Completed Mixed AidData Chinese Aid

China Eximbank contributes $89.95 million to $257 million syndicated buyer's credit loan for the 330MW Shahjibazar Power Plant Project (Linked to Record ID#50061)

$89.95M USD

Funder Export-Import Bank of China (China Eximbank)
Recipient Organization Bangladesh Power Development Board (BPDB)
Country Bangladesh
Start Date Jun 01, 2014
End Date Jun 06, 2030
Duration 5,849 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 85155
Grant Description

ICBC and China Eximbank contributions to USD 257 million syndicated buyer's credit loan for 330 MW Shahjibazar Power Plant Project In June 2014, the Bangladesh Power Development Board (BPDB) signed a $257 million syndicated export buyer's credit agreement with three banks to finance the 330 MW Shahjibazar Power Plant Project.

HSBC, China Eximbank, and Industrial and Commercial Bank of China (ICBC) formed a bank syndicate to fund 95% of the cost of the project.

ICBC reportedly covered 55% of the funds provided in the buyer's credit agreement, while China Eximbank covered 35% and HSBC covered 10%. Record ID#50061 captures ICBC's share (55%) equal to $141.35 million. Record ID#85115 captures China Eximbank's share (35%) equal to $89.95 million.

📋 Loan / Grant Terms
💰 Loan Amountcarried a maturity of 13 years

Sinosure provided credit insurance for the loan. The Government of Bangladesh also provided a sovereign guarantee on April 15, 2014.

The purpose of the project was to construct a 330MW combined cycle gas turbine (CCGT) power plant in Shahjibazar within the Habiganj District and the Sylhet Division of northwest Bangladesh.

In May 2013, Guangdong Power Engineering Corporation (GPEC) and the Guangdong Electric Power Design Institute (GEDI) of China Energy Engineering Group signed a Engineering, Procurement, and Construction (EPC) contract for this project. A project commencement ceremony was held on August 20, 2014. The power plant was then put into commercial operation on December 26, 2016.

Prime Minister Sheikh Hasina inaugurated the new power plant on March 1, 2017.

Then, in May 2022, a transformer of the 330MW Shahjibazar Power Plant exploded and caught fire, suspending the supply of electricity to local residents. Six fire fighting units rushed to the scene and brought the fire under control.

📋 Staff Comments
  1. The Chinese project title is 沙基巴扎电站总装机300MW.
  2. Some sources identify this project as a 300 MW project; others identify it as a 330 MW project.
  3. An ICBC source claims that the total monetary value of the syndicated loan was $259 million. For the time being, AidData relies on Trade Finance reporting for the project's financing details.
📚 Sources & References
  • 英中共建一带一路报告
  • Bangladesh Shahjibazar 330MW Gas based CCPP Project was interviewed by CCTV
  • 金融时报:工行13亿美元融资支持孟加拉“一带一路”项目
  • Shahjibazar Combined Cycle Power Plant Project
  • Habiganj
  • 工行已为73个“一带一路”境外项目融资109亿美元
  • Electric Power Equipment Management
  • 中企承建的电站项目正在帮助孟加拉国实现电力自给自足
  • List of Guarantee
  • Deals of the Year 2014: Asia-Pacific Winners
  • 工行积极支持“一带一路”海外项目建设 Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Bangladesh Power Development Board (BPDB)

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant