China Funds Feasibility Study for the Nata-Maun Road Rehabilitation Project (Linked to Record ID#57892)

$3.4M USD

Funder Unspecified Chinese Government Institution
Recipient Organization Government of Botswana
Country Botswana
Start Date Jan 01, 2018
End Date Apr 09, 2030
Duration 4,481 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 88502
Grant Description

On May 24th, 2019, China and Botswana signed an Exchange of Notes on the Feasibility Study of Nata-Maun Road Project, which is based on the consensus reached by the two state heads in the August 2018 (which is likely where the securing of funding mentioned above came from). The feasibility study was ongoing as of May 30th, 2019.

In a Facebook post released by the Botswana government, the Nata-Maun Road Rehabilitation project feasibility study is valued at P3.4 million and was provided by China as a fully funded grant.

The first meeting of the fifth session of the eleventh parliament of Botswana on November 6th, 2018 confirmed the completion of the feasibility study.

During the feasibility study, the Botswana Government assigned the Botswana Ministry of Transport and Communications to facilitate the arrival and equipment management of the visiting Chinese experts.

This project is linked to Record ID#57892, which captures that China pledged 10 billion BWP of funding for the construction of the Francistown-Nata and Nata-Maun Road (Francistown-Nata-Maun Road Rehabilitation Project or Nata-Maun Road Rehabilitation Project) on November 6th, 2018, at the first meeting of the fifth session of the eleventh parliament of Botswana was held.

However, an agreement was not signed at that point.

The Chinese government stipulated that this feasibility study was a requirement for the infrastructure project to be considered for a loan.

📚 Sources & References
  • The First Meeting of the Fifth Session of the Eleventh Parliament
  • Third Meeting of the Fifth Session of the Eleventh Parliament
  • OVER P3 MILLION FOR NATA-MAUN ROAD
  • Gov’t hunts P12bn deals in landmark China mission
  • China and Botswana Governments Exchanged Letters on the Feasibility Study of Nata-Maun Road Project
  • Chinese Ambassador Zhao Yanbo Inspected the Maun-Nata-Francistown Road Project
  • Chinese Ambassador Zhao Yanbo Inspected the Maun-Nata-Francistown Road Project 2019/06/03
  • 驻博茨瓦纳大使赵彦博考察纳塔-马翁公路项目情况
  • Building prosperity in Botswana
  • 中国与博茨瓦纳政府签署纳塔-马翁公路项目可行研究立项换文
  • 中国与博茨瓦纳签署公路修复项目可行性研究工作换文
  • Nata-Maun Road Project
  • Chinese Ambassador Zhao Yanbo Inspected the Maun-Nata-Francistown Road Project
  • China and Botswana Governments Exchanged Letters on the Feasibility Study of Nata-Maun Road Project
  • 驻博茨瓦纳大使赵彦博考察纳塔-马翁公路项目情况 Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Government of Botswana

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant