Loading…

Loading grant details…

Active Development AidData Chinese Aid

China Road & Bridge Corporation finances Mineral Port at Pointe-Noire (Linked to Record ID#30501)

$345M USD

Funder China Road & Bridge Corporation (CRBC)
Recipient Organization Government of Republic of Congo
Country Congo
Start Date Feb 20, 2016
End Date May 02, 2033
Duration 6,281 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 59142
Grant Description

On February 20, 2016 the China Road and Bridge Corporation(CRBC) and Congolese Minister of Land and Resources Engineering signed an agreement for the construction of an ore port in Pointe Noire.

The project is called the Pointe-Noire New Port Project (also known as the Mineral Port at Pointe-Noire Project) (黑角矿业港项目). CRBC will cover 15% of the total cost, $345 million.

China Eximbank will loan $1.61 billion to cover 70% of the cost, the contractor and the Congolese government will provide the remaining 15%. In total, the estimated cost of this project is $2.3 billion. The contractor is CRBC.

On March 29, 2013 China and the Republic of Congo signed cooperation agreements in Brazzaville, including construction a new port for mineral ore shipments at Pointe-Noire.

In December 2015, during the Summit of the China-Africa Cooperation Forum, the company's chairman Wen Gang and Gangfang successfully signed the "Congo (Brazzaville) Point Noire Mining Port Construction Project Cooperation Protocol" in Johannesburg. This project is located at about 8km north of the Pointe Noire Old Port and the construction period is 54 months.

Its construction content mainly includes 1 300,000 dwt iron ore export pier (2 berths), 1 breakwater in the southern side of the port, 150,000 dwt fertilizer berth, 2 50,000 dwt multi-purpose berths, 4km-long 200,000 dwt channel, 4.2km-long 50,000 dwt channel, port area dump site with the total land area of about 1,175,000 square meters, marine reclamation land with an area of about 1,396,000 square meters and phase-I project with a total through capacity of 41.95 million ton per year.

Besides, this project also covers the construction of the 19km-long highway to port and 29.6km-long railway to port. The project is Linked to Record ID#30501, Eximbank's portion of the funding for the port.

📋 Staff Comments

The status of the project is unknown.

📚 Sources & References
  • The Republic of the Congo and China Further Strengthen Their Cooperation
  • Demand for resources drives African rail boom
  • Congo-Brazzaville: China to Build Tanker Port at Pointe Noire
  • 中国路桥公司与刚方签署黑角矿业港项目商务合同
  • Les projets de coopération au centre d’une audience entre le ministre BOUYA et le nouvel ambassadeur de Chine au Congo
  • 中国路桥公司与刚方签署黑角矿业港项目商务合同
  • Sassou in Beijing on post-electoral cash call
  • China in the African Ports: A String of Pearls in the Making?
  • Decree 2015-178
  • President Denis Sassou Nguesso of the Republic of Congo attended the cornerstone laying ceremony for the office building of Pointe Noire Port
  • China's Xi wraps up Africa tour in Republic of Congo Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Government of Republic of Congo

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant