Bank of China contributes to syndicated buyer's credit loan for Unit 3 of 220 MW Sirajganj Combined Cycle Power Plant Project (Linked to Record ID#56541)

$59.18M USD

Funder Bank of China (BOC)
Recipient Organization North-West Power Generation Company Limited (NWPGCL)
Country Bangladesh
Start Date Jun 01, 2017
End Date Sep 23, 2033
Duration 5,958 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 69033
Grant Description

China Eximbank contributions to USD 196.7 million syndicated buyer's credit loan for Unit 3 of 220 MW Sirajganj Combined Cycle Power Plant Project In June 2017, North-West Power Generation Company Limited signed a $196.7 million syndicated buyer's credit loan agreement with a group of Chinese and non-Chinese lenders (including Standard Chartered Bank, Bank of China, Siemens Bank, and Deutsche Pfandbriefbank AG) for Unit 3 of the 220MW Sirajganj Combined Cycle Power Plant Project.

Standard Chartered Bank acted as Mandated Lead Arranger for this transaction.

Other roles performed by Standard Chartered Bank includes Structuring Bank, ECA Coordinator, Account Bank, Intercreditor Agent, Hermes Facility Agent, Sinosure Facility Agent, Commercial (MIGA) Facility Agent and Security Agent.

📋 Loan / Grant Terms
💰 Loan Amountwith a maturity of 15 years and a grace period of 3 years

The loan was scheduled for repayment in 24 semi-annual installments.

The loan was split into 3 tranches: a $118.36 million Sinosure-insured loan tranche from Bank of China and Siemens Bank; a $34.03 million Euler Hermes-insured tranche from Deutsche Pfandbriefbank AG, and a $44.34 million commercial tranche insured by MIGA NHSFO from Standard Charted Bank.

The Euler Hermes-insured tranche carried an interest rate of 6-month LIBOR plus a 1.8% margin, while the Sinosure-insured tranche carried an interest rate of 6-month LIBOR plus a 3% margin and the MIGA-insured carried an interest rate of 6-month LIBOR plus a 1.8% margin.

The loan had achieved an 81.6% disbursement rate ($160.68 million out of $196.7 million) as of June 30, 2019 and a 97% disbursement rate ($190.87 million out of $196.7 million) as of June 30, 2020. The Government of Bangladesh provided a sovereign guarantee for debt service.

The loan was also secured (collateralized) with a charge on project assets, including the power plant facility and bank accounts, as well as assignment of project contracts.

The syndicated loan covered 80% of the costs of the project, with the other 20% coming from North-West Power Generation Company Limited.

The borrower (NWPGCL) was expected to use the proceeds of the loan to partially finance an Engineering, Procurement and Construction (EPC) contract that it signed with a consortium consisting of China National Machinery Import & Export Corporation (CMC) and Fujian Electric Power Survey & Design Institute (FEDI) on July 12, 2015.

The purpose of the project was to construct the third power generation unit (Unit 3) of the 220 MW Sirajganj Combined Cycle Power Plant.

More specifically, the project involved the involves the installation of one gas turbine generator (GTG) capable of operating on natural gas and/or High Speed Diesel (HSD), one Gas Booster Compressor, one heat recovery steam generator (HRSG), evaporators, cooling towers, main and by pass stacks connected to a steam turbine Generator (STG) of condensing type for indoor installation, condensate and feed water system, cooling water system and auxiliary equipment.

The project site is located about 15 km south-east of Sirajganj town and 135 km north-west of Dhaka on the western bank of the River Jamuna.

It is located in Khas Barashimul Mouza in the Saidabad Union of Sirajganj Sadar Upazilla (sub-district) of Sirajganj District.

The closest settlements to the project site, Boroshimul and Ponchosona, are both located approximately 1 km from the complex.

China National Machinery Import and Export Corporation (CMC) was the EPC contractor responsible for overall project management. FEDI was responsible for providing technical expertise, including concept design and basic engineering. Under the EPC contract, the contractors were required to commission the project within 2.5-years of the start date.

Construction of the third unit of electricity generators (Sirajganj 3) began on October 19, 2017. Unit 3 was connected to the grid on May 27, 2018. The plant began commercial operations on January 20, 2019.

CMC and FEDI were also the contractors responsible for the implementation of the Bank of China and China Eximbank-financed Unit 2 of the 220MW Sirajganj Combined Cycle Power Plant Project, which is captured via Record ID#56541.

📋 Staff Comments
  1. This project is also known as the Sirajganj 3 Project. Sirajganj is also spelled as Surajganj. The Chinese project title is 孟加拉希拉甘杰225MW联合循环电站3号机组.
  2. North-West Power Generation Company Limited was a state-owned power and electric company in Bangladesh and a 100% subsidiary of the Bangladesh Power Development Board.
  3. The transaction amount is estimated by assuming equal contributions from Bank of China and Siemens Bank to the $118.36 million Sinosure-insured loan tranche.
  4. The collateral fields were coded based on this ICBC source (http://big5.icbc.com.cn/ICBC/%E5%A4%96%E9%83%A8%E8%B0%83%E7%94%A8/%E4%B8%80%E5%B8%A6%E4%B8%80%E8%B7%AF%E6%9C%80%E4%BD%B3%E9%A1%B9%E7%9B%AE%E8%AF%84%E9%80%89/04.htm).
  5. For loan and debt rescheduling records with variable interest rates, AidData calculates the all-in interest rate at T0 based on the reference rate (such as LIBOR or EURIBOR) on the loan start date, plus any known margin. Please see the methodology for additional details.
  6. The Multilateral Investment Guarantee Agency (MIGA) is a member of the World Bank Group. MIGA provides political risk insurance (guarantees) for projects in a broad range of sectors in developing member countries, covering all regions of the world.
  7. For evidence of a mortgage over the power plant assets, see NWPGCL's 2023 Annual Report (https://nwpgcl.portal.gov.bd/sites/default/files/files/nwpgcl.portal.gov.bd/annual_reports/7f1e1d44_cd43_4962_ba9f_2c477102f0ee/2023-11-26-09-37-2f1f8f59f921ab08e3282d6a2e18d80b.pdf).
📚 Sources & References
  • North-West Power Generation Company Limited– Sirajganj Unit 3
  • Lighting up the land of Bangladesh
  • North-West Power Generation Company Limited– Sirajgan
  • NWPGCL
  • Sirajganj 225 MW Combined Cycle Power Plant (Unit-3)
  • North-West Power Generation Company signs debt on 230 MW Sirajganj IPP
  • Share this Another big loan signed in Bangladesh power sector
  • Standard Chartered supports Chinese-built power project in Bangladesh
  • 孟加拉希拉甘杰225MW联合循环电站3号机组正式开工建设
  • CMC successfully ignited the No. 3 unit project of Bangladesh Shiraganj 225MW combined cycle power station, 20. North-West Power Generation Company Limited– Sirajganj Unit 3
  • Annual Report-2019
  • Annual Report 2017
  • Auditor's Report and Audited Financial Statements of North-West Power generation Company Limited For the year ended on 30 June 2021
  • Sirajganj 220MW Combined Cycle Power Plant 3rd Unit (MIGA-13329)
  • Environmental and Social Review Summary Sirajganj 3 Project
  • Annual Report 2023 Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

North-West Power Generation Company Limited (NWPGCL)

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant