Completed Mixed AidData Chinese Aid

China Eximbank provides $159.1 million preferential buyer's credit for Phase 1 of 230 kV Loop Transmission Line Project (Tonle Sap Lake Loop) (Linked to Record ID#62321, #62337, #62340)

$159.16M USD

Funder Export-Import Bank of China (China Eximbank)
Recipient Organization Cambodian Ministry of Economy and Finance
Country Cambodia
Start Date Dec 14, 2015
End Date Apr 03, 2030
Duration 5,224 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 62335
Grant Description

China Eximbank provides $159.1 million preferential buyer's credit for Phase 1 of 230 kV Loop Transmission Line Project (Tonle Sap Lake Loop) On December 14, 2015, China Eximbank and the Government of Cambodia's Ministry of Economy and Finance signed a $159,155,400 preferential buyer's credit (PBC) agreement for Phase 1 of the 230 kV Loop Transmission Line (Tonle Sap Lake Loop) Project.

The PBC carried a 2% interest rate.

The proceeds of the PBC were to be used by the borrower to partially finance an EPC (commercial) contract between Electricite du Cambodge (EDC) — the country’s state-owned electricity utility — and China National Heavy Machinery Corporation (CHMC), which was signed on March 10, 2015.

The purpose of the project was to create 350km of electricity transmission lines that connect four provinces (Battambang, Siem Reap, Kampong Thom, and Kampong Cham) surrounding Tonle Sap lake with high voltage electricity.

More specifically, it sought to build 230 kV power transmission lines running from Battambang to Siem Reap and along the northern edge of the Tonle Sap floodplain through Kampong Thom and Kampong Cham (350 km), linking that line at Kampong Thom with the country’s border with Laos PDR (190 km) and linking Kampong Cham with the Lower Sesan 2 hydropower dam in Stung Treng Province (125 km).

PowerChina Hebei Electric Power Engineering Co., Ltd. (HBEC) was the contractor responsible for project design. China National Heavy Machinery Corporation (CHMC) was the EPC contractor responsible for project implementation. The project officially commenced on June 16, 2016. It was completed and put into operation on March 23, 2019.

Phase 1 of the 230 kV Loop Transmission Line Project was completed in two sections: the Tonle Sap Lake Loop Line section and the Phnom Penh Loop Line section. The China Eximbank-financed Phnom Penh Loop Line section is captured via Record ID#62321.

Phase II of the 230 KV Loop Transmission Line Project was also completed in two sections (Eastern Loop Lines) and funded by China Eximbank.

The PBC provided for Eastern Loop Line Part I is captured via Record ID#62337, and the GCL provided for Eastern Loop Line Part II is captured via Record ID#62340.

📋 Staff Comments
  1. This project is also known as the Phase 1 of the 230 KV Loop Transmission Line Project (Southwest Loop), the South-west Loop Line Electricity Transmission and Transformation Project (Phase Ⅰ), the Tonle Sap Lake Loop Project, and the 440km Battambang-Siem Reap 230kV Power Transmission and Transformation Line Project. The Chinese project title is 洞里萨湖环网 or 马德望─暹粒─磅通─磅湛省的230千伏高压输变电网 or 柬埔寨国家电网230kV西南环网(一期).
  2. In the Overseas Development Finance Dataset that Boston University’s Global Development Policy Center published in December 2020, it identifies the face value of the loan that supported this project as $90 million. AidData relies on the face value of the loan ($159,155,400) that is recorded in the Government of Cambodia’s aid and debt information management system, which is maintained on behalf of all ministries and agencies of the Royal Government of Cambodia by the Cambodian Rehabilitation and Development Board (CRDB) of the Council for the Development of Cambodia (CDC).
📚 Sources & References
  • Battambang-Siem Reap Section of CHMC Cambodia South-west Loop Line Project and Eastern Loop Line Project (Phase Ⅱ)
  • Successfully Went Into Operation
  • Cambodia Southwest and East Looped Network Project
  • Project/Program Information and Implementation Arrangements
  • Sinomach Today
  • 柬埔寨国家电力电网建设现状分析
  • 柬埔寨国家电网230kV西南环网输电工程举行开工仪式
  • 中国电建中标柬埔寨国家电网西南环网输变电线路勘察设计
  • 公司签订柬埔寨国家电网230kV西南环网(一期) EPC工程项目合同
  • 中国重机签订柬埔寨国家电网230kV西南环网(一期)EPC工程项目合同
  • The 230 KV Loop Transmission Line Project in South Western Part of Cambodian National Grid (Phase I)
  • CHMC SIGNED AN EPC CONTRACT OF ONE 230KV LOOP TRANSMISSION LINE IN CAMBODIA
  • Electricite de Cambodge Annual Report 2015
  • 中国电力建设报 2016年6月23日
  • Proposed power transmission lines in Cambodia constitute a significant new threat to the largest population of the Critically Endangered Bengal florican Houbaropsis bengalensis
  • CHMC Starting-up Meeting of Cambodia South-west Loop Line Electricity Transmission and Transformation Project (Phase Ⅰ) Was Held
  • China Overseas Development Finance
  • Project status report for $159.1 million preferential buyer's credit for Phase 1 of 230 kV Loop Transmission Line Project generated on 4/11/2025
  • Annual Report 2016 Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Cambodian Ministry of Economy and Finance

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant