Completed Mixed AidData Chinese Aid

[Sino-Congolese Programme] China Eximbank provides $24.1 million loan for Boulevard 30 Juin Construction (Lot 1) Project (Linked to Record ID#450, #59427, and #85286)


Funder Export-Import Bank of China (China Eximbank)
Recipient Organization Sino-Congolais des Mines (Sicomines SARL)
Country Democratic Republic of the Congo
Start Date Jan 01, 2009
End Date Sep 05, 2033
Duration 9,013 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 59429
Grant Description

[Sino-Congolese Programme] China Eximbank provides $24.1 million loan for Boulevard 30 Juin Construction (Lot 1) Project In 2008, China Eximbank issued a $3.003 billion general buyer's credit loan to Sino–Congolais des Mines (Sicomines SARL) — a joint venture — to finance infrastructure projects in the DRC (as captured via Record ID#450).

All subsidiary borrowings under the (government-guaranteed) general buyer's credit loan agreement were to be repaid with revenues from mining projects managed by Sicomines SARL.

📋 Loan / Grant Terms
💰 Loan Amountcarried a maturity of 25 years

All infrastructure projects supported through the general buyer's credit loan were part of the so-called “Sino-Congolese Programme." One of the subsidiary loans issued as part of the “Sino-Congolese Programme” was a $24,118,559.82 loan for Boulevard 30 Juin Construction (Lot 1) Project.

The purpose of the project was to improve traffic flow and conditions along the 5.32 km stretch of Boulevard du 30 Juin between Central Station and Socimat. China Railway Engineering Corporation (CREC) was the contractor responsible for implementation.

Construction began on January 1, 2010, with a planned project duration of 18 months and an expected completion date in September 2011. The project was ultimately completed on July 29, 2014.

📋 Staff Comments
  1. The French project title is Travaux sur le boulevard du 30 juin lot 1.
  2. The refurbishment of the 0.5 km Central Station Loop (located at the end of Boulevard 30 Juin) occurred simultaneously to this project (French Name: Boucle de la Gare centrale) and the China Eximbank loan that supported the refurbishment of the 0.5 km Central Station Loop is captured via Project ID#85286. The China Eximbank loan for the Boulevard 30 Juin Construction (Lot 2) Project is captured via Project ID#59427.
  3. Given that AidData has captured the entire $3.003 billion China Eximbank loan commitment amount for multiple infrastructure projects via Project ID#450, it does not record a financial commitment (transaction) amount for the subsidiary loan supporting this project to avoid double-counting.
  4. For loan and debt rescheduling records with variable interest rates, AidData calculates the all-in interest rate at T0 based on the reference rate (such as LIBOR or EURIBOR) on the loan start date, plus any known margin. Please see the methodology for additional details.
📚 Sources & References
  • La Chine en RD Congo : présence économique, financements et les créances
  • Mise en œuvre de la convention de collaboration entre la RDC et le Groupement d'entreprises chinoises: Défis de la transparence, de la qualité et du respect des droits humains dans la réalisation des infrastructures du projet Sicomines à Kinshasa
  • The impact of Sicomines on development in the Democratic Republic of Congo
  • Rapport Annuel 2012
  • ChinaLoansToAfrica©SAIS-CARI.csv, https://foreignpolicymag.files.wordpress.com/2018/06/01911-sicomines-workingpaper-landry-v6.pdf, drc-china infrastructure status march 2011
  • The Sicomines agreement revisited: prudent Chinese banks and risk-taking Chinese companies
  • Rapport de Conciliation ITIE RDC 2015 - signé.pdf
  • Sicomines : un bel exemple de coopération sino-africaine
  • Boulevard du 30 Juin Lot 1
  • Boulevard du 30 Juin Lot 1, 5.32 km Boulevard du 30 Juin Lot 1.pdf
  • Boulevard Du 30 Juin Kinshasa
  • Boulevard Du 30 Juin Kinshasa
  • Rapport Annuel 2013
  • Rapport Annuel 2017
  • Rapport Annuel 2011
  • Plan du Travail, 2018 Annual Report
  • Rapport D'Activite 2014 Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Sino-Congolais des Mines (Sicomines SARL)

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant