| Funder | Export-Import Bank of China (China Eximbank) |
|---|---|
| Recipient Organization | PT Conch Cement Indonesia |
| Country | Indonesia |
| Start Date | May 28, 2013 |
| End Date | Feb 02, 2030 |
| Duration | 6,094 days |
| Number of Grantees | 1 |
| Roles | Recipient |
| Data Source | AidData Chinese Aid |
| Grant ID | 85372 |
China Eximbank provides RMB 1.5 billion loan for Cement Plant Construction Project On September 20, 2011, PT Conch Cement Indonesia (or Indonesia Conch or 印尼海螺水泥有限公司) — a joint venture between Anhui Conch Cement Company Limited (75%) and Prosperity International Holdings (H.K.) Limited (25%) — held its first board of directors in Jakarta and decided to invest in a Cement Plant Construction Project.
On May 28, 2013, Anhui Conch Cement Company Limited signed a guarantee contract in which it agreed to issue a full guarantee for an RMB 1.5 billion loan from China Eximbank to Indonesia Conch for the Cement Plant Construction Project (Phases 1 and 2).
It was to be repaid on a semi annually basis starting from November 2015 to May 2023 or at the latest on June 28, 2023.
On September 10, 2013, Anhui Conch Cement Company Limited signed a guarantee contract in which it agreed to issue a full guarantee for a $25 million foreign exchange capital loan (外汇资金贷款) from the Anhui Branch of China Development Bank to Indonesia Conch for Phase 1 of the Cement Plant Construction Project.
On November 16, 2015, Anhui Conch Cement Company Limited signed a guarantee contract in which it agreed to issue a full guarantee for a $50 million loan from the Industrial and Commercial Bank of China (Europe) S.A to Indonesia Conch for working capital purposes.
The Cement Plant Construction Project was located near the South Kalimantan-East Kalimantan highway — 30 km from the city of Tanjung — within Tabalong Regency and South Kalimantan Province.
It was implemented in two phases: The first phase involved the construction a 3200t/d clinker cement production line — capable of producing 3200 tons of cement per day — and the construction of a 2×18MW coal-fired power station.
Phase 1 construction started on December 20, 2012 and the 3200t/d clinker cement production line was put into operation on November 18, 2014.
The second phase of the project involved the construction of another 3,200 tons/day clinker production line, a 1.5 million tons/year cement grinding station, an 18 MW coal-fired power station, and other production facilities. Phase 2 construction commenced on December 18, 2014 and it was completed on May 28, 2016.
China MCC17 Group Co Ltd was the contractor responsible for implementation.