[Sino-Congolese Programme] China Eximbank provides $5.33 million loan for construction of 5km ramp connecting the Kalemie stadium to Lumumba Boulevard (Linked to Record ID#450, #59220)


Funder Export-Import Bank of China (China Eximbank)
Recipient Organization Sino-Congolais des Mines (Sicomines SARL)
Country Democratic Republic of the Congo
Start Date Aug 17, 2015
End Date Dec 13, 2031
Duration 5,962 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 85311
Grant Description

[Sino-Congolese Programme] China Eximbank provides $5.33 million loan for construction of 5km ramp connecting the Kalemie stadium to Lumumba Boulevard In 2008, China Eximbank issued a $3.003 billion general buyer's credit loan to Sino–Congolais des Mines (Sicomines SARL) — a joint venture — to finance infrastructure projects in the DRC (as captured via Record ID#450).

All subsidiary borrowings under the (government-guaranteed) general buyer's credit loan agreement were to be repaid with revenues from mining projects managed by Sicomines SARL.

📋 Loan / Grant Terms
💰 Loan Amountcarried a maturity of 25 years

All infrastructure projects supported through the general buyer's credit loan were part of the so-called “Sino-Congolese Programme." One of the subsidiary loans issued as part of the 'Sino-Congolese Programme' was a $5,333,019.45 loan for the construction of a 5 km ramp connecting the Kalemie stadium to Lumumba Boulevard.

As of 2020, the loan achieved a disbursement rate of 66% ($3,535,947.76 out of $5,333,019.45).

CREC 9 — a subsidiary of China Railway Engineering Corporation (CREC) — is the contractor responsible for project implementation. It was awarded a $5,333,019.45 contract (ID#ACGT/DG/07/2019). The project official began construction on September 3, 2020. Asphalting for the ramp began January 28, 2021.

The project was completed on September 27, 2022.

📋 Staff Comments
  1. The French project name is Construction de la bretelle reliant le stade de Kalemie au boulevard Lumumba. 2 According to the 2018 ACGT Annual Report, funding was still pending the approval by the Board of Directors of Sicomines SARL in 2018 after a request was made to reallocate funds from the Kalemie airport terminal project (see Project ID#59220) to this ramp construction project.
  2. Given that AidData has captured the entire $3.003 billion China Eximbank loan commitment amount for multiple infrastructure projects via Project ID#450, it does not record a financial commitment (transaction) amount for the subsidiary loan supporting this project to avoid double-counting.
📚 Sources & References
  • Asphaltage à Kalemie de la bretelle reliant le boulevard Lumumba au boulevard Joseph KABILA: le Gouverneur Zoé KABILA donne le go.
  • Le ministre près le Gouverneur du Tanganyika a visité le projet de la bretelle reliant le boulevard Lumumba et le nouveau stade de Kalemie., 2018 Annual Report
  • The project connecting Kalemie Terminal - Kalemie New Stadium - Lumumba Avenue undertaken by China-Congo Infrastructure passed the temporary acceptance, rapport assoupliitie
  • CONVENTION DE LA SINO-CONGOLAISE DES MINES : Qui perd, qui gagne entre l’Etat congolais et la Chine ?
  • Etude d’évaluation de la mise en œuvre de la convention de collaboration relative au développement d’un projet minier et d’un projet d’infrastructures en RD Congo Projet SICOMINES
  • RDC - Contrat chinois : Un centre de recherche dénombre 40 infrastructures réalisées mais surfacturées à 824 millions $ Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Sino-Congolais des Mines (Sicomines SARL)

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant