Completed Mixed AidData Chinese Aid

China Eximbank provides $242.2 million preferential buyer's credit for Thnal Kaeng-Ang Kroeung Segment of National Road No. 6 (NR 6) Reconstruction Project (Linked to Record ID#38722, ID#61163)

$242.27M USD

Funder Export-Import Bank of China (China Eximbank)
Recipient Organization Government of Cambodia
Country Cambodia
Start Date Jun 13, 2012
End Date Feb 28, 2031
Duration 6,834 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 61164
Grant Description

China Eximbank provides $242.2 million preferential buyer's credit for Thnal Kaeng-Ang Kroeung Segment of National Road No. 6 (NR 6) Reconstruction Project On June 13, 2012, China Eximbank and the Government of Cambodia signed a $242,269,000 preferential buyer's credit (PBC) agreement for the Thnal Kaeng-Ang Kroeung Segment of the National Road No. 6 (NR 6) Reconstruction Project.

📋 Loan / Grant Terms
📅 Maturity20 years
⏳ Grace Period7 years
💹 Interest Rate2%

The proceeds of the loan were to be used by the borrower to partially finance a $255 million commercial (EPC) contract with Shanghai Construction Group (SCG), which was signed in May 2012.

The Thnal Kaeng-Ang Kroeung Segment of the National Road No. 6 (NR 6) Reconstruction Project was part of a larger initiative that was implemented in three phases (through three separate projects). It was referred to as 'Phase 3' of the larger initiative. It involved the expansion of a 248.525 km of NR 6 between Thnal Kaeng (Thnol Kaing) and Ang Kroeung.

More specifically, it involved an expansion of three segments of NR 6: a 28.725 km segment between Thnal Kaeng District and Skun District in Kampong Thom Province; a 102.9 segment between Skun District to Stueng Saen District in Kampong Thom Province; and 116.9 km segment between Stueng Saen District and Ang Kroeung District in Siem Reap Province.

The ultimate objective of Phase 3 was to increase connectivity between the capital city of Phnom Penh and the ancient capital city of Siem Reap and other northwest regions. The project was designed and built according to Chinese standards, upgrading the NR 6 from a level-3 to level-1 road.

Upon completion, the road was expected to reduce travel time between Siem Reap and Phnom Penh from eight hours to four hours, SCG was the EPC contractor responsible for implementation. The project was supervised by Guangzhou Wanan Construction Supervision Company. Construction officially started on March 5, 2013.

The project was completed in July 2017. The road segment was opened for use on June 11, 2018.

During the four-year project implementation period, approximately 4,000 local construction workers were hired cumulatively, including technicians, constructors, machine operators, and testers, with 90% local staff during the peak construction period. The project indirectly created nearly 10,000 jobs.

The whole length of NR 6 is located on the flood plains of Tonle Sap Lake and Mekong River.

As a result, the road is strewn with pits and hollows in the rainy reason, making travel almost impossible and construction difficult.

From the beginning of construction until project completion, the project team held a number of technical meetings to overcome these and other difficulties.

Based on field observation and data analysis, the parties involved agreed to adopt the Technical Standard of Highway Engineering (JTG B01-2003) issued by the Chinese Ministry of Transport in the subgrade construction plan, and use the GB/T19001-2000 idt ISO9001: 2000 for quality assurance.

📋 Staff Comments
  1. This project is also known as the Reconstruction Project of Thnal Kaeng to Ang Kroeung Segment of National Road No. 6 and the Construction and Rehabilitation of NR 6 (Thnol Kaing-Skun-Kampong ThomAng Kroeung. The Chinese project title is 扩修6号公路磅湛省巴提县弯路至暹粒省安格隆地区路段 or 柬埔寨国家6号公路改造项目 or 柬埔寨 6 号国家公路改建项目.
  2. China Eximbank also financed Phase 1 (also known as the National Road No. 61 (NR. 61) Rehabilitation Project) and Phase 2 (also known as the Siem Reap-Kampong Cham Segment of the National Road No. 6A (NR 6A) Enlargement Project) of the larger initiative. Phase 1 is captured in Project ID#38722 and Phase 2 is captured in Project #61163. The loan (PBC) agreements for all three phases were signed on June 13, 2012.
📚 Sources & References
  • National Road 6A
  • Siem Reap - Kampong Cham Expressway
  • Exporting the Chinese Model to BRI Countries: Cambodia as A Case Study
  • China-funded national road inaugurated in Cambodia
  • 我优买资金支持的柬埔寨6号公路扩建项目正式开工
  • 中柬签署7项经贸合作协议
  • China Export-Import Bank loans to Cambodia 2018
  • Project/Program Information and Implementation Arrangements
  • 熊波大使同洪森首相共同出席6号公路启用仪式
  • 熊波大使同洪森首相共同出席中国援柬埔寨国家6A号公路启用仪式
  • 中企在柬埔寨项目详情
  • 中国援建柬埔寨6号公路极大提升当地互联互通水平
  • 洪森宣布:中援6号路扩建工程开工 金边暹粒车程将缩至3小时
  • 熊波大使同洪森首相共同出席6号公路启用仪式
  • 柬埔寨国家6号公路举行启用仪式
  • 我优买资金支持的柬埔寨6号公路扩建项目正式开工
  • 我优买资金支持的柬埔寨6号公路扩建项目开工
  • 中國大陸援助建設之柬埔寨6號公路全面完成
  • 熊波大使同洪森首相共同出席中国援柬埔寨国家6A号公路启用仪式
  • Overview on Transport Infrastructure Sectors in the Kingdom of Cambodia (5th Edition)
  • PUBLIC INVESTMENT PROGRAMME 3-YEAR-ROLLING 2014 - 2016
  • 上海建工集团股份有限公司关于签订海外重大工程合同的公告, 2022 Best Practices of Sustainable Infrastructure. Projects
  • Cambodia National Road 6 Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Government of Cambodia

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant