Loading…

Loading grant details…

Completed Development AidData Chinese Aid

Chinese Government provides RMB 30 million interest-free loan for Phase 1 of Campus Telephone Network Project (Linked to Record ID#65100 and Record ID#85254)

¥30M RMB

Funder China Ministry of Commerce
Recipient Organization Ministry of Higher Education of Syria
Country Syrian Arab Republic
Start Date Jan 01, 2005
End Date Nov 16, 2030
Duration 9,450 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 67232
Grant Description

Chinese Government provides RMB 30 million interest-free loan for Phase 1 of Campus Telephone Network Project According to a dataset of foreign-financed projects that the Syrian Planning Commission (SPC) provided to UNDP Syria in May 2011, the Chinese Government provided an RMB 30 million ($4,416,000) interest-free loan (captured in Record ID#67232) and an RMB 4 million (USD 588,800) grant (captured in Record ID#65100) to the Government of Syria’s Ministry of Higher Education in 2003 for Phase 1 of the Campus Network Project.

The purpose of the project was to connect the colleges and directorates of the University of Damascus via an internal telephone network and equip students with a prepaid telephone card for reaching out to their families living in the city. ZTE Corporation was the contractor responsible for implementation.

The originally anticipated project implementation start date was January 1, 2003 and the originally anticipated project implementation end date was December 31, 2005.

The first telephone site supported by this project was established at the end of 2005, The project was officially completed and handed over to the local authorities on June 13, 2006. The Chinese Government also financed Phase 2 of Campus Network Project (as captured in Record ID#85254).

📋 Staff Comments

This project is also known as the Campus Network Project. The Chinese project title is 校园网项目. The Arabic project title is مشروع توسعالشبكة الهاتفية or مشروع الشبكة الهاتفية التي تربط الجامعة بالمدينة الجامعية. Since loan terms for the interest-free loan are unavailable, AidData has set maturity period to 20-years by default and grace period to 10-years by default per China's Foreign Assistance White Paper (http://www.cidca.gov.cn/2018-08/06/c_129925064_3.htm) which states that the maturity period of interest-free loans is 20-years, with a drawdown period of 5-years, grace period of 5-years, and repayment over 10-years. AidData treats the drawdown period as providing 5-years of additional grace.

📚 Sources & References
  • 谢参赞与叙大马士革校长签署校园网项目交接文件, 228237_Data_Nader_Projects v1, المقاسم, الواقعحفل تدشين مشروع توسع الشبكة الهاتفية.. ترجمة حقيقية لتعاون سوري-صيني.. والانجازات على أرض
  • Switches
  • The inauguration ceremony of the telephone network expansion project ... a true translation of Syrian-Chinese cooperation ... and the achievements on the ground
  • Telecoms & IT, 228237_Data_Nader_Projects v1.xlsx
  • 驻叙使馆经商参赞与大马士革校长签署校园网项目交接文件, دليل شركاء التعاون الدولي
  • Syria Files FW: Projects, المقاسم, الواقعحفل تدشين مشروع توسع الشبكة الهاتفية.. ترجمة حقيقية لتعاون سوري-صيني.. والانجازات على أرض Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Ministry of Higher Education of Syria

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant