Completed Development AidData Chinese Aid

China Eximbank provides RMB 110 million government concessional loan for Hall 5 of Cairo International Convention Center Construction Project (Linked to Record ID#436)

¥110M RMB

Funder Export-Import Bank of China (China Eximbank)
Recipient Organization Government of Egypt
Country Egypt
Start Date Jan 01, 2009
End Date Feb 23, 2028
Duration 6,992 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 60529
Grant Description

China Eximbank provides RMB 110 million government concessional loan for Hall 5 of Cairo International Convention Center Construction Project On June 17, 2006, the Chinese Government and the Government of Egypt signed a preferential loan framework agreement, which specified the terms on which the Government of Egypt could borrow up to RMB 400 million ($61 million) from China Eximbank for the Cairo International Conference Center (CICC) Refurbishment and Hotel Construction Project.

It specified a 2% interest rate. However, the specified maturity length and grace period are unknown.

This framework agreement was presented to and considered by the Egyptian Parliament in December 2006 ( تقديم قرض تفضيلى من الصين الى مصر لايتجاوز 400 مليون يوان صينى لتنفيذ مشروع تطوير وتأهيل مركز القاهرة الدولى للمؤتمرات وبناء فندق ملحق).

The original purpose of this project was to rehabilitate the Cairo International Conference Center (CICC or 开罗国际会议中心 or مركز القاهرة الدولي للمؤتمرات), which was constructed during the 1980s with financial support from the Chinese Government, and to build a five-star hotel at or near the CICC).

It was originally envisaged that the hotel would cover 20,000 square meters and have 300 rooms. Construction was expected to take 24 months. However, this project appears to have been substantially rescoped and downsized.

On May 12, 2008, the Chinese Embassy on Egypt reported that Shanghai Construction Engineering Group (SCG) (上海建工) had signed a project implementation contract with the Egyptian General Authority for Exhibitions (EGAE).

The contract stipulated that EGAE would use the proceeds from a previously committed concessional loan to fully finance an RMB 110 million contract with SCG.

The purpose of the contract was for SCG to construct Hall 5 (“No. 5 building”, “5th Hall”, or “5号馆”) at the CICC.

Hall 5 is a building that covers an area of 13,500 meters^2, and contains a corridor connecting it to the showroom complex on one side and Hall 4 on the other.

The display area is 4550 meters^2 and it has a maximum load on its floor of 2.5 tons/sq.m as well as ceiling height of 11 meters. A formal groundbreaking ceremony took place on December 26, 2008.

Chinese Premier Li Keqiang (李克强) and Egyptian Minister of Trade and Industry, Rachid Mohammed Rachid, participated in the ceremony. However, construction did not begin until July 20, 2009.

According to SCG, it had to evacuate all 13 of its employees working on the CICC — specifically, those constructing Hall 5 — due to large scale demonstrations and riots on February 22, 2011. However, on November 15, 2011, the project was officially completed and handed over to the local authorities.

📋 Staff Comments

This project is also known as the Cairo International Conference Center Rehabilitation and Five-Star Affiliated Hotel Construction Project. The Chinese project title is 开罗国际会议中心改造和附属酒店建设项目 or 开罗国际会议中心配套工程 or 的开罗国际会议中心新建5号馆正 or 建的开罗会议中心新建五号馆项目 or 五号馆项目 or 开罗国际会议中心新建5号馆项目 or 开罗国际会议中心新建五号馆项目 or 五号馆工程. The Arabic project title is تأهيل وتطوير مركز القاهرة الدولى للمؤتمرات وبناء فندق ملحق به or مركز القاهرة الدولى للمؤتمرات وانشاء فندق خمسة نجوم تابع للمركز. In the database of Chinese loan commitments that SAIS-CARI released in July 2020, it identifies the face value of the China Eximbank loan that supported this project as $61 million (RMB 400 million). AidData records the amount (RMB 110 million) that it knows the Government of Egypt borrowed under the terms of the RMB 400 million preferential loan framework agreement. In June 2008, Egyptian Presidential Decree No.134 merged the CICC and EGAE together. Then, in October 2009, Egyptian Presidential Decree No.345 renamed the merged organizations as the Egypt Exposition and Convention Authority (EECA)

📚 Sources & References
  • 泰达苏伊士经贸合作区酒店项目获准
  • 开罗国际会议中心改造和附属酒店建设项目商务合同在开罗草签
  • 李克强出席集团总公司融资、设计和施工总承包的开罗国际会议中心配套酒店奠基仪式
  • 集团承建的开罗国际会议中心新建5号馆正式移交, صالة 5
  • HALL ( 5 )
  • 驻埃及大使宋爱国出席开罗国际会议中心新建五号馆项目对外交接仪式
  • HISTORY OF EGYPT EXPO & CONVENTION AUTHORITY
  • 中埃成功合作项目--开罗国际会议中心
  • 李克强出席开罗国际会议中心配套工程奠基仪式
  • Egypt
  • China sign agreements as premier tours
  • 开罗国际会议中心
  • 上海建工
  • 难忘非洲
  • 李克强出席集团总公司融资、设计和施工总承包的开罗国际会议中心配套酒店奠基仪式
  • People's Daily Online -- Chinese
  • Egyptian PMs hold talks over ties
  • 中埃经贸合作硕果累累_新闻中心_新浪网
  • 开罗国际会议中心
  • Chinese
  • Egyptian PMs hold talks over ties
  • 第一节援外工程
  • Chinese Firms Brave Uncertainty in Egypt to Gain a Foothold in Middle East
  • 曹家昌参赞参赞
  • 埃及投资环境调研和双边经贸条件分析
  • 我援开罗国际会议中心五号馆对外交接
  • 我援开罗国际会议中心五号馆对外交接
  • 我援开罗国际会议中心五号馆对外交接
  • Chinese Loans to Africa Database, مجلس الشعب المصرى يناقش الاتفاقيات الدولية, رئيسا وزراء الصين ومصر يبحثان العلاقات الثنائية, مشروع التعاون الناجح بين الصين ومصر مركز القاهرة الدولي للمؤتمرات, على حسن السعدنى - العلاقات المصرية الصينية Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Government of Egypt

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant