Completed Mixed AidData Chinese Aid

China Eximbank provides $187 million preferential buyer's credit for Dire Dawa-Dewalle Toll Road Project

$187M USD

Funder Export-Import Bank of China (China Eximbank)
Recipient Organization Government of Ethiopia
Country Ethiopia
Start Date May 04, 2014
End Date Aug 27, 2027
Duration 4,863 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 58972
Grant Description

China Eximbank provides $187 million preferential buyer's credit for Dire Dawa-Dewalle Toll Road Project On May 4, 2014, China Eximbank and the Government of Ethiopia signed a $187,000,000 preferential buyer credit (PBC) loan agreement [CHINA EXIMBANK PBC No. (2014) 03 Total No. (297) No. 1420303052013211786] with China Eximbank for the Dire Dawa-Dewalle Toll Road Project.

The Ethiopian the House of Representatives ratified the PBC agreement under Proclamation no. 854/2014 on June 24, 2014. The Government of Ethiopia's on-lent the proceeds of the loan to Ethiopia Roads Authority (ERA).

📋 Loan / Grant Terms
⏳ Grace Period7.725 years
💹 Interest Rate2%

The loan's first and last scheduled principal payment dates were January 21, 2022 and July 21, 2035, respectively. Its first and last scheduled interest payment dates were January 21, 2015 and January 21, 2034, respectively.

The borrower was expected to use the proceeds of the PBC to finance 85% of the cost of a $216,530,065.53 (ETB 3,986,318,506.35) commercial (EPC) contract between ERA and China Geo-engineering Construction Overseas Company Group (CGCOC), which was signed on March 5, 2013.

The ERA was responsible for directly funding 15% (ETB 597,947,775.95 or $32,479,509.829) of the commercial contract cost.

According to the Government of Ethiopia’s Aid Management Platform (AMP), the ETB 3,824,329,330 China Eximbank loan achieved a 92% disbursement rate, with China Eximbank making 13 loan disbursements (worth ETB 3,504,749,269) between 2014 and 2019: an ETB 1,127,312,414 disbursement on December 5, 2014, an ETB 134,979,543 disbursement on September 22, 2015, an ETB 232,092,985 disbursement on January 27, 2016, an ETB 278,697,350 disbursement on March 22, 2016, an ETB 201,034,192 disbursement on June 28, 2016, an ETB 243,047,849 disbursement on November 17, 2016, an ETB 41,534,408 disbursement on February 9, 2017, an ETB 51,830,494 disbursement on May 10, 2017, an ETB 321,959,701 disbursement on June 20, 2017, an ETB 271,887,740 disbursement on September 25, 2017, an ETB 100,050,872 disbursement on February 1, 2018, an ETB 86,890,755 disbursement on April 27, 2018, and an ETB 413,430,966 disbursement on November 28, 2019.

The purpose of the project was to construct a 220 km toll road from Dire Dawa (Diredawa) to Dewalle (Dawale).

The road was constructed according to the following standard: 7 meters wide and 5 cm thick single layer of asphalt concrete, with 2 by 1.5m at the highway shoulder. CGCOC was the general EPC contract responsible for project implementation. Shandong Great Supervision and Consultation Co., Ltd. provided the consulting services for the project.

The project commenced in October 2014. It was completed in December 2018. The road was officially inaugurated on June 18, 2019. Upon completion, the toll road was officially transferred to the Ethiopian Toll Roads Enterprises.

The completion of the project has reportedly reduced the travel time from Dire Dawa city to the Djibouti border from 10 hours to 4 hours.

However, according to an October 2021 report, '[t]hus far, there is not much traffic on the road, which leads through the desert and has almost no services or other urban settlements along it.

This highway could become financially viable by providing a faster link between Addis Ababa and Djibouti, but only when the missing sections between AdamaAwash-Mieso-Dire Dawa are built.

While the AfDB and the WB are preparing financing for some of these missing sections, Chinese financing of the Dire Dawa-Dewele section was premature.’ To access the toll road, truck drivers are required to pay ETB 200 ($7); mid-size trucks are required to pay ETB 150; and automobile drivers are required to pay ETB 100.

As of late 2021, there was no data available on the amount of toll revenue generated by the road.

There are some indications that the China Eximbank loan for the Dire Dawa-Dewalle Toll Road Project may have financially underperformed vis-a-vis the original expectations of the lender.

According to the Government of Ethiopia’s Aid Management Platform, as of September 2019, ICBC suspended about $67 million worth of loan disbursements 'due to [the] cross-default situation of the country’ (see Record ID#58616).

Then, in August 2021, China Eximbank withheld $339 million loan disbursements for 12 projects and halted project implementation due to Government of Ethiopia’s rapidly dwindling foreign exchange reserves and debt sustainability challenges.

📋 Loan / Grant Terms
📅 Maturity5 years
⏳ Grace Period1 year

Then, after considerable delay, the G20 Common Framework (CF) creditor committee for Ethiopia convened in September 2021, with the French Government and the Chinese Government serving as co-chairs. The CF debt rescheduling talks were still ongoing in mid-2023.

📋 Staff Comments
  1. Dire Dawa-Dewalle is also spelled Dire Dawa-Dewele and Diredawa-Dawale in source materials.
  2. The loan identification number in the Government of Ethiopia’s Debt Management and Financial Analysis System (DMFAS) is 20882000 and the corresponding project name in DMFAS is ‘EBC 14/03 DIRE DA-DEWELE ROAD’. See https://www.dropbox.com/scl/fi/je0aon75miofi6mt4q5q9/MOFED-Loan-Level-Data-on-Borrowing-Terms-and-Loan-Performance-September-2024_PUBLIC.xlsx?rlkey=murbb074v1px7g4njt0utzxnf&dl=03. This project is also known as the Dire Dawa-Dawale Road Project. The Chinese project title is 埃塞俄比亚DIRE DAWA-DEWELLE公路项目.
  3. The system identification number for this project in the Government of Ethiopia’s Aid Management Platform (AMP) is 87143359109028. Two different loan commitment values are reported in the AMP: ETB 3,986,318,506.35 and ETB 3,824,329,330. The discrepancy is likely due to exchange rate differences.
  4. One source identifies the face value of the loan as $186,758,091.53 rather than $187,000,000. For the time being, AidData relies on the face value of the loan that is recorded in the Government of Ethiopia's DMFAS.
📚 Sources & References
  • 中国进出口银行与埃塞政府签订项目贷款协议
  • The Dire Dawa—Dewelle Toll Road Project—that connects Eth to Djibouti is inaugurated today. A key gov’t deliverable in the 3rd 100 days plan, the project offers an alternative to the main Galafi route—reducing congestion and transit distance to Djibouti by 100kms.@dagmawit_moges
  • Dire Dawa-Dewele Toll Road Project Inaugurated
  • Ethiopia inaugurates US $179m Dire Dawa-Dewele toll road project
  • Ethiopia DIRE DAWA-DEWELLE Highway Project
  • THE DATA COLLECTION SURVEY FOR DJIBOUTI CORRIDOR
  • An ‘age of choice’ for infrastructure financing? Evidence from Ethiopia
  • 由中国政府融资的埃塞第二条收费公路落成
  • Public Sector Debt Statistical Bulletin 1 - 22
  • Chinese-built Ethiopian expressway witnesses increasing traffic
  • Ethiopia inaugurates toll road to Djibouti
  • Feature: Landlocked Ethiopia taps into Chinese-built toll road to drive trade
  • Chinese-built Ethiopian expressway witnesses increasing traffic
  • 中地海外集团埃塞俄比亚矿业发展设想
  • ERA Awards Two Chinese Companies 5b Br Road Projects
  • Chinese-built toll road mobilizes trade, economy in Ethiopia
  • Public Sector Debt Statistical Bulletin No 13
  • ERA Awards Two Chinese Companies 5b Br Road Projects
  • Ethiopia’s Second Toll Road Starts Operation, https://img1.wsimg.com/blobby/go/87d8897e-0526-4b64-8769-54eb32823548/Chinas-Overseas-Lending-for-Transport-Projects.pdf
  • Export-Import bank of China Loan Agreement for Financing the Diredawa-Dawale Road Project Ratification Proclamation
  • MOFED Loan-Level Data on Borrowing Terms and Loan Performance September 2024_PUBLIC
  • Dire Dawa - Dawale Road projet Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Government of Ethiopia

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant