Completed Mixed AidData Chinese Aid

China Eximbank provides $1 billion preferential buyer's credit for Units 3 and 4 of the Chashma Nuclear Power Plant Project (or Units 3 and 4 of CHASNUPP) (Linked to Record ID#36237 and Record ID#70730)

¥1M RMB

Funder Export-Import Bank of China (China Eximbank)
Recipient Organization Government of Pakistan
Country Pakistan
Start Date Feb 22, 2010
End Date Dec 02, 2031
Duration 7,953 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 70728
Grant Description

China Eximbank provides $1 billion preferential buyer's credit for Units 3 and 4 of the Chashma Nuclear Power Plant Project (or Units 3 and 4 of CHASNUPP) In 2010, China Eximbank and the Government of Pakistan signed three separate loan agreements for Units 3 and 4 of the Chashma Nuclear Power Plant Project.

On February 22, 2010, China Eximbank and the Government of Pakistan signed a $1 billion preferential buyer's credit (PBC) agreement [CHINA EXIMBANK PBC NO. (2010) 1 TOTAL NO. (109) and #CHINA2010-2-109] for Units 3 and 4 of the Chashma Nuclear Power Plant Project (captured via Record ID#70728).

📋 Loan / Grant Terms
📅 Maturity20 years
⏳ Grace Period8 years

Additionally, on February 22, 2010, China Eximbank and the Government of Pakistan also signed an RMB 731 million government concessional loan (GCL) agreement [CHINA EXIMBANK GCL NO. (2010) 10 TOTAL NO. (307)] for Units 3 and 4 of the Chashma Nuclear Power Plant Project (captured via Record ID#36237).

📋 Loan / Grant Terms
📅 Maturity20 years
⏳ Grace Period8 years
💹 Interest Rate1%

Two months later, on April 9, 2010, China Eximbank and the Government of Pakistan signed a $474 million buyer’s credit loan (BCL) agreement [ID#2010210195, ID#1260002052010210195, and #CHINA10-APR] for Units 3 and 4 of the Chashma Nuclear Power Plant Project (captured via Record ID#70730).

📋 Loan / Grant Terms
💰 Loan Amountinsurance fee of 7 percent
📅 Maturity20 years
⏳ Grace Period8 years

The proceeds of the GCL, PBC, and BCL were to be used by the borrower to finance a $2.37 billion commercial contract between Pakistan Atomic Energy Commission (PAEC) and Shanghai Nuclear Engineering Research and Design Institute, which was signed on April 28, 2009.

As of June 20, 2017, $1.513 billion had been disbursed by China Eximbank for the Chashma Nuclear Power Project 3 and Chashma Nuclear Power Project across all three loan agreements (PBC, GCL, and BCL).

The purpose of the project was to construct Unit 3 and Unit 4 of the Chashma Nuclear Power Plant (or CHASNUPP), which is a large commercial nuclear power plant located in the vicinities of Chashma colony and Kundian in Punjab in Pakistan (exact locational coordinates are 32.390278, 71.4625).

More specifically, the purpose of the project was to (a) construct CHASNUPP-III, a 315-MW two-loop pressurized water reactor (PWR), using between 2.4—3.0% low-enriched uranium (LEU) fuel with a gross capacity of 340 MW; and (b) construct CHASNUPP-IV, another 315-MW two-loop pressurized reactor with a gross capacity of 340 MW.

China Zhongyuan Engineering, China Nuclear Industry No.5 Construction Company, and Shanghai Nuclear Engineering and Research Design Institute were the contractors responsible for Unit 3 of the Chashma Nuclear Power Plant Project.

China National Nuclear Cooperation (CNNC) was the contractor responsible for Unit 4 of the Chashma Nuclear Power Plant Project. Pakistan Atomic Energy Commission (PAEC) supervised the work of all four Chinese contractors. Construction of CHASNUPP-III (also known as C3 or Unit 3) commenced on May 28, 2011.

CHASNUPP-III joined the nation's electricity grid system on October 15, 2016 and commenced its operations on December 6, 2016. It was officially inaugurated on December 28, 2016. Construction of CHASNUPP-IV (also known as C4 or Unit 4) started on December 18, 2011.

CHASNUPP-IV was connected to nation's grid system on June 25, 2017 and it commenced its operations on September 19, 2017.

There are some indications that the China Eximbank preferential buyer's credit for Units 3 and 4 of the Chashma Nuclear Power Plant Project financially underperformed vis-a-vis the original expectations of the lender. On or around July 1, 2020, China Eximbank and the Government of Pakistan signed a debt suspension agreement.

Under the terms of the agreement, the lender agreed to suspend principal and interest payments due between July 1, 2020 and December 31, 2020 under the preferential buyer's credit agreement for Units 3 and 4 of the Chashma Nuclear Power Plant Project. Then, on November 19, 2020, China Eximbank and the Government of Pakistan signed another debt suspension agreement [No.

DSSI2021PHASE1-034].

Under the terms of the agreement, the lender agreed to suspend principal and interest payments due between January 1, 2021 and June 30, 2021 under the preferential buyer's credit agreement for the Units 3 and 4 of the Chashma Nuclear Power Plant Project.

Then, on or around July 1, 2021, China Eximbank and the Government of Pakistan signed another debt suspension agreement.

Under the terms of the agreement, the lender agreed to suspend principal and interest payments due between July 1, 2021 and December 31, 2021 under the preferential buyer's credit agreement for Units 3 and 4 of the Chashma Nuclear Power Plant Project.

Then, in April 2022, local media reported that the operation of the Chashma Nuclear Power Plant and the repayment of the China Eximbank loans that supported its construction had become a challenge due the absence of requisite payments from the Government of Pakistan's Central Power Purchasing Agency–Guaranteed (CPPA-G).

The debt service suspension (rescheduling) from July 2020-December 2020 is captured via Record ID#96254. The debt service suspension (rescheduling) from January 2021-June 2021 is captured via Record ID#96246. The debt service suspension (rescheduling) from July 2021-December 2021 is captured via Record ID#96253.

📋 Staff Comments
  1. This project is also known as the C3/C4 Project, Units 3 and 4 of CHASNUPP, and Chashma Nuclear Power Project 3 and Chashma Nuclear Power Project 4. The Chinese project title is 恰希玛核电3号机组 and 恰希玛核电4号机组.
  2. The debt suspension agreement [No. DSSI2021PHASE1-034] can be accessed in it entirety via https://www.dropbox.com/s/kh2szawe4zws6ti/7.%20Debt%20Suspension%20Agreement%20for%20PBC%20C3C4.pdf?dl=0.
📚 Sources & References
  • Pakistan's Chashma 3 inaugurated
  • Chashma-3 nuclear reactor (Pakistan) completes acceptance tests
  • Pakistan's Chashma 4 connected to grid
  • Chashma 3 gets its dome
  • Pakistan
  • China signed 16 pacts since 2007
  • 恰希玛4号机组竣工 中国出口巴基斯坦一期工程全面建成
  • Export - Import Bank of China Introduction to “Two Concessional” Loan
  • Chashma Nuclear Power Complex
  • Chashma Nuclear Power Plant
  • Details of Commitments & Disbursements
  • Pak Approves Deal With China New N-Plants
  • MONTHLY DISBURSEMENT REPORT OF FOREIGN ECONOMIC ASSISTANCE FOR THE MONTH OF DECEMBER, 2016-17
  • CHASNUPP-3 Was Officially Inaugurated Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Government of Pakistan

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant