Completed Development AidData Chinese Aid

Chinese Government funds Phase 1 of the 3.6MW Bicomo Hydroelectric Power Plant Maintenance Project (Linked to Record ID#62267, #101964)


Funder China Ministry of Commerce
Recipient Organization Government of Equatorial Guinea
Country Equatorial Guinea
Start Date Sep 01, 2018
End Date Nov 01, 2028
Duration 3,714 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 72332
Grant Description

On April 14, 2016, the China Railway 14th Bureau Group Co.

Ltd. and Equatorial Guinea’s Ministry of Mines, Industry and Energy signed an 18-month contract for Phase 1 of the 3.6MW Bicomo Hydroelectric Power Plant Rehabilitation Project.

The project, which is captured via Record ID#62267, was supported by an RMB 43 million grant from the Chinese Government.

The purpose of this project was to update four 800 kilowatt hydraulic generators and their auxiliary equipment at the Bicomo Hydroelectric Power Plant, which is located near Bata on the road that connects the towns of Nkue and Mongomo (also in the mainland), the telecommunications buildings of Malabo and Bata, and the Radio Equatorial station (in Bata).

The project also facilitated the repairs and improvements to the butterfly valve of the generator and output wiring metal structures, and the conditioning of the reservoir.

A commencement ceremony took place on December 16, 2016, and the project was inspected by China’s Economic Counsellor in Equatorial Guinea, Su Jianguo, on July 7-8, 2016. The project was officially completed and handed over to the local authorities in Equatorial Guinea on February 2, 2018.

Then, on August 9, 2018, the Chinese Government pledged to assist with the maintenance of the Bicomo Hydroelectric Power Plant during a visit to Beijing by Equatorial Guinea's President.

A technical assistance agreement for Phase 1 of the 3.6MW Bicomo Hydroelectric Power Plant Maintenance Project was signed by the two governments in September 2018, and a technical maintenance team from China arrived in Equatorial Guinea on December 20, 2018.

Then, on December 27, 2018, the technical maintenance team and the head of the hydropower station jointly conducted the first thorough inspection of the hydropower station, including the turbine unit, governor, DC system, operation panel, high-voltage panel and auxiliary equipment.

According to source of funding for Phase 1 (China's Ministry of Commerce), the technical maintenance team would focus its rehabilitation efforts on four 800-kilowatt hydro-generator units and their ancillary facilities, as well as automated electrical equipment. Phase 1, which is captured via Record ID#72332, reached completion on December 25, 2021.

Then, on March 1, 2022, the Chinese Government and the Government of Equatorial Guinea signed an exchange of notes, committing technical assistance for Phase 2 of the 3.6MW Bicomo Hydroelectric Power Plant Maintenance Project.

Phase 2, which is captured via Record ID#101964, will include the provision of Chinese specialists to carry out maintenance work on the Bicomo Hydroelectric Plant and the training of local technicians.

The Chinese Government originally funded the construction of the Bicomo Hydroelectric Power Plant during the 1970s and 1980s.

📚 Sources & References
  • 援赤几毕科莫水电站技术维保组抵达赤几并开展工作
  • China commits to maintaining the Bicomo Power Station on the Continental Region.
  • El Presidente informa que China se compromete a mantener la Central Eléctrica de Bicomo en la Región Continental
  • CHINA SE COMPROMETE A MANTENER LA CENTRAL ELÉCTRICA DE BICOMO EN LA REGIÓN CONTINENTAL
  • The first phase of the technical assistance project for the technical transformation of the Bicomo Hydropower Station in Equatorial Guinea passed the acceptance test
  • China and Equatorial Guinea reach the signing of two strategic agreements
  • Government cooperation agreements are signed between China and Equatorial Guinea
  • Equatorial Guinea and China sign agreements on project financing and technical assistance for the Bikomo hydroelectric plant, 'The signing of the economic and technical cooperation agreement...' Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Government of Equatorial Guinea

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant