Chinese Government provides RMB 90 million loan — via ETCA — for Phase 1 of V.C Bird International Airport Terminal Project On February 2, 2011, the Chinese Government and the Government of Antigua and Barbuda signed an Economic and Technical Cooperation Agreement (ETCA), which committed an RMB 90 million interest-free loan for Phase 1 of V.C Bird International Airport Terminal Project (as captured via Record ID#64610).
Then, on April 15, 2011, the Export-Import Bank of China signed an RMB 210 million government concessional loan (GCL) agreement with the Government of Antigua and Barbuda for Phase 1 of the V.C Bird International Airport Terminal Project (as captured via Record ID#39633).
Additionally, in 2012, the Chinese Government reportedly provided a grant worth 24 million East Caribbean dollars to the Government of Antigua and Barbuda for the construction of the terminal building (captured via Record ID#71173).
In March 2013, China Eximbank and the Government of Antigua and Barbuda signed an RMB 280 million government concessional loan (GCL) for Phase 2 of the V.C Bird International Airport Terminal Project (captured via Record ID#54573). This GCL carried the following terms: an interest rate of 2% with a maturity of 20-years.
The grace period of the GCL is not identified in publicly available sources.
China Civil Engineering Construction Corporation was the contractor responsible for implementation of Phase 1 and Phase 2. A groundbreaking ceremony occurred on November 2, 2011, and the terminal was ultimately completed on November 5, 2015.
With 23,000 sq. meters of operating space, the terminal has 46 Common Use Terminal Use Equipment counters, 15 self-check kiosks, four loading bridges, state-of-the-art hold baggage screening equipment, and a conveyor system, as well as a plethora of retail spaces. The terminal is designed to handle 1,500,000 person-time annual passenger throughput.