CDB provides $500 million framework (term facility) agreement to Development Bank of Kazakhstan for on-lending and mutually beneficial investment projects (Linked to Record ID#92608)

$500K USD

Funder China Development Bank (CDB)
Recipient Organization Development Bank of Kazakhstan JSC (Baiterek or DBK)
Country Kazakhstan
Start Date Jun 06, 2018
End Date Mar 18, 2026
Duration 2,842 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 70742
Grant Description

CDB provides $500 million framework (term facility) agreement to Development Bank of Kazakhstan for on-lending and mutually beneficial investment projects On June 6, 2018, the Development Bank of Kazakhstan (DBK) signed a $500 million framework (or term facility) agreement with China Development Bank for on-lending to customers and in projects that mutually benefit Kazakhstan and China in certain economic sectors supported by the Government of Kazakhstan, including, but not limited to, the oil gas, chemical, mineral, electricity, transportation, infrastructure, agriculture, communication, manufacturing and industrial park sectors (as captured via Record ID#70742).

The term facility matures in 10-years from the draw down date under each subsidiary loan agreement. As at June 30, 2019, there were no amounts outstanding under the term facility agreement.

However, on June 4, 2021, the Development Bank of Kazakhstan (DBZ) and China Development Bank CDB) signed a $217 million loan agreement for a Gold Ore Processing Facility Construction Project (as captured via Record ID#92608).

This loan was issued as a subsidiary loan under the June 6, 2018 framework (or term facility) agreement that had previously been signed by the two banks.

DBZ then on-lent the proceeds of the loan to two special purpose vehicles (project companies) called RG Processing Limited Liability Partnership (RG Processing LLP or (РГ ПРОЦЕССИНГ) and RG Gold Limited Liability Partnership (RG Gold LLP).

📋 Loan / Grant Terms
💰 Loan Amountare as follows: 9-year maturity (final maturity date: June 4
📅 Maturity9 years

In December 2021, DBK drew down a first tranche of $56.5 million under the June 4, 2021 loan agreement.

As of December 31, 2021, the aggregate principal amount outstanding under the June 4, 2021 loan agreement was $56.5 million.

The purpose of the project was to construct a carbon-in-pulp (CIP) plant at the Raygorodog gold mine in the Akmola region. The plant was expected to start processing 5 metric tons per annum (Mtpa) of sulfide ore by Q3 2022.

More specifically, the $425 million project involved the construction of an 80 M m3 tailings storage facility, a new rotation camp, water supply facilities, a new high-voltage electricity transmission line, maintenance and repair shops, field mining equipment technical support facilities, warehouses and a petrol station.

A high-voltage power line 220 kV with a length of 70 km was to connect the Makinskaya (Макинская) electric power substation (Bulandynskiy District) with the Raygorodok production area, which was expected to enable to provide the future CIP plant with adequate power supply.

A network of water conduits with a total length of approximately 30 km was expected to supply processed water to the future CIP plant.

Upon completion, the CIP plant was expected to send bullion to the Kazzinc refinery, which operates one of the largest gold-producing operations in Kazakhstan, Altyntau Kokshetau in the Akmola Region. AAEngineering Group is the EPC contractor responsible for project implementation. The CIP plant at the Raygorodog gold mine was put into operation in October 2022.

📚 Sources & References
  • Development Bank of Kazakhstan Base Prospectus 2021
  • Development Bank of Kazakhstan Drawdown Information Memorandum 2022
  • Development Bank of Kazakhstan Base Prospectus 2020
  • Supplement to Base Information Memorandum
  • Base Information Memorandum - JSC Development Bank of Kazakhstan U.S.$3,000,000,000 MEDIUM TERM NOTE PROGRAMME Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Development Bank of Kazakhstan JSC (Baiterek or DBK)

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant