China Development Bank provides $110 million loan for Great Stone Industrial Park Construction Project (Linked to Record ID#66961 and #96419)

¥110M RMB

Funder China Development Bank (CDB)
Recipient Organization CJSC “Industrial Park Development Company”
Country Belarus
Start Date Jan 17, 2013
End Date Mar 10, 2027
Duration 5,165 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 66959
Grant Description

China Development Bank provides $110 million loan for Great Stone Industrial Park Construction Project On January 17, 2013, China Development Bank signed a financing agreement with a China-Belarus joint venture and project company called CJSC “Industrial Park Development Company” (中白工业园区开发股份有限 or China-Belarus Industrial Park Development Company or CBIPDC or Компания по развитию индустриального парка) for the Great Stone Industrial Park Construction Project.

The face value of the loan that CDB subsequently approved is $110 million.

Then, on May 10, 2015, China Eximbank and the Government of Belarus signed a $170 million preferential buyer’s credit (PBC) agreement [CHINA EXIMBANK № РВС (2015) 9 (351)] for the Great Stone Industrial Park Construction Project. The PBC originally carried a maturity of 15-years and a grace period of 6-years.

However, its grace period was extended by an additional year in November 2020 (captured via Record ID#96419). Its interest rate is unknown.

Joint Stock Company "Savings Bank" Belarusbank (JSC JSSB Belarusbank) is the agent bank responsible for servicing the PBC.

The proceeds of the CDB loan (captured in Record ID#66959) and the China Eximbank PBC (captured in Record ID#66961) were to be used by the borrower to finance a commercial contract with China CAMC Engineering Co., Ltd. (CAMCE).

The purpose of the project was to construct the infrastructure of the Great Stone Industrial Park (also known as the China-Belarus Industrial Park or Індустрыяльны парк «Вялікі камень» or Индустриальный парк «Великий камень»), which is located in the Smolevichi district between the Petrovichi reservoir and Minsk National Airport (25 km to the east of the capital city of Minsk).

It involved the construction of 13 km of two-way, six lane roads inside the park; the installation of water supply, drainage, power supply, gas supply, communications systems; the construction of office buildings, warehouses, and factories; and the construction of a 110 kV transformer substation, six 10 kV distributions, 90 km power supply lines, one water supply plant, one rainwater treatment plant, one water intake station, and one secondary lift pump station.

The park was designed to attract global high-tech enterprises with a focus on electronics, biomedicine, and engineering. CAMCE — a subsidiary of Sinomach — was the contractor responsible for project implementation. Its work was overseen by CJSC “Industrial Park Development Company”. The construction of the park, which was modeled on the China-Singapore Suzhou Industrial Park, began on June 19, 2014.

Then, on May 12, 2015, H.E. Chinese President Xi Jinping and his wife Peng Liyuan inspected the project site in the company of H.E. Belarusian President Lukashenko. Construction, which was originally scheduled for completion in 2018, was completed on or around October 16, 2017.

CJSC “Industrial Park Development Company” was founded on August 27, 2012 and it is jointly owned by Sinomach (32%), CAMCE (13.71%), China Merchants Group (20%), Harbin Investment Group (2.29%), and the Government of Belarus (32%).

Its creation followed the signing of an intergovernmental agreement on the China-Belarus Industrial Park on September 18, 2011 and the subsequent ratification of the agreement by both countries on January 30, 2012.

Then, on June 5, 2012, a special legal, regulatory, customs and tax regime was granted to businesses operating within the China-Belarus Industrial Park, providing favorable terms for resident businesses and investors. By the end of 2014, only two companies — affiliates of HUAWEI and ZTE — were operating in the industrial park.

However, by May 2017, 13 companies were operating in the park and 10 additional companies — from China, Belarus, Russia, Austria, the USA and Lithuania — began operating in the park by the end of 2017. Then, in May 2017, the first stage of the China‑Belarus Commerce & Logistics Park was commissioned.

About $120 million was invested in the construction of this logistics subpark with a total area of 100,000 m2.

During the first quarter of 2018, Duisburger Hafen AG (duisport) acquired a 1% stake in CBIPDC, and as part of the transaction, a rail terminal (including a logistics area) was to be built, led by duisport, as well as China Merchants China‑Belarus, the Belarus state‑owned railway and Hupac Intermodal (Swiss), Europe’s leading intermodal (and green logistics) provider.

As of August 2018, there were 36 companies were operating in the park (20 from China and 16 from Austria, Belarus, Germany, Israel, Lithuania, Russia, and the USA). By July 2019, there were 44 companies operating in park.

📋 Staff Comments
  1. This project is also known as the China-Belarus Industrial Park Infrastructure Construction Project and Phase 1 of the Great Stone Industrial Park Construction Project. The Russian project title is проекта Китайско-белорусского индустриального парка or проекта «Строительство инженерной и транспортной инфраструктуры стартовой зоны северной площадки территории первоочередного освоения Китайско-Белорусского индустриального парка «под ключ». The Chinese project title is 中白工业园建设经 or 中白工业园.
  2. It is unclear if the Government of Belarus on-lent the proceeds of the China Eximbank PBC to CJSC “Industrial Park Development Company” (中白工业园区开发股份有限). This issue merits further investigation. The Overseas Development Finance Dataset that Boston University’s Global Development Policy Center published in December 2020 identifies a $3 billion “loan” in 2012 from CDB and China Eximbank for this project. However, this appears to be a reference to two separate $1.5 billion pledges that were made by China Eximbank and China Development Bank in 2012/2013 (see Project ID#42313 and Project ID#73246). According to multiple official sources, this project was ultimately supported by a $170 million PBC from China Eximbank (captured in Project ID#66961) that was finalized on May 10, 2015 and a $110 million loan from China Development Bank (captured in Project ID#66959) that was finalized in 2013.
📚 Sources & References
  • Big, empty, but full of promise? The Great Stone industrial park in Minsk
  • 中白工业园建设经验浅谈
  • January 17th, 2013 News
  • 中国海外最大工业园区在白俄罗斯奠基启动建设
  • 对外投资指南白俄罗斯2019, ”中白工业园-“巨石”
  • China Development Bank Minsk Representative Office Unveiled
  • Yaroshenko and Li Haixin attended the opening ceremony of the Minsk Representative Office of China Development Bank
  • Second Secretary Li Chaohui Meets with the Leader of the Belarusian Working Group of China Development Bank
  • Ambassador Cui Qiming attended the groundbreaking ceremony of the China-Belarus Industrial Park
  • China Development Bank actively supports the development and construction of China-Belarus Industrial Park, ПЕРЕЧЕНЬвнешних государственных займов, обслуживание и погашение которых осуществляются с привлечением средств республиканского бюджета ( LIST of external government loans, servicing and repayment of which are carried out with the involvement of funds from the republican budget), О некоторых вопросах реализации Кредитного соглашения с Экспортно- импортным банком Китая, Постановление СМ РБ 721 О некоторых вопросах реализации Кредитного соглашения с Экспортно-импортным банком Китая от 27.08.2015 - Законодательство Беларуси 2021 год, Постановление СМ РБ 956 О мерах по реализации Указа Президента Республики Беларусь от 30 июня 2014 г. № 326 от 09.10.2014 - Законодательство Беларуси 2021 год, Постановление СМ РБ 387 08.05.2015 О привлечении кредитов Экспортно-импортного банка Китая Подробнее: https://kodeksy-by.com/norm_akt/source-%D0%A1%D0%9C%20%D0%A0%D0%91/type-%D0%9F%D0%BE%D1%81%D1%82%D0%B0%D0%BD%D0%BE%D0%B2%D0%BB%D0%B5%D0%BD%D0%B8%D0%B5/387-08.05.2015.htm, Совмин на год продлил срок привлечения китайского кредита на инфраструктуру 'Великого камня'
  • CHINA-BELARUS INDUSTRIAL PARK IN BELARUS
  • Sinomach Today Vol 44 No.2 Jun.2018
  • 媒体看开行_《人民政协报》:开发性金融:架起“一带一路”的金融桥梁
  • Energy and Infrastructure
  • China-Belarus Industrial Park makes breakthrough in attracting investors-Home-ICBC China
  • BRI Pulse Great Stone Industrial Park (2012-2020), О мерах по реализации Указа Президента Республики Беларусь от 30 июня 2014 г. No 326, Соглашение о финансировании проекта Китайско-белорусского индустриального парка подписано в Пекине, Соглашение о финансировании проекта Китайско-белорусского индустриального парка подписано в Пекине
  • China-Belarus Industrial Park Becoming The First Regional Special Economic Zone of Belarus
  • China's Overseas Development Finance, Совмин на год продлил срок привлечения китайского кредита на инфраструктуру 'Великого камня' Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

CJSC “Industrial Park Development Company”

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant