China Eximbank provides $1.26 billion loan for 1240MW Bangko Tengah (SS-8) Mine Mouth Power Plant Construction Project (Linked to Record ID#69235)

$1.26M USD

Funder Export-Import Bank of China (China Eximbank)
Recipient Organization PT Huadian Bukit Asam Power (HBAP)
Country Indonesia
Start Date May 24, 2018
End Date Jun 11, 2033
Duration 5,497 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 85608
Grant Description

China Eximbank provides $1.26 billion loan for 1240MW Bangko Tengah (SS-8) Mine Mouth Power Plant Construction Project On May 24, 2018, the Export-Import Bank of China signed a $1.26 billion loan agreement with PT Huadian Bukit Asam Power (HBAP) — an Indonesia-incorporated special purpose vehicle and joint venture between Indonesian state-owned mining company PT Bukit Asam Tbk (45% ownership stake) and Chinese state-owned enterprise China Huadian Hong Kong Company Ltd (55% ownership stake) — for the 1240MW Bangko Tengah (SS-8) Mine Mouth Power Plant Construction Project.

📋 Loan / Grant Terms
💰 Loan Amountcarries the following borrowing terms: a 15-year maturity
📅 Maturity15 years
⏳ Grace Period5 years

The $1.59 billion project is being implemented as an Independent Power Project (IPP) and financed according to a 75:25 debt-to-equity ratio. The transaction also appears to be backed by a Sinosure credit insurance and/or investment insurance policy.

This loan was secured by (i.e. collateralized against) a pledge of all its existing 45% share ownership in PT Huadian Bukit Asam Power and shares that will exist in the future by PT Bukit Asam Tbk, as approved by the Ministry of State-Owned Enterprise on May 17, 2018.

The purpose of the project is to construct a 1,240 megawatt (MW) coal-fired power station — with two 620MW generators (Unit 1 and Unit 2) — near the Tanjung Enim coal mine in South Sumatra Province (exact locational coordinates: -3.838679, 103.804133). The project site is located 2 km away from the Central Banko coal mine in Muara Enim, South Sumatra, Indonesia.

The power plant’s coal-fired power generation units will be equipped with a super-critical boiler along with a high-efficiency steam turbine and a generator. The plant will also be fitted with a flue gas desulphurisation (FGD) system to control emissions.

The Sumsel-8 power plant will consume up to 5.4 million tonnes (Mt) of coal a year, which will be sourced through a 1.5km-long enclosed conveyor belt from the Banko Tengah coal mine operated by PTBA in the Tanjung Enim area.

The project also involves the construction of a 45 km transmission line from the power plant to the PLN substation in Muara Enim. On November 7, 2015, South Sumatra Governor Alex Noerdin attended a groundbreaking ceremony at the project site.

Then, on October 19, 2017, HBAP signed a 25-year power purchase agreement (PPA) with Perusahaan Listrik Negara (PLN), which is an Indonesian government-owned corporation that has a monopoly on electricity distribution in Indonesia and generates the majority of the country's electrical power. China Huadian Hongkong Company Ltd. is the EPC contractor responsible for implementation.

Inter World Steel Mills Indonesia and Mutiara Indah Anugrah are also involved as subcontractors.

Inter World Steel Mills Indonesia has provided the steel solutions for the Sumsel-8 coal-fired power project, while the key equipment including boilers, turbines and generators were supplied by contractors based in China.

Mutiara Indah Anugrah, a construction company based in Indonesia, was contracted to perform construction and installation works for the project in 2019. Construction commenced in June 2018. By the end of 2019, the project had achieved a 22% completion rate.

In March 2020, the project's sponsor declared force majeure and stated that project would be delayed as a result of the COVID-19 pandemic.

Unit 1 was originally expected to reach its commercial operations date (COD) in December 2021, while Unit 2 was originally expected to reach its commercial operations date (COD) in March 2022. As of November 2021, the project was 92.84% complete. In 2021, PLN submitted a letter of request to delay the commercial operation date of the project.

In July 2022, PLN and HBAP agreed to adjust the PPA based on the delayed operation date. In August 2022, GBAP then signed a side agreement with PLN to delay the commercial operation date of the plant. The delays added additional construction and operational costs. The plant began commercial operations in October 2023.

📋 Staff Comments
  1. This project is also known as the South Sumatra 8 Power Plant Construction Project or Sumsel-8 Power Plant Construction Project.
  2. This project is linked to Record ID#69235, which captures the equity contribution from from China Huadian Hongkong Company Ltd.
  3. For loan and debt rescheduling records with variable interest rates, AidData calculates the all-in interest rate at T0 based on the reference rate (such as LIBOR or EURIBOR) on the loan start date, plus any known margin. Please see the methodology for additional details.
📚 Sources & References
  • Bangko Tengah (SS-8) power station
  • Indonesian Public Finance Deals
  • BU_PITCH_ENGLISH_2019-clean5.xlsx
  • Investor Kit (PTBA - IDX)
  • PLTU Sumsel 8
  • Bangko Tengah Mine Mouth Power Plant (1240MW)
  • Bangko Tengah (SS-8) Coal-Fired Power Plant (1240MW)
  • Bukit Asam secures US$1.2 bln loan to build Indonesia’s largest mine mouth power plant
  • PTBA Subsidiary's Mouth Mining Project PLTU Funded by Exim Bank of C
  • PLTU Sumsel 8 Raih Pendanaan US$ 1,26 Miliar dari CEXIM - Listrik Katadata.co.id.pdf
  • Bukit Asam (PTBA) targetkan kontruksi PLTU Mulut Tambang Sumsel 8 capai 24% tahun ini
  • PT HBAP Optimis Proyek PLTU Sumsel 8 Berjalan Sesuai Target
  • Tanjung Lalang - Google Maps
  • PTBA Signed the Amendment Power Purchase Agreement of South Sumatera Mine Mouth Power Plant-8 with PLN, 2018 PFI Financial League Tables
  • Chinese power firm
  • PTBA set up joint venture
  • Chinese power firm and PTBA set up joint venture
  • SOUTH SUMATRA MINE-MOUTH COAL-FIRED POWER PLANT
  • PTBA Accelerates Fulfillment of PLTU Sumsel 8 Financial Close Terms
  • Signing of Loan Facility Agreement PLTU Sumsel � 8
  • Bukit Asam bags US$1.26 bln in loans from Cexim Bank to fund PLTU Sumsel 8
  • 中国能建承建印尼玻雅2×66万千瓦电站项目主体工程开工
  • Sumsel-8 coal-fired power plant operation awaits PLN's readiness
  • Catat! PTBA: PLTU Sumsel 8 Beroperasi Akhir 2021
  • Bukit Asam Builds US$ 1.59 B Bangko Power Plant
  • Sumsel-8 Coal-fired Power Project
  • Sumsel-8 coal-fired power plant operation awaits PLN's readiness
  • Deals of the Year 2019
  • PT Bukit Asam Tbk Annual Report 2022
  • Bangko Tengah power station
  • The Sumsel-8 Steam Power Plant Officially in Commercial Operation
  • Puluhan Massa dari JAKOR Sumsel Tuntut Penghentian PLTU Sumsel 8 di Depan Kantor PT
  • Sumsel-8 coal-fired power plant
  • South Sumatra
  • Indonesia
  • Energi Bersih untuk Masa Depan yang Tangguh Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

PT Huadian Bukit Asam Power (HBAP)

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant