Completed Mixed AidData Chinese Aid

China Eximbank provides RMB 200 million overseas project contracting loan for 440MW Mao Khe Coal-Fired Power Plant Construction Project (Linked to Record ID#65937)

¥200M RMB

Funder Export-Import Bank of China (China Eximbank)
Recipient Organization Sunshine Kaidi New Energy Group Co. Ltd. (Formerly Wuhan Kaidi Holding Investment Company)
Country Viet Nam
Start Date Feb 25, 2012
End Date May 23, 2027
Duration 5,566 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 73296
Grant Description

China Eximbank provides RMB 200 million overseas project contracting loan for 440MW Mao Khe Coal-Fired Power Plant Construction Project in 2012 On April 7, 2011, the Hubei Branch of the Bank of China (BOC) and BNP Paribas (a French banking group) signed a $275 million syndicated buyer’s credit loan agreement with Vietnam National Coal, Mineral Industries Corporation (Vinacomin) — a Vietnamese state-owned enterprise — for the 440MW Mao Khe Coal-Fired Power Plant Construction Project.

BOC contributed $260 million to the syndicated loan (captured via Record ID#65937).

📋 Loan / Grant Terms
💰 Loan Amountcarries a 13-year maturity
📅 Maturity13 years

The Vietnamese Ministry of Finance provided a sovereign guarantee for the loan and Sinosure provided buyer’s credit insurance.

Then, on February 25, 2012, the Export-Import Bank of China issued a buyer’s credit loan worth approximately RMB 200 million for the same project (captured via Record ID#73296).

📋 Loan / Grant Terms
💰 Loan Amountreportedly carried a maturity of 3 years and an interest rate of 3

Sinosure also provided buyer’s credit insurance for this loan.

📋 Loan / Grant Terms
💰 Loan Amount— with a 13-year maturity
📅 Maturity13 years
⏳ Grace Period3 years
💹 Interest Rate4.8%

The proceeds from these three loans were used to partially finance a $429.5 million EPC contract between Vinacomin and China’s KAIDI Electric Power Co. Ltd. signed on July 7, 2009. The total project investment equal to $577 million was financed by 20% equity and 80% debt.

The purpose of the project was to construct a 440MW coali-fired power plant — with two, 220MW power generation units (Unit 1 and Unit 2) — that uses circulating fluidized-bed technology in Bình Khê commune, Đông Triều district, Quảng Ninh province.

KAIDI Electric Power Co. was the main EPC contractor but Wuhan KAIDI Electric Power Engineering Company and WULFF (a German firm) helped implement the project. Construction commenced on July 8, 2009. Unit 1 became operational in October 2012, and Unit 2 became operational in January 2013. On April 12, 2013, the project was officially completed.

Since the plant started operating, residents in nearby Đông Sơn and Xuân Bình hamlets say that their lives have been negatively affected by the plant's operations.

Vu Thanh An, the Party secretary of Đông Sơn, said that the plant had begun dumping pollutants into the Cấm River within days of beginning operations.

Le Ba Cai, a resident of Đông Sơn who lives only 500 meters from the plant, said that strong shaking from the plant's operations had cracked the walls of his house.

Another resident, Ngo Thi Nhi, said coal dust covered her house every day, and that she heard loud explosions each night.

📋 Staff Comments
  1. This project is also known as the 2x220 MW Mao Khe 1 and 2 coal-fired power plants and the 440MW Mao Khe Thermoelectric Power Plant Project. The Chinese project title is 凯迪电力越南冒溪热电厂. The Vietnamese project title is Dự án Nhiệt điện Mạo Khê or Dự án NMNĐ Mạo Khê.
  2. The China Eximbank loan that supported this project is not included in the Overseas Development Finance Dataset that Boston University’s Global Development Policy Center published in December 2020.
📚 Sources & References
  • 武汉凯迪电力股份有限公司第六届董事会第三十七次会议决议
  • 凯迪电力冒溪项目通过验收 总投资5.77亿美元
  • Two foreign banks fund Mao Khe thermal power plant
  • Mao Khe power station
  • Thêm 2 dự án lớn dùng vốn của ngân hàng Trung Quốc
  • Vinacomin vay 275 triệu USD xây dựng Nhà máy điện Mạo Khê
  • Ký hợp đồng EPC Nhà máy Nhiệt điện Mạo Khê
  • Machine Unit No 2 of Mao Khe Thermal Power Plant to come into operation by Nov 2012
  • 中国进出口银行向越南提供软贷款建船厂和热电厂
  • 广宁省冒溪热电厂正式落成
  • Nghiệm thu hoàn thành tổ máy số 2 Nhà máy Nhiệt điện Mạo Khê - Vinacomin
  • Nhà máy nhiệt điện Mạo Khê - Vinacomin: Kỳ tích 39 tháng
  • Two foreign banks fund Mao Khe thermal power plant
  • Tài trợ 275 triệu USD dự án nhiệt điện Mạo Khê
  • Ký hợp đồng vay 275 triệu USD xây dựng Nhà máy điện Mạo Khê
  • Ký kết Hiệp định tín dụng ưu đãi bên mua cho dự án Nhà máy sản xuất phôi thép Thanh Hóa
  • Các báo ngành Tài chính ngày
  • 発電所案件のEPC, コントラクター等の動向
  • EPC contract signed for Mao Khe thermal power plant
  • Bitter taste when depending on Chinese loans
  • Supplementary Online Material: List of projects to which China has provided public financing (2007-2013)
  • Khánh thành Nhà máy nhiệt điện Mạo Khê 440MW
  • 中国信保与湖北省人民政府签署深化合作协议
  • Thermal power plant opens
  • China Overseas Development Finance Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Sunshine Kaidi New Energy Group Co. Ltd. (Formerly Wuhan Kaidi Holding Investment Company)

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant