Completed Mixed AidData Chinese Aid

China Eximbank provides $69.3 million preferential buyer’s credit for 120MW Thaukyegat II Hydroelectric Power Plant Construction Project (Linked to Record ID#98029, 96221)

$69.3M USD

Funder Export-Import Bank of China (China Eximbank)
Recipient Organization Government of Myanmar (Burma)
Country Myanmar
Start Date Jan 20, 2010
End Date Jun 01, 2033
Duration 8,533 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 63821
Grant Description

China Eximbank provides $69.3 million preferential buyer’s credit for 120MW Thaukyegat II Hydroelectric Power Plant Construction Project On January 20, 2010, the Government of Myanmar's Ministry of Electric Power No. 1 and China Machinery Engineering Corporation (CMEC) signed a $77 million commercial (EPC) contract for the 120MW Thaukyegat II Hydroelectric Power Plant Construction Project.

China Eximbank and the Government of Myanmar subsequently signed a $69.3 million preferential buyer’s credit (PBC) agreement for the 120MW Thaukyegat II Hydroelectric Power Plant Construction Project. The borrowing terms of the PBC are unknown.

However, it is known that the borrower was to use the proceeds from the PBC to partially finance the EPC contract that was signed on January 20, 2010.

The purpose of the project was to construct a 120MW hydroelectric power plant — with three, 40MW power generation units (Unit 1, Unit 2, and Unit 3) — on Thaukyegyat creek in Taungoo Township and Kayin State.

It involved the construction of a 94 meter high earth dam has created a reservoir that inundates 60 km2 and stores 444 hm3. The power plant is connected to Taungoo substation by a 230 kV transmission line. CMEC was the EPC contractor responsible for implementation.

However, the project was implemented on a BOT basis and a private firm called Gold Energy Company Limited is the project owner. The EPC contract went into effect and the project commenced in November 2010.

Unit 1, Unit 2, and Unit 2 passed a 72-hour trial run assessment on January 25, 2013, January 29, 2013, and March 21, 2013, respectively. The project owner issued a Final Acceptance Certificate (FAC) on April 10, 2014. A formal project completion ceremony took place on December 31, 2014.

There are some indications that the China Eximbank loan for the 120MW Thaukyegat II Hydroelectric Power Plant Construction Project may have financially underperformed vis-a-vis the original expectations of the lender.

In 2020, China Eximbank and the Government of Myanmar signed a debt suspension agreement as part of the G-20 Debt Service Suspension Initiative (DSSI).

Under the terms of the agreement, the lender agreed to suspend principal and interest payments due between May 1, 2020 and December 31, 2020 under 3 buyer’s credit loan (BCL) agreements, 6 government concessional loan (GCL) agreements, and 27 preferential buyer’s credit (PBC) agreements (as captured via Record ID#98029).

Debt service payments under many of these loan agreements were again deferred in 2021 (as captured via Record ID#96221).

📋 Staff Comments
  1. This project is also known as the 3x40MW Thaukyegat II Hydroelectric Power Plant Construction Project, the 120MW Thaukyegat (2) Hydropower Project, the Thauk Ye Khat 2 Hydroelectric Power Plant Project, and the Thout Yay Khat 2 Project. The Chinese project title is 道耶卡水电站项目. The Burmese project title is သောက်ရေခပ်(၂) ရေအားလျှပ်စစ် စီမံကိန်း.
  2. The China Eximbank loan that supported this project is not included in the Overseas Development Finance Dataset that Boston University’s Global Development Policy Center published in December 2020.
  3. According to the World Bank's Debtor Reporting System (DRS), the weighted average maturity of all official sector lending from Chinese creditors to government and government-guaranteed borrowing institutions in Myanmar was 19.3343-years in 2010. AidData estimates the maturity of the China Eximbank loan that supported the 120MW Thaukyegat II Hydroelectric Power Plant Construction Project by using this figure. See https://www.dropbox.com/s/949n5rctiue6d7c/IDS_Average_grace_period_and_maturity_on_new_external_debt_commitments.xlsx?dl=0 4. According to the World Bank's Debtor Reporting System (DRS), the weighted average grace period of all official sector lending from Chinese creditors to government and government-guaranteed borrowing institutions in Myanmar was 5.0126-years in 2010. AidData estimates the grace period of the China Eximbank loan that supported the 120MW Thaukyegat II Hydroelectric Power Plant Construction Project by using this figure. See https://www.dropbox.com/s/949n5rctiue6d7c/IDS_Average_grace_period_and_maturity_on_new_external_debt_commitments.xlsx?dl=0 5. According to the World Bank's Debtor Reporting System (DRS), the weighted average interest rate of all official sector lending from Chinese creditors to government and government-guaranteed borrowing institutions in Myanmar was 3.7267% in 2010. AidData estimates the interest rate of the China Eximbank loan that supported the 120MW Thaukyegat II Hydroelectric Power Plant Construction Project by using this figure. See https://www.dropbox.com/s/ab8qt4n6jijcbhd/IDS_Average%20interest%20on%20new%20external%20debt%20commitments.xlsx?dl=0
📚 Sources & References
  • Myanmar foreign loans rise to US$10.2B in last fiscal yearhttps://www.mmtimes.com/news/myanmar-foreign-loans-rise-us102b-last-fiscal-year.html
  • 镶嵌在缅甸锡塘河上的耀眼明珠——缅甸道耶卡(2)水电站项目侧记
  • Myanmar Thaukyeget (2) Hydropower Project Wins ASEAN Outstanding Engineering Achievement Award
  • Opening Ceremony for CMEC-undertaken Myanmar Thauk-Ye-Khat Hydropower Plant Project Held
  • CMEC缅甸道耶卡水电站项目举行开幕庆典仪式
  • 聚水涌金——探访缅甸总统眼中的中缅合作建设典范水电站
  • 镶嵌在缅甸锡塘河上的耀眼明珠——缅甸道耶卡(2)水电站项目侧记
  • Final Acceptance Certificate Issued for Myanmar Thaukyeget (2) Hydropower Plant
  • 缅甸总统出席缅甸道耶卡水电站项目开幕庆典
  • Thaukyegat (2) Hydropower Project
  • Opening Ceremony for CMEC-undertaken Myanmar Thauk-Ye-Khat Hydropower Plant Project Held
  • Bago Division
  • CMEC's Thaukyegat (2) Hydropower Project in Myanmar Obtains the Final Acceptance Certificate
  • China Machinery Engineering Corporation Annual Report 2014
  • BASELINE ASSESSMENT REPORT HYDROPOWER
  • Modern China-Myanmar Relations Dilemma of Mutual Dependence
  • Supplement to ELECTRICAL INDUSTRY OF BURMA/MYANMAR (Fourth Edition)
  • 驻缅甸大使杨厚兰出席缅甸道耶卡水电站庆典仪式
  • 中国机械设备与缅甸签署道耶卡(2)合同
  • China's Overseas Development Finance, news201211
  • Question on whether there is a plan to renegotiate the contract period for the transfer of all projects to the state under the contract agreements for hydropower projects permitted under the BOT system.
  • Thaukyegat 2
  • CMEC Myanmar Daoyeka Hydropower Project held a celebration ceremony
  • The President of Myanmar Attends the Opening Ceremony of the Daeyeka Hydropower Project
  • Thaukyegat (2) Hydropower Project Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Government of Myanmar (Burma)

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant