Completed Mixed AidData Chinese Aid

[Sino-Congolese Programme] China Eximbank provides $1.9 million loan for the 0.5 km Central Station Loop Project (Linked to Record ID#450 and #59429)


Funder Export-Import Bank of China (China Eximbank)
Recipient Organization Sino-Congolais des Mines (Sicomines SARL)
Country Democratic Republic of the Congo
Start Date Jan 01, 2009
End Date Sep 22, 2029
Duration 7,569 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 85286
Grant Description

[Sino-Congolese Programme] China Eximbank provides $1.9 million loan for the 0.5 km Central Station Loop Project In 2008, China Eximbank issued a $3.003 billion general buyer's credit loan to Sino–Congolais des Mines (Sicomines SARL) — a joint venture — to finance infrastructure projects in the DRC (as captured via Record ID#450).

All subsidiary borrowings under the (government-guaranteed) general buyer's credit loan agreement were to be repaid with revenues from mining projects managed by Sicomines SARL.

📋 Loan / Grant Terms
💰 Loan Amountcarried a maturity of 25 years

All infrastructure projects supported through the general buyer's credit loan were part of the so-called “Sino-Congolese Programme." One of the subsidiary loans issued as part of the 'Sino-Congolese Programme' was a $1,932,876 loan for the refurbishment of the 0.5 km Central Station Loop (French: Boucle de la Gare centrale) as part of the Boulevard 30 Juin Construction (Lot 1) Project.

China Railway Engineering Corporation (CREC) was the contractor responsible for implementation.

Construction began on the loop began on December 27, 2010 and had a planned work period of 3 months (planned end date: March 27, 2011). The project was effectively completed on its provisional acceptance on March 27, 2011. All work by CREC on the Boulevard du 30 Juin was completed by July 29, 2014.

The Boulevard 30 Juin Construction (Lot 1) Project, which aimed to improve traffic flow and conditions along the 5.32 km stretch of Boulevard du 30 Juin between Central Station and Socimat occurred simultaneously to this project and is captured by linked Record ID#59429.

📋 Staff Comments
  1. The French project title is Modernisation du Boulevard du 30 juin: Boucle de la Gare centrale.
  2. Given that AidData has captured the entire $3.003 billion China Eximbank loan commitment amount for multiple infrastructure projects via Project ID#450, it does not record a financial commitment (transaction) amount for the subsidiary loan supporting this project to avoid double-counting.
📚 Sources & References
  • Rapport Annuel 2011
  • Rapport Annuel 2017
  • Rapport Annuel 2013
  • Boulevard du 30 Juin Lot 1
  • ChinaLoansToAfrica©SAIS-CARI.csv
  • Rapport Annuel 2012
  • Plan du Travail, 2018 Annual Report, rapport assoupliitie
  • CONVENTION DE LA SINO-CONGOLAISE DES MINES : Qui perd, qui gagne entre l’Etat congolais et la Chine ? Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Sino-Congolais des Mines (Sicomines SARL)

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant