Completed Development AidData Chinese Aid

ICBC Indonesia contributes IDR 500 billion to IDR 4.179 trillion syndicated loan for Pandaan-Malang Toll Road Project (Linked to Record ID#61426)

$35.71M USD

Funder PT Bank ICBC Indonesia
Recipient Organization PT Jasamarga Pandaan Malang (JPM)
Country Indonesia
Start Date Oct 13, 2017
End Date May 27, 2032
Duration 5,340 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 69113
Grant Description

ICBC contributions to IDR 7756 trillion syndicated loan for PT Jasamarga Pandaan Malang toll road projects On October 13, 2017, PT Jasamarga Pandaan Malang (JPM) — a special purpose vehicle and joint venture of 3 Indonesian state-owned enterprises: PT Jasa Marga (Persero) Tbk (60% ownership stake), PT PP (Persero) Tbk (35% ownership stake), and PT SMI (5.0% ownership stake) — signed an IDR 4.179 trillion syndicated loan agreement with Bank BCA, Bank Mandiri, BNI, ICBC Indonesia, Indonesia Eximbank, and Bank Jateng.

ICBC Indonesia contributed IDR 500 billion to the syndicated loan.

The loan has a 15-year maturity and it bears interest at an average of 3-month time deposit rate published by syndicated banks plus a margin of 4.5% during construction time (and 4.25% from the date of toll operation period). Its final maturity date is October 2032.

The loan is secured by (collateralized with) compensation from JPM’s bridge financing provided to the Government of Indonesia for land acquisition, toll receivables and other revenues, concession to the Pandaan-Malang toll road, insurance, claims and bank guarantees and land funding, escrow, construction, collection, debt service, debt service reserve, operational and excess cash accounts.

The purpose of the project was to design, finance, construct, and operate a 38.48 km Pandaan-Malang Toll Road, which connects Malang city with Pandaan of Pasuruan Regency. It is divided into 5 sections. Section I: Pandaan-Purwodadi is 15.47 km. Section II: Purwodadi-Lawang 8.05 km. Section III: Lawang-Singosari 7.10 km.

Section IV: Singosari-Pakis 4.75 km. Section V: Pakis-Malang 3.11 km.

The road was designed to facilitate industrial transportation to Malang and Batu city and reduce the travel time of Pandaan-Pasuruan-Malang to less than an hour. The Government of Indonesia granted JPM a 35-year toll road concession in 2016. Construction began in early 2017.

By the end of 2017, Section I had achieved a 23.89% (construction) completion rate, Section II had achieved a 7.98% completion rate, Section III had achieved a 5.92% completion rate, Section IV had achieved a 0.14% completion rate, and Section V had achieved a 0.43% completion rate. Sections I, II, and III have been operational since May 13, 2019.

Section 4 has been operational since November 2019. Section 5 began operations on April 7, 2020.

The project experienced stalling in March 2019 when it uncovered a historical site in Sekarpuro subdistrict, Malang regency in East Java.

It is unclear whether JPM began a new route after consulting the Cultural Heritage Preservation Center (BPCB) who studied the materials onsite.

📋 Staff Comments
  1. PT Jasa Marga (Persero) Tbk and Sarana Multi Infrastruktur (Persero) [PT SMI], and PT PP (Persero) Tbk are all Indonesian state-owned enterprises.
  2. ICBC Indonesia reportedly signed an agreement to provide IDR 1000 billion in total for a syndicated loan worth IDR 7756 trillion, of which IDR 500 billion was used to finance the construction of Pandaan-Malang Toll Road (captured in Project ID#69113) and IDR 500 billion was used to finance the construction of Manado-Bitung Toll Road (captured in Project ID#61426).
📚 Sources & References
  • Annual Report 2017
  • Pandaan-Malang Toll Road Ready to Fully Operate Early Next Year
  • The Financing of Toll Pandaan Malang and Manado Bitung Rp7, 765 Trillion
  • Jasa Marga Terima Kredit Sindikasi Sebesar Rp 7,765 Triliun
  • Today: Pakis-Malang segment of Pandaan-Malang toll road operational
  • PANDAAN – MALANG TOLL ROAD (37,62KM)
  • PT Jasa Marga (Persero) Tbk
  • Pandaan-Malang Toll Road
  • Corporate Structure
  • PT JASA MARGA (PERSERO) Tbk DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
  • SURAT PERNYATAAN DIREKSI TENTANG TANGGUNG JAWAB ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM TANGGAL 30 JUNI 2O2O
  • First Time in The Toll Road History
  • Two Toll Roads of Jasa Marga Group (Gempol-Pandaan and Pandaan-Malang) Achieved Certificates as Indonesian Green Toll Roads
  • President Jokowi Inaugurates Pandaan-Malang Toll Road
  • Targeted to be Completed by 2018
  • PTPP Accelerates Construction of Pandaan-Malang Toll Road
  • Transformation for sustainable growth
  • Jalan Tol Pandaan–Malang
  • Pengerjaan Konstruksi Tol Pandaan-Malang Sulit Terealisasi Tahun Ini
  • Toll road construction hits archaeological sites in East Java Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

PT Jasamarga Pandaan Malang (JPM)

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant