Active Mixed AidData Chinese Aid

[Sino-Congolese Programme] China Eximbank provides $56.6 million loan for Phase 2 of 55.5 km Bukavu-Nyangezi-Kamanyola-Uvira Segment of Route Nationale 5 (RN5) Construction and Modernization Project (Linked to Record ID#450, #46231)


Funder Export-Import Bank of China (China Eximbank)
Recipient Organization Sino-Congolais des Mines (Sicomines SARL)
Country Democratic Republic of the Congo
Start Date Jan 01, 2018
End Date Apr 25, 2028
Duration 3,767 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 85310
Grant Description

[Sino-Congolese Programme] China Eximbank provides $56.6 million loan for Phase 2 of 55.5 km Bukavu-Nyangezi-Kamanyola-Uvira Segment of Route Nationale 5 (RN5) Construction and Modernization Project In 2008, China Eximbank issued a $3.003 billion general buyer's credit loan to Sino–Congolais des Mines (Sicomines SARL) — a joint venture — to finance infrastructure projects in the DRC (as captured via Record ID#450).

All subsidiary borrowings under the (government-guaranteed) general buyer's credit loan agreement were to be repaid with revenues from mining projects managed by Sicomines SARL.

📋 Loan / Grant Terms
💰 Loan Amountcarried a maturity of 25 years

All infrastructure projects supported through the general buyer's credit loan were part of the so-called “Sino-Congolese Programme." One of the subsidiary loans issued (as part of the ‘Sino-Congolese Programme” was a $56,602,312.69 million loan for Phase 2 of the 55.5 km Bukavu-Nyangezi-Kamanyola-Uvira Segment of Route Nationale 5 (RN5) Construction and Modernization Project.

The contract for the project was signed December 22, 2010.

The project involved the construction and modernization of a 55.5 km road between the town of Bukavu and the town of Uvira in North Kivu Province.

The road also connects the cities of Uvira and Kamanyola, which are border towns near Rwanda and Burundi and important areas for agricultural production.

Sinohydro 14 and CIMA International were the contractors responsible for implementation and their work was overseen by DRC's Agence Congolais des Grands Travaux. Phase 2 construction began in May 2018. Construction on the RN5 Bukavu resumed August 21, 2020 after it was stopped for more than a year.

📋 Staff Comments
  1. This project is also known as the RN5 Bukavu-Ngangezi-Kamanyola Upgrade project. The French project title is Travaux du Projet d'Asphaltage de la route Bukavu-Kamanyola or Projet de Construction et Modernisation de la RN5 : Bukavu-Nyangezi-Kamanyola-Uvira/Lot1 : Bukavu - Nyangezi - Kamanyola (55,50 Km).
  2. The project was carried out in 2 phases (Phase I: from PK 0 to PK 5; Phase II: from PK5 to PK55). 5km of the RN5 was constructed and modernized in Phase 1 (captured in via Project ID#46231), and 50km of the RN5 was constructed and modernized in Phase 2 as captured via Project ID#85310.
  3. Given that AidData has captured the entire $3.003 billion China Eximbank loan commitment amount for multiple infrastructure projects via Project ID#450, it does not record a financial commitment (transaction) amount for the subsidiary loan supporting this project to avoid double-counting.
📚 Sources & References
  • Rapport Annuel 2016
  • Plan du Travail
  • Chinese Loans to Africa Database
  • Rapport Annuel 2017
  • Rapport Annuels 2017
  • Rapport de Conciliation ITIE RDC 2015 - signé.pdf
  • Rapport Annuel 2018
  • RN5 Construction and Modernization Project: Bukavu - Nyangezi - Kamanyola - Uvira / Lot1: Bukavu - Nyangezi - Kamanyola, https://foreignpolicymag.files.wordpress.com/2018/06/01911-sicomines-workingpaper-landry-v6.pdf, drc-china infrastructure status march 2011
  • Rapport Annuel 2012
  • Asphaltage de la route Bukavu-Kamanyola
  • The impact of Sicomines on development in the Democratic Republic of Congo
  • Rapport annuel Exercice 2013
  • Rapport Annuel 2015
  • Projet de Construction et Modernisation de la RN5 : Bukavu - Nyangezi - Kamanyola - Uvira/Lot1 : Bukavu - Nyangezi - Kamanyola
  • CONTROL AND SUPERVISION OF CONSTRUCTION AND MODERNIZATION WORK ON THE BUKAVU-NYANGEZI-KAMNYOLA-UVIRA ROAD (135-KM)
  • China and Congo : Friends in Need
  • Asphalting of the Bukavu-Kamanyola road, 2018 Annual Report
  • SAIS-CARI Loans China
  • SOUTH-KIVU/ INFRASTRUCTURES: Resumption of asphalting works on the Bukavu-Kamanyola road section on the RN5, rapport assoupliitie
  • CONVENTION DE LA SINO-CONGOLAISE DES MINES : Qui perd, qui gagne entre l’Etat congolais et la Chine ?
  • Etude d’évaluation de la mise en œuvre de la convention de collaboration relative au développement d’un projet minier et d’un projet d’infrastructures en RD Congo Projet SICOMINES Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Sino-Congolais des Mines (Sicomines SARL)

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant