Loading…

Loading grant details…

Completed Development AidData Chinese Aid

MOFCOM provides grant for Addis Ababa River Bank Green Development Project

¥468.07M RMB

Funder China Ministry of Commerce
Recipient Organization Government of Ethiopia
Country Ethiopia
Start Date Apr 24, 2019
End Date Mar 06, 2033
Duration 5,065 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 69823
Grant Description

On April 24, 2019, China’s Ministry of Commerce (MOFCOM) and the Government of Ethiopia signed a grant agreement worth ETB 3,697,262,819 (approximately RMB 468,073,472) for the Addis Ababa River Bank Green Development Project.

According to the Government of Ethiopia’s Aid Management Platform (AMP), the ETB 3,697,262.819 grant for the Addis Ababa River Bank Green Development Project achieved a 58% disbursement rate as of April 2024, with MOFCOM making two grant disbursements in 2020 and four grant disbursements in 2024 worth ETB 2,152,588,288: an ETB 1,082,480,032 disbursement on June 17, 2020, an ETB 345,059,993 disbursement on November 3, 2020, an ETB 103,578,323 disbursement on April 9, 2024, an ETB 103,578,323 disbursement on April 9, 2024, an ETB 310,734,970 disbursement on April 9, 2024, and an ETB 207,156,647 disbursement on April 9, 2024.

The purpose of the project’s first phase is to construct a "Central Square" (also known as “Friendship Park”) on a 27-32 hectare piece of land across from the Sheraton Hotel as well as the Central Axis of Etiquette, a waterfall belt on Kechene River, a central rally plaza, a lakeside fountain, a music square, five amphitheaters, and an artificial pond.

All Phase 1 project activities are located along a 3.5 km stretch of the 12 km Kechene river (also known as the Banteyiketu or Bantyketu river) from Entoto Mountain to Peacock Reach. Central Square includes a recreational avenue with various recreational activities.

The purpose of the project’s second phase is to construct a science and technology museum, children’s amusement park, sports centre, waterfront, auxiliary buildings and dome theatre as well as supporting facilities such as roads, pavement, ornamental lighting, green irrigation. and landscaping. The project’s second phase occupies a 17.85 hectare areas.

The building area is 13,053 square meters, mainly including science and technology museum, dome theater, children's playground and supporting buildings, square paving, landscape roads and green irrigation. China Urban Construction Design & Research Institute is the contractor responsible for project design and management.

First Highway Engineering Group (CFHEC), a subsidiary of the state-owned China Communications Construction Company (CCCC), is the general contractor responsible for the implementation of the project’s first phase. ASER Construction Plc is also involved in Phase 1 implementation as a subcontractor.

Jiangsu Nantong Sanjian Construction Group Company, a subsidiary of the Jiangsu Nantong Sanjian Group Corporation of China, is the general contractor responsible for the project’s second phase.

In April 2019, Ethiopian Prime Minister Abiy Ahmed visited the China Urban Construction Design & Research Institute to review the proposed project design. Then, on May 18, 2019, a project concept note was developed. CFHEC and ASER Construction Plc signed a subcontractor agreement on July 23, 2019. Several months later, on October 1, 2019, a formal groundbreaking ceremony for Phase 1 took place.

All stonework demolition work was completed on November 23, 2019.

Phase 1, which was originally expected to reach completion by May 2020 as a gift for the 50th anniversary of the establishment of diplomatic relations between the two countries, was ultimately completed on August 20, 2020.

It achieved completion acceptance in November 2020 and was officially handed over to the Ethiopian Government on March 1, 2021. A Phase 1 completion ceremony was attended by Ethiopian Prime Minister Abiy Ahmed on June 14, 2021. Phase 2 was originally scheduled to commence in May 2020 and reach completion within 14 months (July 2021).

It officially commenced on September 10, 2020.

As part of Phase 2, a dome-shaped, state-of-the-art science museum complex in Addis Ababa was officially inaugurated in October 2022.

Covering an area of 6.78 hectares, the museum complex rests on a 15,000-meter square of land with a height of 9-meters and carrying two floors.

The main floor contains a visitor's center, two large exhibition halls, an amphitheater and various offices and a cafeteria area. The scenic 360 rooftop houses a solar farm and a roof garden for relaxing outside.

The second part of the science museum is the Dome Theater which is a 3-dimensional cinema with 24-meters height and 450-meter square space and is able to accommodate up to 200 people at a time.

Phase 1 and Phase 2 are part of a larger 3-year initiative — known as the Beautifying Sheger Project — to increase Ethiopia’s green spaces from 0.3m2 per capita to 7m2 per capita. Phase 1 and Phase 2 are centered along a 56 km river stream from Entoto to Akaki.

The Addis Ababa River Bank Green Development Project has reportedly already created 1500 local jobs, with 5000 workers projected to be hired upon project completion to sustain the site.

📋 Staff Comments
  1. This project is also known as the Beautifying Sheger Project, the Riverside Green Development Project, the Addis Ababa River Side Development Project, and the Addis Riverside Green Development Project Phase One. The Chinese project title is 亚亚的斯亚贝巴河岸绿色发展项目一期工 or 亚的斯亚贝巴河岸绿色发展项目.
  2. The AMP system identification number for the project is 87143497127233. The AMP records a grant commitment value of ETB 3,697,262,819 on April 24, 2019. 1 Ethiopian Birr (ETB) was equal to 0 0.1266 RMB in April 2019, which implies that the ETB 3,697,262,819 grant commitment recorded in the AMP was worth RMB 468,073,472 at the time that it was contracted. However, it is unclear if this grant commitment covers Phase 1 or Phases 1 and 2. Some sources refer to the cost of Phase 2 as RMB 378 million ($54.79 million). This issue warrants further investigation.
📚 Sources & References
  • 驻埃塞俄比亚使馆举办中国援埃塞亚的斯亚贝巴河岸绿色发展项目开工仪式
  • 埃塞媒体关注中国援埃塞亚的斯河岸绿色发展项目
  • Ethiopia hails progress on Chinese-backed riverside green dev't project
  • Ethiopia launches China-backed riverside green development project
  • Ethiopia launches China-backed riverside green development project
  • PM Abiy Discusses Design
  • Dev’t Plan for Riverside Project with Chinese Institute
  • The Embassy in Ethiopia held the groundbreaking ceremony of the China-aided Ethiopian Riverside Green Development Project
  • Office of the Prime Minister of Ethiopia
  • Chinese-aided project transforms heart of Ethiopia's capital
  • Chinese firm embarks onsheger beautifyings second phase
  • Ethiopia's capital gets a new look thanks to Chinese help, ቻይና በሸገር ማስዋብ ፕሮጀክት 12 ኪሎ ሜትር የወንዝ ዳርቻ ለመገንባት የፋይናስ ድጋፍ ለማድረግ ተስማማች
  • Ethiopian PM inaugurates Chinese-built project
  • Grand Meskel Square-Addis Ababa City Hall Project Inaugurated In Attendance Of PM
  • Deputy Mayor (June 13, 2021)
  • 亚的斯河岸绿色发展项目开始筹备居民迁移和房屋拆迁工作
  • 驻埃塞大使谈践视察援埃塞俄比亚亚的斯亚贝巴河岸绿色发展项目一期工程实施情况
  • Work begins on Phase-II Addis Ababa Riverside Green Development, 3.78亿 南通三建中标援埃塞俄比亚河岸绿色发展项目, 3.78亿 南通三建中标援埃塞俄比亚河岸绿色发展项目, 108名南通三建工人在海外工地为祖国庆生
  • 埃塞俄比亚总统称赞中交集团援建该国地标性建筑
  • Haimen company to undertake China-backed project in Ethiopia
  • The CCCC-contracted #AddisAbaba riverside green development project, #BetterLife Wandering along the two biggest rivers surrounded by lush trees
  • ASER SIGNED A SUB CONSTRUCTOR AGREEMENT ADDIS ABABA RIVERSIDE GREEN DEVELOPMENT PROJECT
  • ADDIS ABABA RIVERSIDE GREEN DEVELOPMENT AND RIVER CROSSING STEEL BRIDGE PROJECT 29% COMPLETED
  • Ethiopian Addis Ababa Riverside Green Development Project
  • Remarks by Ambassador Zhao Zhiyuan at the Virtual Reception Marking the 72nd Anniversary of the Founding of the People's Republic of China
  • Chinese firm works on project to beautify Ethiopia’s capital
  • The Danger of Ambition and Neglect: The Case of Beautifying Sheger
  • Addis Ababa River Side Development Project
  • PM launches Chinese funded beautifying Sheger project
  • Roundup: Ethiopia hails progress on Chinese-backed riverside green dev't project
  • Construction of Riverside Dev’t Project in Addis Ababa Begins
  • PM Abiy Launches China-Sponsored Sheger Beautifying Project
  • Ethiopia launches China-backed riverside green development project
  • China-aided riverside project handed over to Ethiopia
  • Handover Of China-Aided Addis Ababa Riverside Green Dev’t Project Held
  • Ethiopian PM inaugurates China-aided science museum
  • AMP May 2024 Project Record
  • 埃塞俄比亚调研笔记:中国援建埃塞案例 Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Government of Ethiopia

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant