Chinese Government provides RMB 141 million interest-free loan for Lot 1 of Akassato-Bohicon Road Rehabilitation Project (Linked to Record ID#30834, #58807, #73406)

¥141M RMB

Funder China Ministry of Commerce
Recipient Organization Government of Benin
Country Benin
Start Date Jan 01, 2013
End Date Aug 17, 2029
Duration 6,072 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 58722
Grant Description

Chinese Government provides RMB 141 million interest-free loan for Lot 1 of Akassato-Bohicon Road Rehabilitation Project On 5 October, 2012, the Chinese Government and the Government of Benin signed a CFA 129 billion preferential loan framework agreement for the Akassato-Bohicon Road Rehabilitation Project.

📋 Loan / Grant Terms
📅 Maturity20 years
⏳ Grace Period7 years

In 2013, China’s Ministry of Commerce and the Government of Benin signed an RMB 141 million interest-free loan agreement for Lot 1 and an RMB 362.1 million interest-free loan agreement for Lot 2.

📋 Loan / Grant Terms
💰 Loan Amountagreement [CHINA EXIMBANK GCL 2013 NO
📅 Maturity20 years
⏳ Grace Period7 years
💹 Interest Rate1%

The proceeds of the MOFCOM loan for Lot 1 were to be used by the borrower to finance a commercial contract with China Geo-Engineering Corporation (CGC).

The proceeds of the MOFCOM loan for Lot 2 were to be used by the borrower to finance a commercial contract with Chongqing International Construction Corporation (CICO) worth 30 billion CFAF.

The proceeds of the GCL were to be used by the borrower to finance a commercial contract (ID#74/MTPT/DNCMP/SP) between Benin’s Ministry of Public Works and Transportation and China Xinxing Group General Corporation, which was signed on 5 March, 2013.

The Akassato-Bohicon Road Rehabilitation Project involved the rehabilitation of a 103.8 km road segment along the No. 2 Interstate Highway from Akassato to Bohicon. The project was divided into three lots. Lot 1 involved the rehabilitation of a 12.3 km section from Akassato to Glo-Djigbé (PK 14 + 200 to PK 26 + 500).

Lot 2 involved the rehabilitation of a 19.26 km section from Glo-Djigbé to Allada (PK 26 + 500 to PK 45 + 760). Lot 3 involved the rehabilitation of a 73 km section from Allada to Bohicon (PK45 + 760 to PK1 17 + 865).

A formal groundbreaking ceremony for Lot 1 took place on 5 January, 2013; however, Lot 1 construction did not commence until April 30, 2013. Lot 1 was officially handed over to the Government of Benin on 12 August, 2015. A formal groundbreaking ceremony for Lots 2 and 3 was held on 16 January, 2014.

Lot 2 was officially handed over to the Government of Benin on 28 September, 2016. Lot 3 was completed in March 2016. Record ID#30834 captures the CFA 129 billion preferential loan framework agreement. This project captures the RMB 141 million interest-free loan from MOFCOM for Lot 1. Record ID#73406 captures the RMB 362.1 million interest-free loan from MOFCOM for Lot 2.

Record ID#58807 captures the RMB 800 million interest-free loan from China Eximbank for Lot 3.

📋 Staff Comments
  1. The French project title is Projet de Réhabilitation de la route Akassato-Bohicon. The Chinese project title is 阿卡萨多-博依贡公路 or 贝宁阿卡萨多—博伊贡公路项目 or 阿卡萨托—博希孔公路修复工程.
  2. According to the Parliament of Benin, the Chinese Government provided RMB 503.1 million of loans for Lot 1 and Lot 2. The face value of the loan that supported Lot 1 was RMB 141 million, so AidData assumes that the face value of the loan that supported Lot 2 was RMB 362.1 million.
  3. Since loan terms for the interest-free loan are unavailable, AidData has set maturity period to 20-years by default and grace period to 10-years by default per China's Foreign Assistance White Paper (http://www.cidca.gov.cn/2018-08/06/c_129925064_3.htm) which states that the maturity period of interest-free loans is 20-years, with a drawdown period of 5-years, grace period of 5-years, and repayment over 10-years. AidData treats the drawdown period as providing 5-years of additional grace.
📚 Sources & References
  • 驻贝宁大使刁鸣生出席中国援建项目竣工仪式
  • 刁鸣生大使出席援贝宁阿-博公路二标段交接仪式
  • 驻贝宁大使陶卫光出席中国援贝阿—博公路二、三标段开工仪式
  • 贝宁总统亚伊出席我援贝公路项目开工仪式
  • 驻贝宁大使刁鸣生赴我援贝项目现场办公
  • 驻贝宁大使陶卫光出席中国援贝阿—博公路二、三标段开工仪式
  • Allocution de Monsieur DIAO MINGSHENG, ambassadeur extraordinaire et plénipotentiaire de la République Populaire de Chine en République du Bénin, lors de la cérémonie de remise du projet de la réhabilitation de la route AKASSATO-BOHICON LOT 1 et du projet d'aménagement paysager et de canal de l'échangeur de Godomey financés par le gouvernement chinois
  • Ambassadeur de Chine a accompagné le Président Bony Yayi à la cérémonie de démarrage des travaux de la restauration de la route Akassato-Bohicon
  • Allocution de S.E.M. DIAO Mingsheng à l'occasion de la réception organisée pour célébrer le 66e anniversaire de la fondation de la République populaire de Chine
  • Passive agents? Bureaucratic agency in Africa-China negotiations: A case study of Benin.
  • Remise du deuxième lot de la route Akassato-Bohicon
  • Road Rehabilitation Project Akassato Bohicon LOT 1: 12.3km
  • Road Rehabilitation Project Akassato Bohicon LOT 1: 12.3km
  • 驻贝宁大使刁鸣生出席中国援建项目竣工仪式
  • DECRET N'2013-343 DU 30 AOUT 2013
  • 刁鸣生大使出席援贝宁阿-博公路二标段交接仪式
  • Réhabilitation de la route Akassato-Bohicon:Le lancement des travaux des lots 2 et 3 prévu pour ce mois (Lire un extrait du communiqué du Conseil des ministres)
  • Akassato-Bohicon: démarrage du tronçon lot 2 du projet de réhabilitation
  • LES TRAVAUX DE LA ROUTE AKASSATO-BOHICON DEMARRENT ENFIN
  • Benin-Cotonou: EEF — Bauleitung und Bauaufsicht für die Sanierungsarbeiten der zwischenstaatlichen Nationalstraße Nr. 2
  • Abschnitt: Allada — Bohicon (73 km)
  • Assemblée Nationale : adoption du projet de financement partiel de réhabilitation de la route Akassato-Bohicon
  • 中地集团贝宁阿克萨多-博伊贡公路第一标段移交仪式
  • THE REPUBLIC OF BENIN PROSPECTUS
  • Portefeuille détaillé des Projets Actifs au 30 septembre 2016
  • Chinese Loans to Africa Database
  • Benin 2019 Bond Prospectus
  • DECRET N'2013-343 DU 30 AOUT 2013
  • Liste de prêts des institutions gouvernementales chinoises de 2000 à 2017
  • Allocution de Monsieur DIAO MINGSHENG, ambassadeur extraordinaire et plénipotentiaire de la République Populaire de Chine en République du Bénin, lors de la cérémonie de remise du projet de la réhabilitation de la route AKASSATO-BOHICON LOT 1 et du projet d'aménagement paysager et de canal de l'échangeur de Godomey financés par le gouvernement chinois Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Government of Benin

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant