongoing ones,' including the Pentecost Road Project. On January 22, 2021, a foundation-laying ceremony for the Pentecost Road Project was held. Then, on June 6, 2022, a groundbreaking ceremony was held. The project was originally expected to reach completion within 3-years.

📋 Staff Comments

1. The MOFCOM grant was likely denominated in RMB. This issue requires further investigation.

📚 Sources & References
  • PM Launches Pentecost road project
  • Groundbreaking ceremony for VT6.9 billion Pentecost Road next Friday
  • Vt6.9 Billion Pentecost Road Contract Agreement Signed
  • Reserve Bank of Vanuatu Quarterly Economic Review March 2020
  • 驻瓦努阿图大使周海成出席彭特考斯特岛公路项目一期工程开工典礼
  • 驻瓦努阿图大使周海成出席彭特考斯特岛公路项目奠基仪式
  • 中国土木签约瓦努阿图彭特考斯特岛公路项目
  • 中国土木承建的瓦努阿图彭特考斯特岛道路升级改造项目框架协议签署仪式顺利举行
  • Ambassador Zhou Haicheng's article on China-Vanuatu cooperation against COVID-19 entitled 'Model for being stronger together'
  • Model for being stronger together
  • Vanuatu: 2021 Article IV Consultation -Press Release; Staff Report; and Statement by the Executive Director for Vanuatu
  • Australia to import Vanuatu kava
  • VANUATU ECONOMIC ASSESSMENT ON THE PENTECOST ROAD PROJECT.
  • Pentecost Road Rehabiliation Project (Melsisi to Salap).jpeg
  • CCECC South Pacific Limited
  • 中国土木承建的瓦努阿图彭特考斯特岛道路升级改造项目框架协议签署仪式顺利举行
  • 驻瓦努阿图大使周海成出席彭特考斯特岛公路项目一期工程开工典礼
  • CCECC South Pacific Limited, 287070111_560176192237231_6763522983824501468_n.jpeg
  • 驻瓦努阿图大使周海成出席彭特考斯特岛公路项目一期工程开工典礼
  • Vanuatu: The China Civil Engineering Construction Corporation 中国土木工程集团有限公司 (CCECC) will carry out the design and construction of the Vt6,931.1 billion Road Project on Pentecost.
  • RESERVE BANK OF VANUATU FINANCIAL & ECONOMIC ANALYSIS: December 2020 Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Government of Vanuatu

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant