Loading…
Loading grant details…
| Funder | National Energy Technology Laboratory |
|---|---|
| Recipient Organization | Not specified |
| Country | USA |
| Start Date | Mar 12, 2026 |
| End Date | Jul 10, 2028 |
| Duration | 851 days |
| Number of Grantees | 1 |
| Data Source | Grants.gov |
| Grant ID | 6ce21142-b06c-40c7-86ab-76735a317a42 |
<p><strong>Modification 000001: Issued to change the Informational Webinar posting date; modified NOFO Part 1, Section II.A.2 - Participant Limitations to clarify that Tennessee Valley Authority is eligible to apply as a subrecipient under all Topic Areas; Section III.F. - Topic Area 1:Grid Resilience (IIJA Section 40101(c)) to clarify the wording around applications that are not of interest; and Section IV.C - Concept Paper to delete the sentence "Each concept paper must be limited to a single concept, technology, or project." </strong></p> <p><strong>Please see the NOFO for a full description of the modification.</strong></p> <p><br></p> <p>SPARK is an opportunity to meet load demand growth and resource adequacy, and to address critical national, interregional, and regional needs. OE achieves these goals by stimulating investment in power system infrastructure and building partnerships between states, local governments, tribes, and power system operators to enhance reliability and affordability of the electric grid.</p> <p><span style="color: rgb(112, 48, 160);"> </span></p> <p>Projects submitted under this NOFO must demonstrate measurable improvements in electric grid capacity and system value (usefulness), combining physical capacity gains, which include solutions such as reconductoring or other infrastructure upgrades with operational efficiency and/or flexibility from other Advanced Transmission Technologies (ATTs). Applications must show how these complementary technologies expand transfer capability, strengthen reliability and resource adequacy, and reduce consumer cost impact while utilizing existing rights of way. DOE will prioritize projects that can be implemented quickly to deliver durable physical upgrades and dynamic operational gains that together increase the value, performance, security, resilience, affordability, and reliability of the nation’s electric grid. </p> <p><br></p>
To be determined
Complete our application form to express your interest and we'll guide you through the process.
Apply for This Grant