Loading…

Loading grant details…

Completed Mixed AidData Chinese Aid

China Eximbank provides $407.4 million buyer's credit loan for 600MW Quang Ninh 1 Coal-Fired Power Plant Construction Project (Linked to Record ID#65941)

$407.43M USD

Funder Export-Import Bank of China (China Eximbank)
Recipient Organization Vietnam Electricity (EVN)
Country Viet Nam
Start Date Apr 01, 2006
End Date Nov 20, 2028
Duration 8,269 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 65940
Grant Description

China Eximbank provides $407.4 million buyer's credit loan for 600MW Quang Ninh 1 Coal-Fired Power Plant Construction Project On October 31, 2005, the Export-Import Bank of China and Vietnam Electricity (EVN) — a Vietnamese state-owned power company — signed a loan framework agreement for the 600MW Quang Ninh 1 Coal-Fired Power Plant Construction Project.

Then, on April 1, 2006, China Eximbank and EVN signed a $407,425,533 buyer's credit loan (BCL) agreement (or BLA 06010) for this project.

📋 Loan / Grant Terms
💰 Loan Amountwere as follows: a 13
💹 Interest Rate5.115%

The loan’s final maturity date was 2021.

The borrower was responsible for making 20 consecutive, semi-annual principal payments to the lender on January 21 and July 21 of each year (after the expiration of the grace period).

EVN on-lent the proceeds of the China Eximbank loan to Quang Ninh Thermal Power Joint Stock Company (QTP JSC), a project company that is jointly owned by EVN (80%), Vinacomin (15%), and Vinaconex (5%).

The proceeds of the loan were to be used by the ultimate borrower to finance (a) 85% ($384,545,100) of the total cost ($452 million) of an EPC contract with Shanghai Electric Group Company Limited, which signed on October 31, 2005; and (b) 85% of the cost of an export credit insurance premium provided by Sinosure.

The loan was also collateralized with specific assets, facilities, and equipment of the Quang Ninh 1 Coal-Fired Power Plant and the Quang Ninh 2 Coal-Fired Power Plant (owned by Quang Ninh Thermal Power Joint Stock Company).

The total collateral value of these items (as of June 30, 2022) was VND 18,790,866,943,157 (equivalent 78.67% of the total value of the mortgaged assets).

The purpose of the project was to construct a 600MW coal-fired power plant — with two, 300MW power generation units (Unit 1 and Unit 2) — in Hà Khánh ward, Hạ Long city, and Quảng Ninh province. Shanghai Electric Group Company Limited was the EPC contractor responsible for implementation. Construction began on April 2, 2006.

Unit 1 was connected to the national grid on May 12, 2009.

It completed a reliability test in March 2010 and it secured a temporary Project Acceptance Certificate (PAC) certificate in July 2011. Unit 2 was connected to the national grid on June 2, 2010. It secured a temporary Project Acceptance Certificate (PAC) certificate in April 2011. Units 1 and 2 began commercial operations on July 1, 2011.

📋 Staff Comments
  1. This project is also known as the 2x300MW Quảng Ninh 1 Coal-Fired Power Plant Construction Project. The Vietnamese project title is Dự án Nhiệt điện Quảng Ninh 1 or NDQN 1. The Chinese project title is 广宁火电厂位 or 建的越南广宁火电厂一期工程(600MW) or 南广宁300MW*2 燃煤火电一期.
  2. According to the Overseas Development Finance Dataset that Boston University’s Global Development Policy Center published in December 2020, China Eximbank supported this project with a $176 million loan in 2009.
  3. In 2007, China Eximbank also issued a $355 million buyer’s credit loan for the 600 MW Quang Ninh 2 Coal-Fired Power Plant Construction Project (as captured via Record ID#65941).
  4. Evidence of the loan's collateralization ('Khoản vay này được đảm bảo bằng một số hạng mục công trình, thiết bị của Dự án Nhà máy Nhiệt điện Quảng Ninh 1 và Dự án Nhà máy Nhiệt điện Quảng Ninh 2 với giá trị là 18.790.866.943.157 VND, tương đương 78,67% tổng tài sản thế chấp.') is provided on pg. 19 of http://quangninhtpc.com.vn/userfile/User/taidh/files/2021/2/THUYTCKT/BCTC_signed.pdf.
📚 Sources & References
  • Viet Nam
  • China for comprehensive ties
  • China's Global Energy Finance
  • Lãnh đạo ngã ngựa
  • Nhiệt điện Quảng Ninh có đủ lực để “đảo chiều dòng điện”?
  • Quang Ninh power station
  • 中国公司承建的越南广宁热电厂动工
  • China Sinogy Electric Engineering Co.,Ltd. Company Profile
  • Vietnam Guangning Power Plant
  • 上海电气总承包的越南广宁二期工程4号机组通过试运行
  • Quang Ninh power station
  • THÔNG TIN TÓM TẮT VỀ TỔ CHỨC ĐĂNG KÝ GIAO DỊCH CÔNG TY CỔ PHẦN NHIỆT ĐIỆN QUẢNG NINH
  • Chào sàn với giá gần gấp đôi giá trị sổ sách
  • Nhiệt điện Quảng Ninh có gì hấp dẫn?
  • China's Overseas Development Finance
  • 我公司承建的越南广宁热电厂举行动工仪式
  • Sắp lên sàn UpcoM
  • Nhiệt điện Quảng Ninh còn lỗ lũy kế gần 1.500 tỷ, 2016 Audit Report
  • 中方企业承建的越南火电厂并网发电
  • Bitter taste when depending on Chinese loans
  • Viet Nam
  • China for comprehensive ties
  • Quang Ninh Financial Report Dated Dec 31 2020, 2019-08-14 (7), 11_ TTr thông qua hợp đồng thế chấp động sản và BĐS.pdf, 2019-05-22 (11)
  • Nhà máy Nhiệt điện Quảng Ninh: Nhiều giải pháp giảm nhiệt nước làm mát Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Vietnam Electricity (EVN)

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant