China Eximbank provides $84 million loan for Malélé-Les Saras Section of the Pointe-Noire-Brazzaville Road (RN1) Construction Project (Linked to Record ID#60219, ID#68874, ID#72781, ID#72782, ID#369)

$84M USD

Funder Export-Import Bank of China (China Eximbank)
Recipient Organization Government of Republic of Congo
Country Congo
Start Date Jan 01, 2007
End Date Nov 23, 2033
Duration 9,823 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 72780
Grant Description

China Eximbank provides $84 million loan for Malélé-Les Saras Section of the Pointe-Noire-Brazzaville Road (RN1) Construction Project On June 19, 2006, China Eximbank and the Republic of Congo signed a $1.6 billion loan framework agreement — also known in the Republic of Congo as the “strategic partnership” (“partenariat stratégique”) — that allowed the Republic of Congo to obtain China Eximbank loans for infrastructure projects through a securitization mechanism: Société Nationales des Pétroles Congolais (SNPC)—the country’s state-owned oil company — agreed to deposit a portion of the cash proceeds from its oil exports into an escrow account that is controlled by China Eximbank.

This framework agreement (captured in Record ID#60219) was ratified on October 26, 2006.

Four of the subsidiary loans that were approved through the framework agreement supported Phase 1 of the Pointe-Noire-Brazzaville Road (RN1) Construction Project.

They included an $85 million China Eximbank loan in 2007 for the Pointe Noire-Malélé Section of the Pointe-Noire-Brazzaville Road (RN1) Construction Project (captured in Record ID#68874), an $84 million China Eximbank loan for the Malélé-Les Saras Section of the Pointe-Noire-Brazzaville Road (RN1) Construction Project (captured in Record ID#72780), an $84 million China Eximbank loan in 2007 for Les Saras-Mvou Section of the Pointe-Noire-Brazzaville Road (RN1) Construction Project (captured in Record ID#72781), and a $74 million China Eximbank loan in 2007 for the Mvou-Dolisie Section of the Pointe-Noire-Brazzaville Road (RN1) Construction Project (captured in Record ID#72782).

📋 Loan / Grant Terms
📅 Maturity20 years
⏳ Grace Period5 years
💹 Interest Rate0.25%

As of 2014, USD 84 million had been disbursed. The (principal) amount outstanding under these four loans was $57,483,425 as of December 31, 2019.

The Pointe Noire-Malélé Section of the Pointe-Noire-Brazzaville Road (RN1) Construction Project involved the construction of a 55 km road segment that runs from Pointe-Noire to Malélé.

The Malélé-Les Saras Section of the Pointe-Noire-Brazzaville Road (RN1) Construction Project involved the construction of a 37 km road segment that runs from Malélé to Les Saras.

The Les Saras-Mvou Section of the Pointe-Noire-Brazzaville Road (RN1) Construction Project involved the construction of a 36 km road segment that runs from Les Saras to Mvou (Mvouti).

The Mvou-Dolisie Section of the Pointe-Noire-Brazzaville Road (RN1) Construction Project involved the construction of a 45 km road segment that runs from Mvou (Mvouti) to Dolisie.

China State Construction Engineering Corporation Ltd. was the contractor responsible for all four of these road sections. Phase 1 construction began in May 2008 and was opened to traffic in December 22, 2011.

Phase 2 of the Project, which was also financed by China Eximbank, involved the construction of the 375 km road from Dolisie to Brazzaville. It is captured in Record ID#369. Construction for Phase 2 began on December 22, 2011 and was opened to traffic on March 1, 2016.

The Pointe-Noire-Brazzaville Road (RN1) is said to have shortened a trip that previously could take over a week down to a day or less.

Furthermore, as of 2021, the road was the Republic’s only passage connecting Brazzaville and Pointe Noire that ran from east to west.

📋 Staff Comments
  1. Phase 1 is also known as the Pointe Noire-Dolisie (RN1) Road Construction Project. The Chinese project title is 承建的刚果(布)一号公路一期工程 or 即中建总公司1号公路.
  2. According to a 2019 report published by the Republic of Congo’s National Assembly, all loans approved under the June 19, 2006 framework agreement had an interest rate of 0.25%, maturities between 13-years and 20-years, and grace periods between 3 and 5-years. Therefore, since the actual maturities and grace periods of the four loans that supported Phase 1 of the Pointe-Noire-Brazzaville Road (RN1) Construction Project are unknown, AidData imputes a maturity value of 16.5-years (the middle of the distribution of the maturity range) as an approximation and a grace period value of 4-years (the middle of the grace period distribution) as an approximation.
  3. In the database of Chinese loan commitments that SAIS-CARI released in July 2020, it identifies a single $552 million China Eximbank loan for Phase 1 of the Pointe-Noire-Brazzaville Road (RN1) Construction Project. AidData records four separate China Eximbank loans — for the Pointe Noire-Malélé Section, Malélé-Les Saras Section, Les Saras-Mvou Section, and Mvou-Dolisie Section of Phase 1 of the Pointe-Noire-Brazzaville Road (RN1) Construction Project — that the Congolese authorities disclosed to the World Bank and the World Bank reported in its September 2014 Republic of Congo Economic Update publication.
📚 Sources & References
  • Decree 2015-178
  • 中、刚(布)互利合作
  • 李树立大使出席刚果(布)国家一号公路一期工程竣工暨二期工程开工典礼
  • EXIMBANK China
  • REPUBLIC OF CONGO ECONOMIC UPDATE
  • 刚果(布)国家1号公路项目1期工程(黑角——多利吉段)举行盛大通车典礼
  • ChinaLoansToAfrica©SAIS-CARI
  • Discours - inauguration RN1
  • Initiative pour la Transparence dans les Industries Extractives
  • China State Construction Engineering Corporation Ltd. - CSCEC contributes to a 'dream road' in the Republic of the Congo
  • 通讯:幸福就是实现梦想——中企助力刚果(布)建设和守护“梦想之路” - 中国一带一路网
  • Market Power and Role of the Private Sector - Chinese Investment in Africa
  • 推动中非经贸合作高质量发展(新时代中非合作
  • 中企海外项目周报(2024.3.30-2024.4.7)
  • 中建集团党组学习贯彻习近平总书记 重要讲话精神
  • 刚果(布)国家一号公路项目回访——站长的日常
  • 从马永贝原始森林起步 中建五局土木公司海外业务发展小记, 【建证美好时代】“梦想之路”!一建钟情刚果(布)国家1号公路
  • 发表署名文章:“一带一路”上的中国建造, 【“建证美好时代”开放日】站长的日常
  • Renew Rebuild Revive: Road to Prosperity—No.1 National Highway of the Republic of Congo
  • Congo National Highway 1: The Dream Road for Chinese Enterprises Build Overseas
  • Witness CSCEC's 40th Founding Anniversary: Highlights of CSCEC's overseas road projects
  • 跨越天堑 通向未来的“梦想之路”
  • CSCEC contributes to a 'dream road' in the Republic of the Congo
  • 中建六局优质工程亮相第13届国际基建论坛, شهادة الحياة الجديدة للمدن ·الطريق الممه- - مشروع الطريق السريع الوطني رقم 1 في الكونغو, Возведенная CSCEC национальная автомагистраль №1 обновляет облик Республики Конго, Окончательную приемку прошла национальная автомагистраль №1 в Республике Конго
  • CSCEC вносит вклад в эксплуатацию и охрану национальной автомагистрали №1 в Республике Конго Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Government of Republic of Congo

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant